• Title/Summary/Keyword: VE Case

Search Result 144, Processing Time 0.026 seconds

Improvement and Systematization of Pre-Study Work for Design Value Engineering in Construction Projects by Quality Function Deployment (품질기능전개(QFD) 기법을 적용한 건설프로젝트 설계VE 준비단계 업무 개선 및 체계화)

  • Yang Jin Kook;Kim Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.122-132
    • /
    • 2005
  • The importance of design value engineering in construction projects recently is rising, which deal about in reduction of cost and improvement of quality. Especially, From half of this year 2005, It is predicted that the value engineering is necessary to be carried out in the projects having project cost more than 10 billion won. In increasing importance of value engineering, we require a way by which we accomplish value engineering systemically and effectively though it is not common in domestic situation. So, this case study shows a way in carrying out value engineering effectively. As the way is to apply QFD(Quality Function Deployment) in pre-study work of design value engineering, this is expected to contribute as function analysis and reflect the requirement of users or owners.

Reconstruction of esophageal stenosis that had persisted for 40 years using a free jejunal patch graft with virtual endoscopy assistance

  • Fujisawa, Daisuke;Asato, Hirotaka;Tanaka, Katsunori;Itokazu, Tetsuo;Kojya, Shizuo
    • Archives of Plastic Surgery
    • /
    • v.47 no.2
    • /
    • pp.178-181
    • /
    • 2020
  • In this report, we present a case in which good results were achieved by treatment using a free jejunal patch graft with virtual endoscopy (VE) assistance in a patient whose swallowing had failed to improve for 40 years after he mistakenly swallowed sulfuric acid, despite pectoralis major myocutaneous flap grafting and frequent balloon dilatation surgery. During the last 20 years, virtual computed tomography imaging has improved remarkably and continues to be used to address new challenges. For reconstructive surgeons, the greatest advantage of VE is that it is a noninvasive modality capable of visualizing areas inaccessible to a flexible endoscope. Using VE findings, we were able to visualize the 3-dimensional shape beyond the stenosis. VE can also help predict the area of the defect after contracture release.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

A study on the improvement in decision making analysis for the selection of tunnel construction method (터널건설공법 선정을 위한 의사결정기법의 개선방안 연구)

  • Park, Jun-Kyung;Jun, Sung-Kwon;Kim, Young-Keun;Heo, Eun-Nyeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.261-276
    • /
    • 2002
  • Recently, for the purpose of choosing reasonable and economical construction, the decision making analyses, such as VE (Value Engineering) and LCC (Life Cycle Cost), are generally performed. But, these methods have some limitations for the application to subway tunnel construction method. So, the AHP (Analytical Hierarchy Process) analysis is applied to determine relative importance for obtaining objectivity in quantitative analysis. And, the LCSC (Life Cycle Social Cost) method is developed to account for the social loss and risk by tunnel construction. From the case of the subway ${\bigcirc}{\bigcirc}$ lot, those methods are very useful to decision making analysis. And, in that case, both quantitative and quantitative analysis appraisement, the drilling and blasting method is evaluated useful alternative proposal in comparing with the cut and cover method.

  • PDF

A Case Study on the Development of an urinary incontinence-preventive equipment (요실금 예방 치료기 제품 개발 사례 연구)

  • Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.4
    • /
    • pp.143-148
    • /
    • 2012
  • The problem of common difficulties for the implemented business that imposing the Value Engineering(VE) is crucial. Because of the difference in effect of VE by how an abstract concept as function digitize. Furthermore, to improve achievement of VE,, the advancement of VE is demanded. The most of business conducting the VE is pushing this method with the purpose of cost reduction. As explaining this product, the cost occupies the desktop of F1 and the component of product 54% with the result of analyzing the coefficient of functional requirement. Then the functional cost can be confirmed. Through the result of this study, the fact that the desktop, the bluetooth, the probe occupy the most of products with satisfying the function is able to confirm. An effort for cost reduction in purchasing through adjusting a stable quality demanded for the cost reduction is needed. Also, another effort of proper price reduction by diversification of buyer business is needed also.

  • PDF

Stem Firmness and Flowering Response of Cut Lilies as Influenced by Medium Composition in Box Culture

  • Suh, Jeung-Keun
    • Proceedings of the Korean Society for Bio-Environment Control Conference
    • /
    • 2001.04b
    • /
    • pp.45-50
    • /
    • 2001
  • Stem firmness and flowering response of cut lily as influenced by medium composition (Control: Upland soil, Pt: Peatmoss, Pe: Perlite, Ve: Vermiculite, Rrh: Rotted rice-hull, RPt: Russian Peatmoss) were studied. For 'Casa Blanca', plant height and length of flower stalk increased when bulbs were planted in Pt:Rrh:Ve(1:1:1, v/v), and dried leaves of lower part plants decreased by RPt:Pe:Rrh(1:1:1, v/v). In case of 'Marco Polo' plant height and length of flower stalk increased with Pt:Rrh(1:1, v/v) as compared to other treatment, number of leaves and dried leaves increased when bulbs were planted in RPt:Pe:Rrh(1:1:1, v/v) as compared to control. Flowering of 'Casa Blanca' was promoted in Pt:Pe:Ve(1:1:1, v/v) and 'Marco Polo' was accelerated in Pt:Rrh:Ve(1:1:1, v/v). Flower length of 'Casa Blanca' was increased by RPt:Pe:Rrh(1 :1 :1, v/v) as compared with control and 'Marco Polo' was increased when bulbs planted to Pt:Rrh(1 :1, v/v). Flower-bud blasting of two cultivars was increased with Pt as compared with other treatment. Stem firmness of 'Casa Blanca' was increased by Pt:Pe:Ve (1:1 :1, v/v), and especially, stem firmness of upper part plants was increased by Pt:Rrh(1 :1, v/v) in 'Marco Polo' as compared to control plants. but generally, stem firmness of 'Casa Blanca' was not influenced with all cultural media as compared to control.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

Stem Firmness and Flowering Response of Cut Lilies as Influenced by Medium Composition in Box Culture (절화백합의 상자 재배시 몇가지 배양토 조성이 생육과 줄기경도에 미치는 영향)

  • Suh, Jeung-Keun
    • Journal of Bio-Environment Control
    • /
    • v.10 no.2
    • /
    • pp.75-79
    • /
    • 2001
  • Stem firmness and flowering response of cut lily as influenced by medium composition (Control; Upland soil, Pt; Peatmoss, Pe; Perilite, Ve; Vermiculite, Rrh; Rotted rice-hull, RPt: Russian Peatmoss) were studied. For 'Casa Blanca', plant height and length of flower stalk increased when bulbs were planted in Pt:Rrh:Ve (1:1:1, v.v$^{-1}$ ), and dried leaves of lower part plants decreased in RPt:Pe:Rrh (1:1:1, v.v$^{-1}$ ). In case of 'Marco Polo', plant height and length of lower stalk increased in Pt:Rrh (1:1, v.v$^{-1}$ ) as compared to other treatment, number of leaves and dried leaves increased when bulbs were planted in RPt:Pe:Rrh (1:1:1, v.v$^{-1}$ ) as compared to the control. Flowering of 'Casa Blanca' increased in RPt:Pe:Rrh (1:1:1, v.v$^{-1}$ ) as compared to the control and that o 'Marco Polo' increased when bulbs planted in Pt:Rrh(1:1, v.v$^{-1}$ ). Flower-bud blasting of both cultivars increased with Pt as compared. Stem firmness of 'Casa Blanca' increased in Pt:Pe:Ve (1:1:1, v.v$^{-1}$ ), and especially stem firmness of upper part plant of 'Marco Polo' increased in Pt:Rrh (1:1, v.v$^{-1}$ ) as compared to the control. Generally, stem firmness of 'Casa Blanca' was not influenced by the culture medium.

  • PDF

A Case Study on the Functional Analysis for the Success of New Product Development (신제품개발 성공을 위한 기능분석 적용사례)

  • Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.4
    • /
    • pp.155-161
    • /
    • 2014
  • The satisfaction of customers from the design stage of product was investigated and reflected by the stage of important function analysis in the enforcement of technique. The goal of this research is worked one reasonable function analysis of the cost reduction and quality enhancement to spread out by using QFD (Quality Function Development). In the case study, the function analysis of VE under the this theoretical background applied to one personal functional combination stimulator. In order to get our goal, the theoretical and case study was in parallel studied each other. This result shows that the new product by using the satisfaction of customers and the quality function development is pointed out the coincidence of the product value.

  • PDF