• Title/Summary/Keyword: WMO guideline

Search Result 3, Processing Time 0.018 seconds

Assessment of Observation Environments of Automated Synoptic Observing Systems Using GIS and WMO Meteorological Observation Guidelines (GIS와 WMO 기상 관측 환경 기준을 이용한 종관기상관측소 관측환경평가)

  • Kang, Jung-Eun;Kim, Jae-Jin
    • Korean Journal of Remote Sensing
    • /
    • v.36 no.5_1
    • /
    • pp.693-706
    • /
    • 2020
  • For ten meteorological observatories running an automated synoptic observing system (ASOS), we classified the observation environments into five classes based on the World Meteorological Organization (WMO) classification guidelines. Obstacles (such as topography and buildings) and land-cover types were the main factors in evaluating the observation environments for the sunshine duration, air-temperature, and surface wind. We used the digital maps of topography, buildings, and land-cover types. The observation environment of the sunshine duration was most affected by the surrounding buildings when the solar altitude angle was low around the sunrise and sunset. The air-temperature observation environment was determined based on not only the solar altitude angle but the distance between the heat/water source and ASOS. There was no water source around the ASOSs considered in this study. Heat sources located near some ASOSs were not large enough to affect the observation environment. We evaluated the surface wind observation environment based on the roughness length around the ASOS and the distance between surrounding buildings and the ASOS. Most ASOSs lay at a higher altitude than the surroundings and the roughness lengths around the ASOSs were small enough to satisfy the condition for the best level.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

The Characteristics of Probable Maximum Flood on Wi Stream Watersheds (위천유역(渭川流域)의 가능최대홍수량(可能最大洪水量) 특성(特性))

  • Choi, Kyung-Sook;Suh, Seung-Duk
    • Current Research on Agriculture and Life Sciences
    • /
    • v.16
    • /
    • pp.37-44
    • /
    • 1998
  • The estimation of PMP (Probable Maximum Precipitation) and the analysis of characteristics of PMF (Probable Maximum Flood) according to the types of time distribution of rainfall and variations of base flow for the determination of design flood of major hydraulic structures in the watershed area of Wi stream were analysed. The PMP was estimated by the hydro-meteorological method suggested by the guideline of the World Meteorological Organization(WMO). The Blocking method was cited to transpose from PMP to PMS (Probable Maximum Storm) with time distribution. The unit hydrograph, applied for the estimation of PMF was derived by Clark's method. The summaryzed results : (1) The 72 hrs duration PMP in the area is 477.3mm which is 80mm less than the PMP map in Korea and 134 mm lager than the maximum precipitation of 342.9mm in Taegu, near the Wi stream watershed. (2) According to the types of time distribution and variations of base flow, the ranges of PMF for advanced type, central type and delayed type are 3,145.3~3,348.3cms, 3,774.6~3,977.7cms and 3,814.6~4,017.3cms, respectively. Those mean that peak discharge of advanced type is 600cms less than the central type and delayed type. (3) Delayed type among three types by Blocking method has been estimated the largest PMF of 4,017.3cms, and the advanced type has been estimated the smallest PMF of 3,145.3cms. The mean value of the peak PMF of 3,653.6cms may probably be resonable PMF in the Wi stream watershed. The mean PMF could probably be 1.7 times lager than the result of Gajiyama's equation. It is equivalent to the flood of return period 1,000 to 10,000 yrs.

  • PDF