A Study on application of Trapezoidal Steel Box Tunnelling Method (지중압입체를 이용한 지하구조물 축조방법의 적용성 연구)

  • Jun, Sung Bai
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.2
    • /
    • pp.138-154
    • /
    • 2008
  • The conventional non-dig underground structure building method which made an appearance to reduce the social and environmental costs and maximize the efficiency of the social overhead capital facilities could not help being uneconomical because of many problems such as unnecessary excessive excavation, water leakage, obstacle interference, difficulty of curvilinear application and connection complexity between propelled and injected bodies due to indiscriminate application of small and large circular steel pipes without consideration of the site conditions. The T.S.T.M, in which a protruded square tube is applied as a propulsion and injection body in a design that considered site conditions such as ground condition, depth of soil and live load, was able to be economical as it solved the problems of water resistance, minimization of obstacle interference and curvilinearity, and we can see that it can be applied to all grounds by utilizing or complementing the target ground in terms of engineering. Also in configuring the transverse section, it is possible to not only secure excellent structural safety but also implement all of the above engineering characteristics not only in the square cross section but also in the arch cross section, so it was possible to build structures on any section or ground, and we could confirm the LCC reduction effect and the VE effect.

  • PDF

A Study on Comparison of Slope Revegetation Methods Through Value Engineering Analysis (가치공학분석을 통한 비탈면녹화공법 비교에 관한 연구)

  • Kim, Nam-Choon;Kim, Do-Hee
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.1
    • /
    • pp.93-102
    • /
    • 2010
  • Greening sometimes fails because its method is not suitable for various site conditions, therefore the trend of selecting a revegetation method in Korea today is through test construction. However, due to enlargement, complication and diversification of domestic construction businesses, the importance of VE is gradually increasing as effective efforts over a whole life-cycle to obtain goals such as quality improvement and cost reduction, and not only quality and economic efficiency but also substantiality need to be considered in comparing revegetation methods. For this study, Sungnam~Janghowon (area1), where comparatively various slope revegetation methods are used, was selected the investigation site. The site was divided into three areas:blasting rock, ripping rock and earth sand. The revegetation methods used were six in the blasting rock area, five in the ripping rock area, and two in the earth sand region. 2007 monitoring data was analyzed, and Value (V) was calculated with LCC related ratio, and compared and contrasted with the evaluation of prior revegetation methods. Therefore it is believed that this analysis enables selection of the most appropriate method, unbiased towards one particular characteristic such as quality, vegetation growth and economy. When aiming for a durable effect, it shall be more efficient to select the most appropriate method focusing on LCC analysis, which deals with the economic aspect, as well as the design function aspect.

Analysis of importance by category for quantitative economic evaluation of multi-utility tunnel (공동구의 정량적 경제성 평가를 위한 항목별 중요도 분석)

  • Cho, Choong-yeun;Sim, Young-Jong;Kim, Hun-kyom;Lee, Pil-yoon;Lee, Min-jae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.119-130
    • /
    • 2018
  • The VE/LCC study on the existing multi-utility tunnel examined the economical feasibility of the collective area through the cost-benefit analysis of the ten major routes of Seoul for the benefit (7 items) and the cost (5 items) through quantitative methods. In this paper, we analyzed the economic efficiency of 61 sectors by adding 3 items (reduced traffic accident, reduced vehicle noise, social-economic loss). The reduced traffic accident item is an improvement of the traffic accident cost that can be saved by the implementation of the project, and the reduced vehicle noise item is an indicator of the amount of noise change caused by the implement of the business. Finally, the social-economic loss items represent the impact on the local economy due to the construction of the multi-utility tunnel. The amounts of the additional items were compared and items added in the open type and tunnel type multi-utility tunnel were analyzed for each analysis. Result on the analysis, it analyzed the items applied to the basic and detail models in the economic evaluation of the multi-utility tunnel design, and makes it possible to evaluate the economic efficiency more efficiently. The economic evaluation of the basic and detailed models including the items presented in this study will be often used in the design of the multi-utility tunnel design.

AHP 기법을 이용한 교량상부구조의 VE 검토

  • Park, Jang-Ho;Sin, Yeong-Seok;An, Ye-Jun;Lee, Gwang-Gyun
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.52
    • /
    • pp.58-66
    • /
    • 2011
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types (Steel box girder, Rational girder, PSC-I girder) using Value Engineering (VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost (LCC), Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process (AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

  • PDF

Examination of Value Engineering for Bridge Superstructures using Analytic Hierarchy Process (AHP 기법을 이용한 교량상부구조의 VE 검토)

  • Park, Jang-Ho;Shin, Yung-Seok;Ahn, Ye-Jun;Lee, Kwang-Kyun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.79-85
    • /
    • 2009
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types(Steel box girder, Rational girder, PSC-I girder) using Value Engineering(VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost(LCC). Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process(AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

The Method Improving the Productivity of a Project through Construction Management Techniques (CM의 요소기술을 이용한 프로젝트의 생산능력향상)

  • Yoon Tae-Kwon;Chung Jai-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.133-136
    • /
    • 2005
  • This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.

  • PDF

Development of Preventive Maintenance Plan based on PRA - Case Study of Pansong-Line Railway in Pusan - (위험도평가에 기초한 예방유지관리 계획 - 부산지하철 반송선의 설계 예 -)

  • Kim Jae-Won;Choi Young-Min;Kim Dae-Sung;Kim Kyo-Hun;Park Hyang-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.482-487
    • /
    • 2005
  • In the most current Turn-key bidding and Alternative design, is going to establish maintenance plan along with a economical assessment (VE/LCC assessment etc). Generally, establishment of maintenance plan is based on past experiences that are decided upon sensor position and amount with analytic or mechanical control section. But, it is more reasonable that maintenance plan based on level of significance for Probabilistic Risk, with presuming damage probability assessment of structural fracture scenarios. Therefore, in this study it is considered about the technique that an improved maintenance plan of railroad structures using PRA (Probabilistic Risk Assessment) on the basis of structural reliability theory. For this, in the paper, Preventive maintenance plan based on PRA is suggested with an application example of Pansong-Line (Line number 3) railway in Pusan works that actually executed Turn-key design.

  • PDF

Development of Verification System and Selection Process for Track Structure (궤도구조 성능검증체계 및 선정프로세스 구축)

  • Lee, Ho-Ryong;Jang, Seung-Yup;Kim, Yeon-Guk;Yun, Sung-Soon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF

A Value Analysis of Ecological Restoration Construction Considering Life Cycle Cost and Performance - Focusing on the Wet Media for Slope Revegetation - (생애주기비용과 성능을 고려한 생태복원 공법 가치분석 - 습식 비탈면 기반재를 사례로 -)

  • Li, Lan;Kim, Sung Hee;Kim, Bo Heui;Lim, Su Hyun;Kim, Sung Il;Koo, Bon Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.5
    • /
    • pp.101-109
    • /
    • 2014
  • In order to save costs and enhance quality in construction without damaging the environment, the VE/LCC analysis method is increasingly used. This study was carried out to conduct a value analysis for the ecological restoration of a slope considering life cycle cost and performance. The construction conditions were classified into three types(A, B, C) according to the condition of each base. Three construction methods for slope ecological restoration were selected by each condition. Eventually, a value analysis was conducted for total nine conditions by analyzing the life cycle cost and performance. The gradient of slope and base of Condition 1 were below 1:1.2 and general soil, while condition 2 and 3 were below 1:1.0(reaping rock) and below 1:0.7(soft rock, blasted rock), respectively. A value analysis was conducted based on the value estimated via life cycle cost and performance analysis. The result showed that the B construction method had the highest value in Condition 1 as it showed 108.4, while A and C showed 90.3 and 45.8, respectively. When it comes to Condition 2, Construction Method A indicated the highest value as it showed 89.1(B: 47.5, C: 47.0). In Condition 3, Construction Method A(89.1) was the highest, while B and C showed 55.4 and 40.2, respectively. Based on the result of this study, in order to make a reasonable decision that can enhance quality and reduce costs in slope ecological restoration, the slope ecological restoration method must be reviewed in consideration of life cycle cost and performance.