• Title/Summary/Keyword: Wastewater discharger cost

Search Result 1, Processing Time 0.015 seconds

Research on status and characteristics of wastewater discharger cost in Local Government (국내 기초자치단체 하수도 원인자부담금 현황 및 특성 분석 연구)

  • Jiyeol Im;Dong Hyun Lee;Kyungik Gil
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.230-236
    • /
    • 2023
  • The sewage system was continuously distributed as a concept of public service and protection for water system such as wet-land, resulting in deterioration of the management of sewage management institutions. Accordingly, under the leadership of the central government, various sewage policies are being promoted to streamline the management of sewage management institutions. The main points were related to costs, and typical characteristics include wastewater cost and wastewater discharger cost. In this research, the current status and characteristics of the wastewater discharger cost of 71 local governments in Korea were analyzed. As a result, 41 places (57%) were found to be less than 1,000,000 won/m3 to 2,000,000 won/m3, with an average was 1,990,653 won/m3 (median was 1,918,000 won/m3). In addition, the rate of wastewater discharger cost was increased when the wastewater discharger cost was higher stage. The influential parameters of local governments, which were relatively correlated with the wastewater discharger cost, were analyzed as the rate of recovering wastewater cost and financial independence rate. The results of this research could be used as basic data for wastewater discharger cost, and future researches are needed on how to calculate the appropriate level of wastewater discharger cost.