Study on the Heat Recovery Design Methods for the Flue Gas from Combustion and Incineration Processes (연소 또는 소각 과정에서 발생하는 배기가스의 폐열 회수 설계 방법에 관한 연구)

  • Lee, Chan;Jung, Bong-Jin
    • Clean Technology
    • /
    • v.5 no.2
    • /
    • pp.53-61
    • /
    • 1999
  • Presented is the design method of the waste heat recovery facility for the flue gas produced from combustion and incineration processes of large industrial environmental waste treatment and cogeneration plants. The present study assumes the basic design concept of wast heat recovery facility as the combination of waste heat recovery boiler and steam power cycle, and then describes the modeling technique, the design concept and criteria of each component of waste heat recovery facility. In addition, the present study investigates how the thermal performance of waste heat recovery facility varies with boiler operating pressure and waste heat recovery heat exchanger design at the same flue gas condition.

  • PDF

Turbine Design for Turbo-compound System to Recover Exhaust Gas Energy Using 1-D Mean Line Flow Model (1-D Mean Line Flow Model을 이용한 엔진 배기에너지 회수를 위한 터보컴파운드 시스템용 터빈 설계)

  • Jang, Jinyoung;Yun, Jeong-Eui
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.24 no.1
    • /
    • pp.74-81
    • /
    • 2016
  • The aim of this study was to find the initial design value of turbine blade for electrical type turbocompound system generating 10 kW. Turbocompound is one of the waste heat recovery system applying to internal combustion engine to recover exhaust gas energy that was about 30 % of total input energy. To design the turbine blade, 1-D mean line flow model was used. Exhaust gas temperature, pressure, flow rate and turbine rotating speed was fixed as primary boundary conditions. The velocity triangles was defined and used to determine the rotor inlet radius and width, the rotor outlet radius at shroud and radius at hub, the rotor flow angles and the number of blades.

The Study on the Energy self-sufficiency and Economic Analysis of KIER Zero Energy Solar House (제로에너지 솔라하우스(KIER ZeSH)의 에너지 자립도 및 경제성 분석)

  • Jeong, Seonyeong;Baek, Namchoon;Yoo, Changkyoon;Yoon, Eungsang;Yoon, Jongho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.64.1-64.1
    • /
    • 2010
  • In this study, the energy and economic analysis of KIER Zero Energy Solar House (KIER ZeSH) was carried out. KIER ZeSH was designed and constructed in the end of 2009 for the purpose of more than 70% energy self-sufficiency in total load as well as less than 20% of additional construction cost. The several building energy conservation technologies like as super insulation, high performance window, wast heat recovery system, etc and renewable energy system. The renewable heating and cooling system is a kind of solar thermal system combined with geo-source heat pump as a back-up device. The capacity of 3.15kW solar BIPV system was also installed on the roof. The measurement by monitering system of ZeSH was conducted for one year from November 2009 to October 2010. The energy self-sufficiency and economic analysis were conducted based on the this monitering result. As a result, the energy self sufficiency is about 83% which is higher than that of the target and the payback period is 11 years.

  • PDF

A Study on the Energy Self-Sufficiency of KIER Zero Energy Solar House II (제로에너지 솔라하우스(KIER ZESH-II)의 에너지 자립도에 대한 연구)

  • Jeong, Seonyeong;Baek, Namchoon;Yoo, Changkyoon;Yoon, Jongho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.199.1-199.1
    • /
    • 2010
  • The purpose of this study is on the thermal performance evaluation of KIER Zero Energy Solar House-II, called ZeSH-II which can be sustained with the support of a very few energy. This ZeSH-II was designed and constructed in the end of 2009 to develop for the goal of 70% self-sufficiency. Several key technologies like as the super insulation, high performance window, wast heat recovery system as well as solar power and thermal system and geo-source heat pump wear used for this ZeSH-II. The monitering of ZeSH-II was conducted for six months from November 2009 to April 2010. The monthly energy consumption was calculated based on the monitering results. As a result, the ZeSH-II shows that the energy self-sufficiency during six months(from oct. to apr.) is about 80% which is higher than that of the target.

  • PDF

Performance Evaluation of the Gas Turbine of Integrated Gasification Combined Cycle Considering Off-design Operation Effect (탈설계점 효과를 고려한 석탄가스화 복합발전용 가스터빈의 성능평가)

  • Lee, Chan;Kim, Yong Chul;Lee, Jin Wook;Kim, Hyung Taek
    • 유체기계공업학회:학술대회논문집
    • /
    • 1998.12a
    • /
    • pp.209-214
    • /
    • 1998
  • A thermodynamic simulation method is developed for the process design and the performance evaluation of the gas turbine in IGCC power plant. The present study adopts four clean coal gases derived from four different coal gasification and gas clean-up processes as IGCC gas turbine fuel, and considers the integration design condition of the gas turbine with ASU(Air Separation Unit). In addition, the present simulation method includes compressor performance map and expander choking models for considering the off-design effects due to coal gas firing and ASU integration. The present prediction results show that the efficiency and the net power of the IGCC gas turbines are seperior to those of the natural gas fired one but they are decreased with the air extraction from gas turbine to ASU. The operation point of the IGCC gas turbine compressor is shifted to the higher pressure ratio condition far from the design point by reducing the air extraction ratio. The exhaust gas of the IGCC gas turbine has more abundant wast heat for the heat recovery steam generator than that of the natural gas fired gas turbine.