Sewage separation which often involves installing a new pipe to separate wastewater flow from stormwater runoff flow can be costly and depends highly on its feasibility in a site. To be able to develop a potentially more economical alternative that can also lessen major road traffic disturbance during this process, a different approach where a smaller sewage separator pipe is installed inside an existing combined sewer pipe was investigated. A small-scale of a box sewer and the proposed sewage separator pipe was constructed in the laboratory to observe and compare the deposition of solids and other solid-associated major pollutants at different flow rates. In addition, three-dimensional flow simulations considering five different scenarios were conducted using Ansys Fluent to observe the effect of the proposed sewage separator pipe to the hydraulic flow if installed inside the combined sewer pipe. Results revealed that the deposition of TSS, TCOD, TN, and TP were reduced by at least 60% when the wastewater was conveyed by the sewage separator pipe instead of the combined sewer pipe. Moreover, the flow simulations conducted showed that there was little to no major disturbance in hydraulic flow and velocity distribution when the sewage separator was installed inside a straight pipe and even at pipe transitions such as intersections, turns, and drop in elevation. Considering the pipe dimensions and the results of the study, the proposed approach can be promising in terms of reduction in pollutant deposition without a major effect on the hydraulic flow. Further investigation and cost-analysis should be done in the future to support these preliminary findings and help alleviate the problems caused by combined sewer overflows by introducing an alternative approach.
This study analyzed the changes in the concentrations of the pollutants of constructed treatment wetlands which come from the discharge water of a sewage treatment plant. According to the results of budgets in constructed wetlands, the net production of the organic carbon, nitrogen and phosphorus were 368 kgC/month, 306 kgN/month and -49 kgP/month, respectively. The high particle form of pollutants are mostly removed due to settlement and absorption when passing through wetlands, but because a low processing efficiency for pollutants was shown when sewage treatment plant wastewater flows in, there is a need for a water management system that can reduce the organic matter load through monitoring. The low removal efficiency of constructed wetlands were caused by both structural and operational problems. Therefore, to enable to play a role as a reduction facility of pollutants, an appropriate design and operation manuals for constructed wetlands is urgently needed.
Journal of the Korean Society for Precision Engineering
/
v.20
no.9
/
pp.118-125
/
2003
In this study, we carried out the finite element analysis for the screw of centrifuge that is the weakest part of the centrifuge for sewage management. Centrifugal force caused by rotation with velocity of 4000rpm was applied at the screw. Structural analysis was done with respect to the change of the ratio of blade pitch($R_P$), shaft diameter($R_D$) and extended hole($R_E$). When the area of circular hole is equal to that of extended holes, maximum equivalent stresses in the screw with circular and extended circular hole were compared. And then natural frequency analysis was executed for the same model. Three mode shapes were used to explain the vibration characteristics of each screw. Convergence study was accomplished fur more accurate results.
Behavior and decomposition velocity of pollutants on various forms from domestic sewage in sewage treatment plant were investigated in order to obtain the basic data for improving the removal efficiency of pollutants and to reduce the area in constructed wetland by natural purification method. The removal amounts of BODs and CODs in aerobic bed were significantly higher than those of the other beds. In aerobic bed, the removal amounts of IBOD and ICOD were more than those for SBOD and SCOD, respectively, whereas the removal amounts of BODs and CODs in anoxic and anaerobic beds were little different. The removal amounts of SSs in aerobic bed were also higher than those for the other beds, and the removal amounts of VSS in all beds were more than those for FSS. The removal amounts of DTN and DTP in all beds were more than those for STN and STP, respectively. In addition, the decomposition velocities of TBOD, TCOD and TSS in aerobic bed were 30.79, 17.15 and 29.96 $day^{-1}$. Moreover, the decomposition velocities of BODs, CODs and SSs in aerobic bed were very rapid than those in the other beds. On the other hand, the decomposition velocities of BODs, CODs and SSs in anoxic and anaerobic beds were a little different regardless of the forms of pollutant. The decomposition velocities constants of T-N in aerobic, anoxic and anaerobic beds were 4.78, 0.12 and 0.10 $day^{-1}$, respectively. Moreover, the decomposition velocities constants of T-P in aerobic, anoxic and anaerobic beds were 13.09, 0.12 and 0.13 $day^{-1}$ respectively. The decomposition velocity of T-Ns and T-Ps in aerobic bed were slightly rapid than those in the other beds, whereas the decomposition velocities of T-Ns and T-Ps in anoxic and anaerobic beds were slightly different regardless of the forms of pollutant.
Recently the method using fixing biological contactor in treatment of sewage and wastewater has been propelling on the ground that it has advantages of reducing both motive and man power and applied treatment plants of this method are increasing gradually in Korea. After analysing the results from which real structure pilot plant had operated in the field with RBC sewage wastewater system-one of the fixing biological contact methods-for five months, this study was performed to investigate how to apply the standard of establishment that provided in article of sewage disposal facilities notified (act 8 of art 84) by the office of environment on May 16, 1984, to real treatment plant. The rotating velocity and the staying time of rotating disc have interrelation on removal efficiency of BOD. When circumferential velocity of rotating disc was ranged from 18 to 20 m per minute, economical price was the best. When the staying time was even about 120 minutes for that of home RBC facilities showed 90% or above of BOD removal efficiency of high concentration sewage also showed excellent efficiency ranged from about 85% to 90%.
Journal of the Korea Organic Resources Recycling Association
/
v.14
no.1
/
pp.151-159
/
2006
In these days, the importance of sludge treatment is emerging due to the London Convention, so this study was conducted to propose the alternatives for the improved sludge treatment on the organic wastewater and sewage sludge with JAR test and settling column equipped with stirrer. The minimum coagulant dosage to earn the optimum sludge settling efficiency resulted from 200mg/l and each critical sludge settling interface showed no distinct difference when PAC was dosed over 200mg/l. Accordingly, Clarification Rate(CR) with 200mg/l dosage was calculated to CR=(Ho-Ht) / Ho=1-0.4=0.6 because the critical sludge settling height stopped at 0.4. The settling velocity of sludge interface was decreased with the increase of MLSS concentration but rather increased with MLSS concentration over 1,000mg/l. This resulted from positive effect of interacted coagulation for floc formation by transfer to the zone of compressed settling when MLSS concentration increased over 1,000mg/l. The settling velocity of sludge interface showed $28.66{\times}10^{-3}/min$ for average settling velocity of sewage sludge which is 6.7 times higher than $4.25{\times}10^{-3}/min$ for average settling velocity of organic wastewater sludge. The increasing rate of CR for organic wastewater activated sludge was higher than that of settling velocity under 200mg/l of PAC dosage but settling velocity was higher than CR over 200mg/l of PAC dosage. However, in case of sewage sludge, the differential rate of CR was low when PAC dosage was increased but the settling velocity was suddenly increased with over 200mg/l dosage. Therefore coagulation effect was more efficient to MLSS settling velocity rather than SS removal effect in the supernatant.
The study has analyzed impacts and intensity of weather that affect $PM_{10}$ concentration based on PM10 forecast conducted by the city of Seoul in order to identify ways to improve the accuracy of PM10 forecast. Variables that influence $PM_{10}$ concentration include not only velocity and direction of the wind and rainfalls, but also those including secondary particulate matter, which were identified to greatly influence the concentration in complicated manner as well. In addition, same variables were found to have different impacts depending on seasons and conditions of other variables. The study found out that improving accuracy of $PM_{10}$ concentration forecast face some limits as it is greatly influenced by the weather. As an estimation, this study assumed that basic research units and artificially estimated pollutant emissions, study on mechanisms of secondary particulate matter productions, observatory compliment, and enhanced forecaster's expertise are needed for better forecast.
Journal of the Korea institute for structural maintenance and inspection
/
v.21
no.6
/
pp.126-131
/
2017
Numerical analysis using commercial CFD code was carried out to develop the drag force type vertical axis hydraulic turbine for the improvement of the production efficiency of small hydro energy at low flow velocity condition. Blade pressure changes and internal flows were analyzed according to the presence or absence of the hydraulic turbine blade holes at flow velocity of less than 1.0~3.0 m/s. According to the numerical results, the pressure and flow velocity is severly affected by the flow velocity in turbine blade with no holes, while the influence of flow velocity is comparatively decreased in turbine blade with holes. It is also found that the pressure and flow velocity on the blade surface with holes are evenly distributed with no singular location and it is believed that forming a hole in the blade may be helpful in terms of structural safety.
Magazine of the Korean Society of Agricultural Engineers
/
v.28
no.3
/
pp.99-106
/
1986
This study was carried out to investigate the effects of moisture content, temperature, C/N ratio and pH of the sewage sludge mixed with hulle and sawdusts for making compost under aerobic condition and to improve the defect of the structure of experimental equipment heat lose and handling method. and obtained results were as follows 1.The temperature was reached 73$^{\circ}$ C around 50 hours fermentation in the condition of 0.8 L/min. of air and 60.4% of moisture content. and favorable moisture content of initial condition ranged from 50 to 65% 2.The temperature near bottom of the batch composter was decreased due to evaporate water vapor and lose the heat produced during aeration. and it is required to be improved. 3.The temperature in the batch composter from the center to the inside wall surface was gradually decreased. the temperatures of the points located in r=9cm and the wall surface were 4$^{\circ}$ C and 6$^{\circ}$ C respectively. and therefore it is required to be insulated. 4. The maximum C02 production was obtained as 7.3% per volume in the temperature of 63$^{\circ}$C at the moisture content of 60% 5.The temperature range of active microbes growth was found to be as 20$^{\circ}$C to 40$^{\circ}$C in the case of mesophiles and 50$^{\circ}$C to 65$^{\circ}$C in the case of thermophiles due to increase and decrease C02 production. 6.C/N ratio after decomposition was 1.3 to 2.6 smaller than that of initial one due to increase the amount of nitrogen. The more C/N ratio increased. the less the reaction velocity decresed. The optimum of it as found to be 30. 7.pH values after decomposition were slightly increased than that of initial ones. The reaction velocity was decreased at acid and alkall condition. Therefore it is neseseary to neutralize the medium to improve the reaction.
One of the major problems associated with operation of domestic sewer lines involves hydraulic problems such as insufficient conveyance capacity, exceeding maximum velocity, and deficiency of minimum velocity. It has also been pointed out that influent concentration lower than design concentration of pollutants, which is mainly caused by unidentified inflow and infiltration, degrades the operational efficiency of many sewage treatment plants (STPs). A computer-added analysis method supporting a coupled simulation of sewage quality and quantity is essentially required to evaluate the status of existing STPs and to improve their efficiency by a proper sewer rehabilitation work. In this study, dynamic water quality simulations were conducted using MOUSE TRAP to investigate the principal parameters that governs the changes of BOD, ${NH_4}^+$, and ${PO_4}^{3-}$3- concentrations within the sewer networks based on data acquired through on-site and laboratory measurements. The BOD, ${NH_4}^+$ and ${PO_4}^{3-}$3- concentrations estimated by MOUSE TRAP was lower than theoretical pollution loads because of sedimentation and decomposition in the sewer. The results revealed that sedimentation is a most important factor than other biological reactions in decreasing pollutant load in the sewers of C-city. The sensitivity analysis of parameters pertaining to water quality changes indicated that the effect of the BOD decay rate, the initial DO concentration, the half-saturation coefficient of dissolved BOD, and the initial sediment depth is marginal. However, the influence of settling rate and temperature is relatively high because sedimentation and precipitation, rather than biological degradation, are dominant processes that affect water quality in the study sewer systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.