• Title/Summary/Keyword: WBS(Work Breakdown Structure)

Search Result 96, Processing Time 0.032 seconds

A Study on Standard Monitoring Process in Development of High Speed Railway Vehicle (고속철도차량기술개발 표준 모니터링 절차에 대한 고찰)

  • Park, Min-Heung;Kim, Beom-Jin;Kim, Chul-Su;Choi, Deuck-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.528-535
    • /
    • 2011
  • According to railway safety regulations for securing the railway vehicle's quality and performance, it can be partly exempted that the performance tests and production inspections on the railway vehicles which are produced and assembled for the purpose of test and research. The reasons of this exemption are for ensuring maximum autonomy and for saving time considered the development period of railway vehicle. However, it was continuously demanded the necessity of supplementation on the confirmation about railway vehicle's quality & performance. Therefore, we added "The monitoring step" which is for securing the quality and performance in high speed railway vehicle's subsystem & compartment to supplement those tests & inspections in development. In this paper, based on a standard ABS(Activity Breakdown Structure) of railway vehicle and a WBS(Work Breakdown Structure) of the railway vehicle system, we investigate the necessity of monitoring in the High speed railway vehicle development. And by comparing and analyzing the essential requirements of international standard, IRIS(International Railway Industry Standard) & TSI(Technical Specification for Interoperability), we try to examine a standard monitoring procedure.

  • PDF

3-D Information Model for High-speed Railway Infrastructures (고속철도시설물을 위한 3차원정보모델)

  • Shim, Chang-Su;Kim, Deok-Won;Youn, Nu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.241-246
    • /
    • 2008
  • Design of a high-speed railway line requires collaboration of heterogeneous application systems and of engineers with different background. Object-based 3D models with metadata can be a shared information model for the effective collaborative design. In this paper, railway infrastructure information model is proposed to enable integrated and inter-operable works throughout the life-cycle of the railway infrastructures, from planning to maintenance. In order to develop the model, object-based 3-D models were built for a 10km railway among Korea high-speed railway lines. The model has basically three information layers for designers, contractors and an owner, respectively. Prestressed concrete box-girders are the most common superstructure of bridges. The design information layer has metadata on requirements, design codes, geometry, analysis and so on. The construction layer has data on drawings, real data for material and products, schedules and so on. The maintenance layer for the owner has the final geometry, material data, products and their suppliers and so on. These information has its own data architecture which is derived from similar concept of product breakdown structure(PBS) and work breakdown structure(WBS). The constructed RIIM for the infrastructures of the high-speed railway was successfully applied to various areas such as design check, structural analysis, automated estimation, construction simulation, virtual viewing, and digital mock-up. The integrated information model can realize virtual construction system for railway lines and dramatically increase the productivity of the whole engineering process.

  • PDF

A System Design of the MIRINAE II, Air-Launching Rocket for Nanosat (극소형 위성발사를 위한 공중발사 로켓 미리내II의 시스템 설계)

  • Lee, Y.J.;Kim, J.H.;Choi, Y.C.;Lee, J.W.;Byun, Y.H.;Lee, C.
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.33 no.12
    • /
    • pp.83-91
    • /
    • 2005
  • Air-Launching is an effective method that can launch the 'Nanosat' with low launching cost. In this study, system and subsystem design of the air launching rocket for nanosats which perform a simple mission, have been performed. For this purpose, the WBS of the MIRINAEⅡ, and the subsystem schematics have been defined first. Based on these results, detailed configuration and DMU have been developed.

Air-Launching Rocket System Design for Nanosat using DMU (DMU를 이용한 극소형 위성 공중발사 로켓 시스템 설계)

  • Lee Y.J.;Kim J.H.;Choi Y.C.;Lee J.W.;Byun Y.H.;Lee S.T.
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.293-298
    • /
    • 2005
  • Air-Launching is an effective method that can launch the 'Nanosat' with low launching cost. In this study, system and subsystem design of the air launching rocket for nanosats which perform a simple mission, have been performed. Foe this purpose, the WBS of the Air-launching Rocket System, and the subsystem schematics have been defined first. Based on these results, detailed configuration and DMU have been developed.

  • PDF

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.

Analysis and survey of design decision making process in steel production process

  • Furukawa, Satoru;Yoshida, Tomohiro;Chi, Naiyuan;Okamoto, Hiroyuki;Furusaka, Shuzo
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.30-37
    • /
    • 2020
  • In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.

  • PDF

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project (건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kwak, Joong-Min
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.

A study on the development of the nuclear R&D performance monitoring system (원자력연구개발 목표관리시스템 개발)

  • 박준원;최현호;원병출
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.217-220
    • /
    • 1996
  • This study presents a R&D performance monitoring system (RDMS) that is applicable for managing nuclear program in KAERI. The prime goal of RDMS is to furnish project manager with reliable and accurate information on status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. In this study, the work breakdown structure (WBS) as the governing factor for integration of scope, schedule, resource data was derived, and the above parameters were loaded personal computer. A RDMS is comprised of about 12,000 R&D activities of the 16 goverment-led projects. The Primavera software was used to monitor the progress, evaluate the performance and analyze the resource distribution to activities.

  • PDF