• 제목/요약/키워드: V-metering

검색결과 18건 처리시간 0.019초

Revenue metering system using optical CPT

  • Cho, Hong-Keun;Kim, Seok-Ku;Lee, Won-Bin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 Proceedings of the Korea Automatic Control Conference, 11th (KACC); Pohang, Korea; 24-26 Oct. 1996
    • /
    • pp.417-421
    • /
    • 1996
  • A new concept of 22.9kV class revenue metering system based on the optical sensing technique was designed and implemented. This paper reports on the performance of a 22.9kV class three phase optical current/voltage metering scheme and three tariff metering system. This optoelectronic system was designed and developed to advance the state of the art in revenue metering. This paper deals with the characteristics of designed optical CPT (Current and Potential Transformer) and optoelectronic demand meter. The extensive field evaluation of the developed system with the existing oil filled transformer and solid state metering pair is undertaking. Upto now the operation of the optical revenue metering system under the field condition compares favorably with the existing system.

  • PDF

접근로별 포화도를 고려한 Roundabout Signal Metering 운영방법에 관한 연구 (Roundabout Signal Metering Operation Methods by Considering Approach Lane's Degree of Saturation)

  • 안우영;이소영
    • 한국도로학회논문집
    • /
    • 제15권5호
    • /
    • pp.217-226
    • /
    • 2013
  • PURPOSES : Under the capacity conditions with balanced approach flows, roundabouts give less delay than existing signalized intersections; however, flows over 450 vehicles/hour/lane with unbalanced approach flow conditions, roundabouts efficiency drops due to the short time difference between the critical gap and the follow-up headway. The purpose of this study is developing a roundabout Signal Metering operation method by considering approach lanes degree of saturation. METHODS : A four-way-approach with one-lane roundabout is selected to compare the Signal Metering performance for the case of 16 different unbalanced flow conditions. Based on these traffic conditions, the performance is evaluated for 64 different cases of Signal Metering combinations by using SIDRA software. A degree of saturation(V/C ratio) sum for two adjoined approaches is used for the performance index of choosing Metered Approach and Controlling Approach. RESULTS : When the V/C ratio sum is 0.29~0.81 and Metered Approach flow is less than Controlling Approach flow, the average delay saving per vehicle is about 7 seconds; however, after this rage the delay saving decreases gradually until the V/C ratio sum reaches around 1.0. The range of V/C ratio sum 0.93~1.09 provides average delay saving per vehicle about 3 seconds. In case of V/C ratio sum is grater than 1.0 and the flows of Metered Approach is grater than Controlling Approach, the average delay per vehicle increases 3~11 times respectively. CONCLUSIONS : As expected, the Signal Metering provides substantial improvements in delay saving for the case of V/C ratio sum is 0.3~1.0 under the traffic flow conditions of Metered Approach is less than Controlling Approach.

전기철도차량 운행에너지 실시간 계측을 위한 에너지 미터링 장치 개발에 관한 연구 (A Study on the Development of a Real-time Energy Metering Device for Electric Railway Vehicles)

  • 김용기;한문섭;천윤영;배창한;윤병주
    • 전기학회논문지
    • /
    • 제65권4호
    • /
    • pp.689-694
    • /
    • 2016
  • The objective of this study is to identify the requirements for a energy metering device and develop a real-time energy metering device for measuring energy (electricity) consumption of the electric railway vehicle during its operation. The study also evaluated the performance of the AC voltage sensor, current sensor, and data meter for the device and performed EMC tests such as surge and EFT (Burst). The performance tests showed that the percent errors of the AC voltage sensor and current sensor were ${\leq}0.1%$, and ${\leq}0.5%$ under 10~127V, and 10~250A, respectively. The result of surge and EFT (Burst) tests also indicated that the device had no malfunction in any wave (combination and ring waves) under the treat level with 2kV. The result of the field test also confirmed that the device had no malfunction in data metering.

분산형 발전고객의 OCGR오동작 및 과부족 계량에 대한 사례연구 (A Case Study on Malfunction of OCGR and Inaccuracy of Watt-hour Meter in Distributed Generation System)

  • 신동열;박용우;차한주
    • 전기학회논문지
    • /
    • 제57권8호
    • /
    • pp.1349-1355
    • /
    • 2008
  • The paper shows the analysis of operating conflict of OCGR trip events and metering errors in the photovoltaic generation, wind generation distributed generation customers with no defect of the distributed generation facilities, which are connected to 22.9kV distribution lines. To analyze problems with metering errors and OCGR fault event, a power quality analyzer and PSIM program were used to test the field and to simulate in Sun-Cheon photovoltaic generation and Seo-Cheon photovoltaic generation customers. With the trial distribution line, the result of analysis was verified to prove with the same situation of the actual field. This paper suggests short term and long term countermeasures of OCGR fault events, analysis of over and shortage of metering errors in distributed generation customers.

도시철도 직류 전력량 계측을 위한 직류용 스마트미터링 시스템 개발 및 성능시험 (Development and Performance Test of DC Smart Metering System for the DC Power Measurement of Urban Railway)

  • 정호성;신승권;김형철;박종영
    • 전기학회논문지
    • /
    • 제63권5호
    • /
    • pp.713-718
    • /
    • 2014
  • DC urban railway power system consists of DC power network and AC power network. The DC power network supplies electric power to railway vehicles and the AC power network supplies electric power to station electric equipment. Recently, because of power consumption reduction and peak load shaving, intelligent measurement of regenerative energy and renewable energy adapted on DC urban railway is required. For this reason, DC smart metering system for DC power network shall be developed. Therefore, in this paper, DC voltage sensor, current sensor, and DC smart meter were developed and evaluated by performance test. DC voltage sensor was developed for measuring standard voltage range of DC urban railway, and DC current sensor was developed as hall effect split core type in order to install in existing system. DC smart meter possesses function of general intelligent electric power meter, such as measuring electricity and wireless communication etc. And, DC voltage sensor showed average 0.17% of measuring error for 2,000V/50mA, and current sensor showed average 0.21% of measuring error for ${\pm}2,000V/{\pm}4V$ in performance test. Also DC smart meter showed maximum 0.92% of measuring error for output of voltage sensor and current sensor. In similar environment for real DC power network, measuring error rate was under 0.5%. In conclusion, accuracy of DC smart metering system was confirmed by performance test, and more detailed performance will be verified by further real operation DC urban railway line test.

초음파를 이용한 역타기둥 이음부의 공극특성에 관한 연구 (A Study on Void Characteristics with V-meter in Top-Down Column Joint Part.)

  • 이영도;정상진
    • 한국건축시공학회지
    • /
    • 제1권2호
    • /
    • pp.191-195
    • /
    • 2001
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down , through V-metering for top down column and concrete experiment. To minimize the void of reverse placement joint, It is more effect to use the sheath method then direct method in concrete placement.

  • PDF

친환경 정밀농업을 위한 입제 변량살포기 개발 (III) -공기이송 시스템 분석과 입제 살포균등도 향상- (Development of a Variable Rate Granule Applicator for Environment-Friendly Precision Agriculture (III) - Analysis of Pneumatic Conveying System and Improvement of Fertilizer Application Uniformity -)

  • 김영주;김학진;장태사;이중용
    • Journal of Biosystems Engineering
    • /
    • 제31권6호
    • /
    • pp.482-488
    • /
    • 2006
  • Application of precision farming technology to rice cultivation could be an effective measure for rice quality improvement and environment-friendly agriculture. This study was conducted to develope a variable rate pneumatic granule applicator. Previous study reported that application uniformity of the prototype machine (C.V. = 23.3%) was not satisfactory. To improve the uniformity, increase of blow-head number from 12 to 16 was suggested. Analysis of the pneumatic conveying system showed that increase of number of blow-head was possible. Three-way variance analysis of the modified applicator showed that inserting length should be changed according to granule metering rate. The range of metering rate from 27.3 to 417.9 g/s were divided into 4 levels and 4 sets of inserting lengths were determined to ensure CV values less than 15%. The revised applicator showed satisfactory C.V. values of 9.4 to 14.6% in the metering rate. Granule conveying pattern was observed using a high speed camera and judged as the homogeneous flow pattern.

Single-Phase Energy Metering Chip with Built-in Calibration Function

  • Lee, Youn-Sung;Seo, Jeongwook;Wee, Jungwook;Kang, Mingoo;Kim, Dong Ku
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제9권8호
    • /
    • pp.3103-3120
    • /
    • 2015
  • This paper presents a single-phase energy metering chip with built-in calibration function to measure electric power quantities. The entire chip consists of an analog front end, a filter block, a computation engine, a calibration engine, and an external interface block. The key design issues are how to reduce the implementation costs of the computation engine from repeatedly used arithmetic operations and how to simplify calibration procedure and reduce calibration time. The proposed energy metering chip simplifies the computation engine using time-division multiplexed arithmetic units. It also provides a simple and fast calibration scheme by using integrated digital calibration functionality. The chip is fabricated with 0.18-μm six-layer metal CMOS process and housed in a 32-pin quad-flat no-leads (QFN) package. It operates at a clock speed of 4096 kHz and consumes 9.84 mW in 3.3 V supply.

초음파탐사를 통한 타설방법이 공극에 미치는 영향에 관한 연구 (A Study on Void Check as Placing Method with Use of V-meter Method)

  • 임형일;최창기;정근호;김우재;이영도;정상진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 가을 학술발표회 논문집(II)
    • /
    • pp.1107-1112
    • /
    • 2000
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down, through V-metering for top down column and concrete experiment.