• Title/Summary/Keyword: Water Balance Analysis Method

Search Result 119, Processing Time 0.023 seconds

Start-up dynamics in a CMSMPR crystallizer (CMSMPR 결정화기의 시동 특성 연구)

  • 신영준;이철수
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1986.10a
    • /
    • pp.200-204
    • /
    • 1986
  • Particle size distribution in a Continuous Mixed Suspension Mixed Crystal Removal (CMSMPR) crystallizer has been analyzed using the Population Balance (PB) model. This method presents difficulties when the growth rate of crystal depends on the crystal size. Recent studies indicate that in many cases the growth rate is dependent on size when the crystal sizes are small. In this study, a Residence Time Distribution(RTD) model was proposed to take the size dependence into account together with an appropriate numerical scheme. When compared with the approximate results based on PB model, RTD model results showed improvements also a nucleation effect which is normally unimportant for steady state analysis. Start-up data for NaCl-Water-Ethanol system was compared with computed values.

  • PDF

Impact of Design Parameters on Length and Application Effect of Surface Water Heat Exchanger(SWHE) (지표수 열교환기의 용량과 적용 효과에 대한 설계 인자의 영향)

  • Sohn, Byonghu;Min, Kyong-Chon
    • Transactions of the KSME C: Technology and Education
    • /
    • v.4 no.1
    • /
    • pp.49-56
    • /
    • 2016
  • Commercial buildings are generally cooling-dominated and therefore reject more heat to a vertical ground heat exchanger(GHE) than they extract over the annual cycle. Shallow ponds can provide a cost-effective means to balance the thermal loads to the ground and to reduce the length of GHE. The objective of this work has been to develop a design tool for surface water heat exchanger(SWHE) submerged in shallow pond. This paper presents the analysis results of the impact of design parameters on the length of SWHE and its application effect on geothermal heat pump(GHP) system using vertical GHE. In order to analysis, We applied ${\epsilon}-NTU$ method on designing the length of SWHE. Analysis results show that the required pipe length of SWHE was decreased with the increase of approach temperature difference and with the decrease of pipe wall thickness. In addition, when the SWHE was applied to the GHP system, the temperature of vertical GHE was more stable than that of standalone GHE system.

Finite Element Analysis of Partially Saturated Soil Considering Pore-air Pressure (간극공기압을 고려하는 불포화토의 유한요소해석)

  • Kim, Jae-Hong;Hwang, Young-Cheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.3
    • /
    • pp.95-102
    • /
    • 2011
  • A model of solid-water-air coupling in triphasic mixture is compared to that of solid-water coupling in biphasic mixture with an application to partially saturated soils. Based on thermodynamics, the mathematical framework governing the behavior of a partially saturated soil is derived by using balance equations, and numerical implementation through drainage experiment of a sand column is carried out to validate the obtained formulations. The role of the air phase in the hydro-mechanical behavior of triphasic mixture can be analyzed from the interaction among phases and from the solid skeleton's constitutive behavior, and the three-phase model found applications in geotechnical engineering problems, such as $CO_2$ sequestration and air storage in an aquifer.

Flow Characteristics for the Variation of Radius of Curvature in Open Channel Bends (만곡수로에서의 곡률반경 변화에 따른 흐름특성)

  • 윤세의;이종태
    • Water for future
    • /
    • v.23 no.4
    • /
    • pp.435-444
    • /
    • 1990
  • The flow characteristics varying with the rate of the radius of curvature to width (Rc/B) in open channel bends are investigated with a simplified numerical model, briefly. Secondary flow velocity and transverse bed slope are formulated from the equations of moment of momentum and force balance analysis, respectively. The conservation equations of mass and streamwise momentum are simplified by depth integration and its solution could be obtained form explicit finite difference method. Three sets of computer simulation are executed. The rates of Rc/B adopted in simulations are 2.7, 5.4, 8.1 , respectively. The terms analyzed in this paper are secondary flow velocity, streamwise velocity, the path of maximum streamwise velocity, deviation angle, and mass-shift velocity.

  • PDF

A Study on the Development of Optimal Renewal Planning Model in Water Supply Facilities Connected to Future Financial Plan of Water Providers (수도사업자의 장래 재정계획과 연계한 상수도시설의 최적 개량계획 수립 모델 개발 연구)

  • Lim, Sanghyun;Shin, Hwisu;Seo, Jeewon;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.2
    • /
    • pp.149-159
    • /
    • 2017
  • It is considered necessary to renewal a considerable number of water supply facilities in Korea because they began to be intensively buried in the period of rapid economic growth. Accordingly, local water providers are required to take measures against this situation, but they have currently been caught in a vicious circle of the lack of budget spent in renewing water supply facilities because county-based small-scale local water supply cannot afford to cover annual expenditures with their revenues from water rates. Therefore, this study developed an optimal renewal planning model capable of achieving a balance of financial revenue and expenditure in local water supply using nonlinear programming and furthermore of minimizing the total cost incurred during the analysis. To this end, this study selected the water supply area located in County Y as a research area to build the financial revenue and expenditure and used Solver function provided by Microsoft Excel to use nonlinear programming. As a result, this study developed an optimal renewal planning model minimizing incurred costs in consideration of 6 items in the financial revenue and expenditure. The optimal renewal plan was modeled according to the available annual budget. As a result, this study proposed SICD, a scenario to minimize total costs from the perspective of water suppliers, and SITS, a scenario to minimize the increase in water rates from the perspective of consumers. It can be said that the method proposed in this study is the core of the optimal financial and renewal plans as a final stage of asset management for water supply facilities. Therefore, it is considered possible for local water providers to use the method proposed in this study according to circumstances for the asset management of water supply facilities.

A Study on Water Demand Forecasting Methods Applicable to Developing Country (개발도상국에 적용 가능한 물수요 예측 방법 연구)

  • Sung-Uk Kim;Kye-Won Jun;Wan-Seop Pi;Jong-Ho Choi
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.4
    • /
    • pp.75-84
    • /
    • 2023
  • Many developing countries face challenges in estimating long-term discharge due to the lack of hydrological data for water supply planning, making it difficult to establish a rational water supply plan for decision-making on water distribution. The study area, the Bandung region in Indonesia, is experiencing rapid urbanization and population concentration, leading to a severe shortage of freshwater. The absence of water reservoir prediction methods has resulted in a water supply rate of approximately 20%. In this study, we aimed to propose an approach for predicting water reservoirs in developing countries by analyzing water safety and potential water supply using the MODSIM (Modified SIMYLD) network model. To assess the suitability of the MODSIM model, we applied the unit hydrograph method to calculate long-term discharge based on 19 years of discharge data (2002-2020) from the Pataruman observation station. The analysis confirmed alignment with the existing monthly optimal operation curve. The analysis of power plant capacity revealed a difference of approximately 0.30% to 0.50%, and the water intake safety at the Pataruman point showed 1.64% for Q95% flow and 0.47% for Q355 flow higher. Operational efficiency, compared to the existing reservoir optimal operation curve, was measured at around 1%, confirming the potential of using the MODSIM network model for water supply evaluation and the need for water supply facilities.

Development of Rainfall - Delayed Response Model for the Calculation of Baseflow Proportion (기저유출량추정을 위한 강우 지연반응모형 개발)

  • 홍종운;최예환
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.30 no.2
    • /
    • pp.31-43
    • /
    • 1988
  • The Purpose of this study is to develop the rainfall-delayed response model (RDR Model) which influences the baseflow proportion of rivers as a result of the antecedent precipitation of the previous several months. The assesment of accurate baseflows in the rivers is one of the most important elements for the planning of seasonal water supply for agriculture, water resources development, hydrological studies for the availability of water and design criteria for various irrigation facilities. The Palukan river gauging site which is located in the Pulukan catchment on Bali Island, Indonesia was selected to develop this model. The basic data which has been used comprises the available historic flow records at 19 hydrologic gauging stations and 77 rainfall stations on Bali Island in the study. The methology adopted for the derivation of the RDR model was the water balance equation which is commonly used for any natural catcbment ie.P=R+(catchment losses) -R+(ET+DP+DSM+DGW). The catchment losses consist of evapotranspiration, deep percolation. change in soil moisture, and change in groundwater storage. The catchment areal rainfall has been generated by applying the combination method of Thiessen polygon and Isohyetal lines in the studies. The results obtained from the studies may be summarized as follows ; 1. The rainfall-runoff relationship derived from the water balance equation is as shown below, assuming a relationship of the form Y=AX+B. Finally these two equations for the annual runoff were derived ; ARO$_1$=0.855 ARF-821, ARF>=l,400mm ARO$_2$=0.290ARF- 33, ARF<1,400mm 2. It was found that the correction of observed precipitation by a combination of Thiessen polygons and Isohyetal lines gave good correlation. 3. Analysis of historic flow data and rainfall, shows that surface runoff and base flow are 52 % and 48% (equivalent to 59.4 mm) of the annual runoff, respectively. 4. Among the eight trial RDR models run, Model C provided the correlation with historic flow data. The number of months over which baseflow is distributed and the relative proportions of rainfall contributing in each month, were estimated by performing several trial runs using data for the Pulukan catchment These resulted in a value for N of 4 months with contributing proportions of 0.45, 0.50, 0.03 and 0.02. Thus the baseflow in any month is given by : P$_1$(n) =0.45 P(n) +0.50 P(n-I ) +0.03 P(n-$_2$) +0.02 P(n-$_3$) 5. The RDR model test gave estimated flows within +3.4 % and -1.0 % of the observed flows. 6. In the case of 3 consecutive no rain months, it was verified that 2.8 % of the dependable annual flow will be carried over the following year and 5.8 % of the potential annual baseflow will be transfered to the next year as a result of the rainfall-delayed response. The results of evaluating the pefformance of the RDR Model was generally satisfactory.

  • PDF

Analysis of the Hydraulic Behaviour in the Nearshore Zone by a Numerical Model (수치모형에 의한 연안해역 해수운동의 분석)

  • Lee, Hee-Young;Jeoung, Sun-Kil
    • Water for future
    • /
    • v.27 no.2
    • /
    • pp.73-83
    • /
    • 1994
  • The unproper development of the nearshore zone can enhance the diffusion of pollutant in the nearshore zone resulting in unbalanced sediment budget of beach which causes alteration of beach topography. Therefore, it is required to predict the effects of the envirnmental change quantitatively. In this paper, the depth-averaged and time-averaged energy balance equation is selected to acount for the wave transformation such as refraction, shoaling effect, the surf zone energy disipation, wave breaking index and bore, due to wave breaking in the shore region.(Numerical solutions are obtained by a finite difference method, ADI and Upwind. For the calculation of the wave-induced current, the unsteady nonlinear depth-averaged and time-averaged governing equation is derived based on the continuity and momentum equation for imcompressible fluid.) Numerical solutions are obtained by finite difference method considering influences of factors such as lateral mixing coefficient, bed shear stress, wave direction angle, wave steepness, wave period and bottom slope. The model is applied to the computation of wave transformation, wave-induced current and variation of mean water leel on a uniformly sloping beach.

  • PDF

LIDMOD3 Development for Design and Evaluation of Low Impact Development (저영향개발기법 설계 및 평가를 위한 LIDMOD3 개발)

  • Jeon, Ji-Hong;Seo, Seong-Cheol
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.4
    • /
    • pp.382-390
    • /
    • 2018
  • In this study, the LIDMOD3 was developed to design and evaluate low impact development (LIDMOD). In the same fashion, the LIDMOD3 employs a curve number (NRCS-CN) method to estimate the surface runoff, infiltration and event mean concentration as applicable to pollutant loads which are based on a daily time step. In these terms, the LIDMOD3 can consider a hydrologic soil group for each land use type LID-BMP, and the applied removal efficiency of the surface runoff and pollutant loads by virtue of the stored capacity, which was calculated by analyzing the recorded water balance. As a result of Model development, the LIDMOD3 is based on an Excel spread sheet and consists of 8 sheets of information data, including: General information, Annual precipitation, Land use, Drainage area, LID-BMPs, Cals-cap, Parameters, and the Results. In addition, the LIDMOD3 can estimate the annual hydrology and annual pollutant loads including surface runoff and infiltration, the LID efficiency of the estimated surface runoff for a design rainfall event, and an analysis of the peak flow and time to peak using a unit hydrolograph for pre-development, post-development without LID, and as calculated with LID. As a result of the model application as applied to an apartment, the LIDMOD3 can estimate LID-BMPs considering a well spatical distributed hydroloic soil group as realized on land use and with the LID-BMPs. Essentially, the LIDMOD3 is a screen level and simple model which is easy to use because it is an Excel based model, as are most parameters in the database. This system can be expected to be widely used at the LID site to collect data within various programmable model parameters for the processing of a detail LID model simulation.

A Development of Method for Surface and Subsurface Runoff Analysis in Urban Composite Watershed (I) - Theory and Development of Module - (대도시 복합유역의 지표 및 지표하 유출해석기법 개발 (I)- 이론 및 모듈의 개발 -)

  • Kwak, Chang-Jae;Lee, Jae-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.1
    • /
    • pp.39-52
    • /
    • 2012
  • Surface-subsurface interactions are an intrinsic component of the hydrologic response within a watershed. In general, these interactions are considered to be one of the most difficult areas of the discipline, particularly for the modeler who intends simulate the dynamic relations between these two major domains of the hydrological cycle. In essence, one major complexity is the spatial and temporal variations in the dynamically interacting system behavior. The proper simulation of these variations requires the need for providing an appropriate coupling mechanism between the surface and subsurface components of the system. In this study, an approach for modelling surface-subsurface flow and transport in a fully intergrated way is presented. The model uses the 2-dimensional diffusion wave equation for sheet surface water flow, and the Boussinesq equation with the Darcy's law and Dupuit-Forchheimer's assumption for variably saturated subsurface water flow. The coupled system of equations governing surface and subsurface flows is discretized using the finite volume method with central differencing in space and the Crank-Nicolson method in time. The interactions between surface and subsurface flows are considered mass balance based on the continuity conditions of pressure head and exchange flux. The major module consists of four sub-module (SUBFA, SFA, IA and NS module) is developed.