• Title/Summary/Keyword: VV&A(Verification, Validation, and Accreditation)

Search Result 18, Processing Time 0.03 seconds

M&S VV&A for Aerospace System Development : M&S Life-Cycle Model and Development Paradigm (항공우주 시스템 개발용 M&S의 VV&A: M&S 수명주기 모델 및 개발 패러다임 제안)

  • Kim, Chang-Joo;Lee, Dohyeon;Hur, Sungwook;Park, Sang-Seon;Cho, In-Je
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.6
    • /
    • pp.508-516
    • /
    • 2017
  • The M&S (Model and Simulation) has been increasingly used in the wide area of applications and the official certification or accreditation of the M&S are becoming a mandatory requirement to prevent the risks and mishaps caused by the usage of inadequate M&Ss or by misuses of the M&S. This paper threats the VV&A (Verification, Validation, and Accreditation) for the M&S used in the development of the aerospace systems, where most M&S used in the development are derived from the physical laws and the final validation data are typically obtained through a series of flight tests after the prototype production. Considering these unique features, the paper proposes the M&S life-cycle model and development paradigm suitable for the aerospace-system development and accesses the proposed ones by comparative investigation on the relevant regulations and related literatures.

Verification, Validation, and Accreditation (VV&A) Considering Military and Defense Characteristics

  • Kim, Jung Hoon;Jeong, Seugmin;Oh, Sunkyung;Jang, Young Jae
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.1
    • /
    • pp.88-93
    • /
    • 2015
  • In this paper, we identify the characteristics of modeling and simulation (M&S) for military and defense and propose the method of verification, validation, and accreditation (VV&A) using the identified characteristics. M&S has been widely used for many different applications in military and defense, including training, analysis, and acquisition. Various methods and processes of VV&A have been proposed by researchers and M&S practitioners to guarantee the correctness of M&S. The notion of applying formal credibility assessment in VV&A originated in software engineering reliability testing and the systems engineering development process. However, the VV&A techniques and processes proposed for M&S by the research community have not addressed the characteristics and issues specific to military and defense. We first identify the characteristics and issues of military/defense M&S and then propose techniques and methods for VV&A that are specific for military/defense M&S. Possible approaches for the development of VV&A are also proposed.

A Study on the V&V Process of M&S for the Test and Evaluation (시험평가용 M&S에 대한 V&V 프로세스 연구)

  • Park, Ju-Hye
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.397-404
    • /
    • 2019
  • When developing a weapon system, a T&E(Test and Evaluation) can be performed using M&S for the test items that cannot be evaluated in the real world. In this case, the VV&A activities are required to prove the credibility of M&S for the T&E. Recently, the use of M&S has been increasing as the R&D trends of weapon systems are becoming more advanced. Therefore, the VV&A activities are also increasing. The VV&A activities aim to verify, validate, and accredit that the simulation can represent a real system and ensure credibility regarding its purpose and intention of use. VV&A activities are divided into V&V and Accreditation. When performing VV&A in the ADD (Agency for Defense Development), the V&V activities are performed by a separate department of the ADD and the accreditation activities are performed in the DTAQ (Defense Agency for Technology and Quality). This paper proposes a V&V process for a T&E of M&S that has been performed in ADD. The process is used to verify and validate the documents and data generated during the development process according to the accreditation criteria, and provides objective data that can be used to judge whether the accreditation decision and acceptance criteria are met.

VV & A Application for the Assurance of Defense M & S Credibility (M & S 신용성 향상을 위한 VV & A 적용 모델)

  • Choi, Sang-Yeong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.1 s.24
    • /
    • pp.60-71
    • /
    • 2006
  • With the increased reliance on M & S(Modeling & Simulation) in military training, defense analysis, and system acquisition. The credibility of M & S becomes even more critical issue in the M & S application community. In this paper, we have introduced the VV & A(Verification, Validation and Accreditation) concept of M & S for the assurance of its credibility, and proposed the VV & A model applicable to a military simulator development with the illustrative example of MSAM(Medium range-Surface to Air Missile) system simulator.

The Study of process for VV&A on acquiring the credibility of M&S (M&S 신뢰도 확보를 위한 VV&A 절차 적용에 관한 연구)

  • Choi, Yoo Jin
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.2
    • /
    • pp.11-16
    • /
    • 2009
  • This study introduces the verification, validation & accreditation (VV&A) process for modeling & simulation (M&S). VV&A is standard process for credibility of M&S. In several countries including USA, for weapon system of Defense Development using M&S, VV&A is necessary procedures to acquire official approving for credibility of M&S. Many countries have regular recommend practice guide (RPG) and instructive for VV&A of M&S. In this study, we focus the VV&A key concepts as Department of Defense RPG of USA and give the outline of the main VV&A concepts because we don't have any available VV&A Instructive. Also, this report documents the first significant VV&A application for a MITS(M-SAM Integrate Test System) including Verification and Validation(V&V) activity and tasks.

  • PDF

On Improving the Verification, Validation and Accreditation Process by Including Safety Requirements in M&S-Based Development of Weapon Systems (M&S기반 무기체계개발에서 시스템 안전요건 반영을 통한 VV&A 프로세스 개선에 관한 연구)

  • Sim, Sang Hyun;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.123-131
    • /
    • 2014
  • Modern weapon systems are getting more complex in terms of the functionality and also the conditions on the environment and range in which they are deployed and used. Therefore, many development programs can easily be exposed to a variety of risks, resulting in delayed schedules and cost overrun. As such, effective means are necessary to keep the defence budget at an affordable level while competitive edges on technological aspects are retained. As one way to meet those need, modeling and simulation (M&S) methods have widely been used, particularly in the test and evaluation (T&E) process for weapon systems development. The result of M&S-based systems development should be evaluated by the verification, validation & accreditation (VV&A) process to assure keeping reliability at a desired level. On the other hand, due to the explosiveness, the weapons systems development naturally requires to consider safety issues in both the T&E and operational periods. The purpose of this paper is to improve the VV&A process by reflecting the safety requirements therein. To do so, the VV&A process has been analyzed and graphically modeled first and then safety elements have been incorporated effectively. The use of the improved process in the war ships development has also been discussed. Based on the process proposed and the consequent database constructed, the target system can be expected to benefit from reducing development risks while assuring systems safety.

Study of Acquiring the Credibility for Weapon System M&S with V&V Process (검증 및 확인(V&V) 절차를 통한 무기체계 M&S 신뢰도 확보에 관한 연구)

  • Kim, Seok-Woo;Park, Sanghyuk
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.3
    • /
    • pp.1-8
    • /
    • 2015
  • Verification, Validation & Accreditation (VV&A) process is widely applied in various disciplines as a method of acquiring the credibility for M&S tools. The guideline of VV&A states that the detailed process can be established flexibly according to the needs and the availability of resources. For example, DAPA (Defense Acquisition Program Administration) guideline suggests that the accreditation process in the VV&A can be omitted if necessary. On this study, we first introduce and describe V&V process. Accreditation process is omitted due to limited time and resources. However, the proposed V&V is sufficient for our needs. Finally, we apply the proposed process of V&V to the System-Integrated Simulator of "Raybolt", Medium-Range Infantry Missile System, for the acquisition of the M&S credibility.

M&S Verification, Validation and Accreditation Research Direction Considering the Characteristics of Defense M&S (국방 M&S의 특징 분석과 이를 통한 VV&A 방향)

  • Kim, Junghoon;Jeong, Seungmin;Hwang, Illhoe;Cho, Hyunju;Kim, Daeyoung;Jang, Young Jae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.6
    • /
    • pp.486-497
    • /
    • 2013
  • In this paper, we first present an in-depth survey of the research on Verification, Validation and Accreditation (VV&A) applied in various areas. Then we introduce the characteristics of the military and defense Modeling and Simulation (M&S) and propose the direction of method for VV&A with the identified characteristics. The M&S has been widely used in many different applications in the military and defense area including training, analysis, and acquisition. Methods and processes of VV&A have been proposed by researchers and M&S practitioners to guarantee the correctness of the M&S. The idea of applying the formal credibility assessment in VV&A is originated from the Software Engineering Reliability Test and Systems Engineering Development Process. However, the current VV&A techniques and processes proposed in the research community have not utilized the military-and-defense specific characteristics. We identify the characteristics and issues that can be found in the military and defense M&S. Then propose the direction of techniques and methods for VV&A considering the characteristics and issues. Also, possible research direction on the development of VV&A is proposed.

A SURVEY ON MODEL W&A OF SYSTEM SIMULATION

  • Ying, Wang-Xiao;Ming, Zhang-Qing
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.10a
    • /
    • pp.391-395
    • /
    • 2001
  • Model verification, validation and accreditation (VV&A) of system simulation are detailedly discussed in this paper. The necessity of VV&A is explained by analyzing the factors on which the model and the reality are discrepant. The W&A technology is expounded in detail not only in the conceptual aspect but also in the methodological aspect. Some principles, difficulties and problems that should be paid attention to are discussed concretely and reasonedly. The paper is expected to be instructional and helpful to the VV&A study.

  • PDF

The VV&A Process Design for CMMS in consideration of Korean mission space characteristics (한국형 CMMS 개발 및 관리시스템의 VV&A 프로세스 설계)

  • Kim, Gyo-Seob;Lee, Jung-Man;Bae, Young-Min;Lee, Young-Hoon;Pyun, Jai-Jeong
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.4
    • /
    • pp.189-198
    • /
    • 2010
  • Conceptual Model of the Mission Spaces(CMMS) is a first abstraction model of the military real world and serves as a knowledge(mission spaces) reference models for development, interoperability and reusability of defense modeling and simulation(M&S) systems, by capturing basic information about entities involved in any mission and their key actions and interactions. Therefore, the completeness of CMMS is the key to success for the quality of M&S systems based on it. To improve quality and credibility of CMMS, the Verification, Validation and Accreditation(VV&A) processes of CMMS is very important. This paper briefly describes the K-CMMS(Korean Conceptual Model of Mission Space) and the VV&A process.