• Title/Summary/Keyword: VE 데이터베이스

Search Result 13, Processing Time 0.022 seconds

A Study on Developing the Actual cases Database of Value Engineering of Building Construction (건축 VE 실적사례 데이터베이스(DB) 구축 연구)

  • Seo, Yong-Chil;Woo, Yu-mi;Lee, Seung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.67-73
    • /
    • 2010
  • The results of VE (Value Engineering) analyses are highly feasible proposals that are produced by utilizing the experience and knowledge of professionals from a variety of fields. As such, the results of past similar projects can be useful in new projects. On this basis, it is vital to accumulate the historical data of the results on VE analyses performed at every stage, which are functions, ideas, and proposals. In this research, a data formational system for collecting this historic data was established by categorizing 'Item,' 'Function,' 'Idea,' and 'Proposal' according to VE process, and the data retrieval and the adjusting process were proposed. If the historic data of these are accumulated using the suggested method, it is expected to be useful at the stage of VE process.

VE.LCC Case Analysis on the Build-Transfer-Lease(BTL) Projects of School facility (학교시설 임대형민간투자사업(BTL)의 VE.LCC 사례 분석)

  • Lee, Do-Hyung;Park, Woo-Jin;Chu, Gook-Sik;Cho, Ki-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.143-148
    • /
    • 2008
  • This study is VE LCC case analysis on two school BTL projects which is constructed by Private sector and rented to government. Then private sector payback their initial cost and profit by rental fee from government. The VE in Korea, revised by the method of the Construction Technique - Enforcement Ordinance in 2005 is applicable to construction business which size is over 10 billion won. The VE well known as a way of productivity elevation is already proven and outstanding management method In construction industry inside and outside of the courtly. As its unique personality of BTL business, VE workshop period is too short. There is a few accomplished BTL project and data base, because BTL business begun from year of 2006. So we are trying to proof effect of VE LCC through case study of school BTL projects.

  • PDF

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.

A Preliminary Study of Prototype for Improving VE Workshop Phase based on BIM (BIM 기반 VE 워크샵 단계의 업무 향상을 위한 프로토타입 개발에 관한 기초연구)

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.113-122
    • /
    • 2015
  • VE workshop is performed based on VE expert' experiences without retrieving VE data of similar previous projects. Moreover, it usually omitted or applied for the sake of formality due to insufficiently understanding VE function, limited time, space and budget. Even though many studies have established VE databases for retrieving and reusing VE data, VE workshop is still inefficient and ineffective to improve projects' values. With this regard, this study proposes a preliminary prototype for improving VE workshop, which utilizes the state-of-the-art information communication technologies(ICTs) including Building Information Modeling(BIM), Mobile Computing(MC), Network Service System(NSS), and Database Management System(DBMS) for better managing, storing and reusing VE data. The prototype was developed to evaluate advantages and limitations. The results show that the proposed prototype can support visual VE data retrieval from similar previous projects, enhance communication among VE team and save much time and cost comparing to traditional VE. Through this, the productivity of VE workshop can improve efficiently and effectively.

BIM-Based New Construction Technology Database Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM 기반 건설신기술 데이터베이스 구축)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.163-164
    • /
    • 2023
  • The active promotion of construction technology application, aimed at cost reduction, construction time shortening, and performance enhancement during the implementation of Value Engineering (VE) in design, is underway. However, in the process of deriving VE ideas, it is common to simply reuse VE ideas from similar past construction projects, and the application of construction technology is often insufficient. Therefore, in this study, we intend to establish a database linking construction technology information with Building Information Modeling (BIM) models to activate the application of construction technology in the process of deriving VE ideas.

  • PDF

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

Dynamic Combination of Land Use Planning and Water Planning using GIS, VE and LCC (GIS, 가치공학, 그리고 생애주기비용에 의한 토지이용계획과 상수도계획의 동적인 연계)

  • Kim, Hyeong-Bok
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2000.06a
    • /
    • pp.93-105
    • /
    • 2000
  • GIS is a powerful toolbox in managing spatial data associated with attribute data. However GIS is short of spatial analysis function and graphic user interface(GUI) function in dealing with dynamic planning problems. Decision Support Systems(DSS) make up for the shortage of GIS by providing GUI function, modeling function and database function. Spatial Decision Support Systems(SDSS), a new kind of DSS, incorporate display function, basic spatial analysis function and manipulation function of spatial data and attribute data of GIS and GUI function, modeling function and database function of DSS in dealing with spatial planning problems. Planning Support Systems(PSS) add more advanced spatial analysis function and intertemporal function to the functions of SDSS. This study focuses on the modeling of a PSS for capacity expansion of water-distribution network depending upon land use planning by using GIS, value engineering(VE) and life cycle costing(LCC). The PSS shows a guideline about the investment of water-distribution networks related to urban growth management through generating certain numbers of dynamic alternatives to supply the amount of water caused by land use planning.

  • PDF

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

Isolation and Characterization of Two Methyltransferase Genes, AfuvipB and AfuvipC in Aspergillus fumigatus (Aspergillus fumigatus에서 Methyltransferase 유전자 AfuvipB와 AfuvipC의 분리 및 분석)

  • Elgabbar, Mohammed A. Abdo;Han, Kap-Hoon
    • The Korean Journal of Mycology
    • /
    • v.43 no.1
    • /
    • pp.33-39
    • /
    • 2015
  • In filamentous fungi, velvet complex associated with the veA gene plays pivotal roles in development and secondary metabolism. In a model fungus Aspergillus nidulans, many proteins that can interact with VeA, including two methyltransferases VipB and VipC, have been isolated and characterized. In this study, we isolated homologs of the vipB and vipC genes in the human opportunistic pathogenic fungus Aspergillus fumigatus and named AfuvipB and AfuvipC. The AfuvipB gene, annotated as Afu3g14920 in the Aspergillus Genome Database (AspGD) database, consists of 1,510 bp interrupted with 10 introns yielding 336 amino acid-long putative methyltransferase protein. Similarly, AfuvipC, which is Afu8g01930, has 10 introns and encodes a polypeptide with 339 amino acids having a methyltransferase domain in the middle of the protein. To characterize the function of the genes in A. fumigatus, knock-out mutants were generated and the phenotypes were observed. Deletion of AfuvipB gene caused no obvious phenotypic change on point inoculation but showed smaller colony than wild-type when the mutant was subjected to culture on single spore-driven culture condition. However, AfuvipC deletion mutant demonstrated no phenotypic difference from wild type both in point inoculation and streaking cultures. These results indicate that the two methyltransfereases might have a redundant role and could be dispensable in normal culture conditions.