• Title/Summary/Keyword: Utility Grid

Search Result 244, Processing Time 0.023 seconds

Performance Analysis of Anti-islanding Function for Grid-connected PV Inverter Systems under Parallel Connections (병렬운전하는 계통연계형 태양광 발전용 인버터의 단독운전 검출 성능 분석)

  • Jung, Young-Seok;Yu, Byung-Gyu;Kang, Gi-Hwa
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.5
    • /
    • pp.34-40
    • /
    • 2013
  • Islanding phenomenon of photovoltaic system is undesirable because it leads to a safety hazard to utility service personnel and may cause damage to power generation and power supply facilities as a result of unsynchronized re-closure. Anti-islanding protection is an important technical requirement for grid-connected PV system. Until now, various anti-islanding methods for detecting and preventing islanding of photovoltaic and other distributed generations have been proposed. Most of them are focusing on the anti-islanding performance of single PV system according to the related international and domestic standard test procedures. There are few studies on the islanding phenomenon for multiple photovoltaic operation in parallel. This paper presents performance analysis of anti-islanding function for grid-connected PV inverter systems when several PV inverters are connected in parallel.

A Study on the Power Quality of the Grid connected Photovoltaic Power System (계통 연계형 태양광 발전시스템의 전력품질에 관한 연구)

  • Choi, Hyoung-Bum;Kim, Kyung-Chul;Hwang, Young-Rok
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.8
    • /
    • pp.88-98
    • /
    • 2011
  • Development and use of renewable energy due to environmental problems and depletion of energy affect grid-connected power system around the world. Therefore this paper analyzes the characteristic of gird connected photovoltaic power generation system which it is available to connect the utility. Renewable energy photovoltaic power system has been linked to the system to analyze the impact of photovoltaic system. MATLAB / Simulink program is modeled and analyzed on power quality of a photovoltaic power plant. It is measured that power data for the Grid connected photovoltaic power plant with instantaneous measuring, 3sec measuring, 10min measuring for 7 days. Harmonic field measurement have shown that the harmonic contents of a waveform varies with time. A cumulative probability approach is the most commonly used method to solve time varying harmonics. so, it is used 50[%] cumulative probability approach. This paper provides an in depth analysis on power quality field measurement of the Grid connected photovoltaic power plant.

A Study on Developing the Simulation Model of Micro-Sources (마이크로소스의 EMTDC 시뮬레이션 모델 개발에 관한 연구)

  • Son, Kwang-Myoung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.8
    • /
    • pp.24-32
    • /
    • 2005
  • Micro-source units having power ratings in thousands of watts can provide power quality with higher reliability and efficiency than the conventional large scale units. Since these units are small and easy to install, they are clustered with loads creating micro-grid services to customer sites such as office buildings, industrial parks and homes. Micro-sources adopt voltage source inverter to ensure the power quality of sensitive loads. This paper deals with the connection of micro-sources into the system grid EMTDC modeling of the grid connected micro-sources at the power frequency range are proposed and the characteristics of the control system parameters are investigated. Simulation results show that the micro-grid system with two micro-sources has good dynamic characteristics.

Design of an Off Grid type High efficiency Solar charging system Using MATLAB/Simulink (MATLAB/Simulink를 이용한 오프그리드형 고효율 태양광 충전 시스템 설계)

  • Gebreslassie, Maru Mihret;kim, Min;Byun, Gi-sig;Kim, Gwan-hyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.735-737
    • /
    • 2017
  • An Off grid or remote solar electric systems are an energy supply to our home or to our companies without the utility of Grid at all. Off grid solar systems are very important for those who live in remote locations especially for developing countries where getting the electric grid is extremely expensive, inconvenient or for those who doesn't need to pay a monthly bill with the electric bill in general. The main critical components of any solar power system or renewable energy harvesting systems are the energy storage systems and its charge controller system. Energy storage systems are the essential integral part of a solar energy harvesting system and in general for all renewable energy harvesting systems. To provide an optimal solution of both high power density and high energy density at the same time we have to use hybrid energy storage systems (HESS), that combine two or more energy storage technologies with complementary characteristics. In this present work, design and simulation we use two storage systems supercapacitor for high power density and lithium based battery for high energy density. Here the system incorporates fast-response supercapacitors to provide power to manage solar smoothing and uses a battery for load shifting. On this paper discuss that the total energy throughout of the battery is much reduced and the typical thermal stresses caused by high discharge rate responses are mitigated by integrating supercapacitors with the battery storage system. In addition of the above discussion the off grid solar electric energy harvesting presented in this research paper includes battery and supercapacitor management system, MPPT (maximum power point tracking) system and back/boost convertors. On this present work the entire model of off grid electric energy harvesting system and all other functional blocks of that system is implemented in MATLAB Simulink.

  • PDF

An Efficient and High-gain Inverter Based on The 3S Inverter Employs Model Predictive Control for PV Applications

  • Abdel-Rahim, Omar;Funato, Hirohito;Junnosuke, Haruna
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.4
    • /
    • pp.1484-1494
    • /
    • 2017
  • We present a two-stage inverter with high step-up conversion ratio engaging modified finite-set Model Predictive Control (MPC) for utility-integrated photovoltaic (PV) applications. The anticipated arrangement is fit for low power PV uses, the calculated efficiency at 150 W input power and 19 times boosting ratio was around 94%. The suggested high-gain dc-dc converter based on Cockcroft-Walton multiplier constitutes the first-stage of the offered structure, due to its high step-up ability. It can boost the input voltage up to 20 times. The 3S current-source inverter constitutes the second-stage. The 3S current-source inverter hires three semiconductor switches, in which one is functioning at high-frequency and the others are operating at fundamental-frequency. The high-switching pulses are varied in the procedure of unidirectional sine-wave to engender a current coordinated with the utility-voltage. The unidirectional current is shaped into alternating current by the synchronized push-pull configuration. The MPC process are intended to control the scheme and achieve the subsequent tasks, take out the Maximum Power (MP) from the PV, step-up the PV voltage, and introduces low current with low Total Harmonic Distortion (THD) and with unity power factor with the grid voltage.

RTDS based Transient Analysis of PMSG Type wind Power Generation System (RTDS를 이용한 영구자석형 동기발전기를 갖는 풍력발전시스템의 과도현상 해석)

  • Hwang, Chul-Sang;Kim, Gyeong-Hun;Kim, Nam-Won;Lee, Hyo-Guen;Seo, Hyo-Ryong;Park, Jung-Do;Yi, Dong-Young;Lee, Sang-Jin;Park, Min-Won;Yu, In-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.572-576
    • /
    • 2011
  • The operation of permanent magnet synchronous generator (PMSG) type wind power generation system (WPGS) can be affected by the utility condition. Consequently, transient condition of utility should be analyzed for the safe and reliable operation of WPGS. This paper presents transient analysis results of a PMSG type WPGS using real time digital simulator (RTDS). A fault condition was applied to the transient analysis of PMSG type WPGS as the transient grid condition. The simulation results were analyzed to show the operational characteristic of PMSG type WPGS under the transient phenomenon of utility.

Seamless Mode Transfer of Utility Interactive Inverters Based on Indirect Current Control

  • Lim, Kyungbae;Song, Injong;Choi, Jaeho;Yoo, Hyeong-Jun;Kim, Hak-Man
    • Journal of Power Electronics
    • /
    • v.19 no.1
    • /
    • pp.254-264
    • /
    • 2019
  • This paper proposes an indirect current control technique based on a proportional resonant (PR) approach for the seamless mode transfer of utility interactive inverters. Direct-current and voltage hybrid control methods have been used for inverter control under grid-connected and islanded modes. A large bandwidth can be selected due to the structure of single-loop control. However, this results in poor dynamic transients due to sudden changes of the controller during mode changes. Therefore, inverter control based on indirect current is proposed to improve the dynamic transients by consistently controlling the output voltage under all of the operation modes. A PR-based indirect current control topology is used in this study to maintain the load voltage quality under all of the modes. The design processes of the PR-based triple loop are analyzed in detail while considering the system stability and dynamic transients. The mode transfer techniques are described in detail for both sudden unintentional islanding and islanded mode voltage quality improvements. In addition, they are described using the proposed indirect control structure. The proposed method is verified by the PSiM simulations and laboratory-scale VDER-HILS experiments.

Feasibility Study of the Introduction of Hydrogen System and Plus DR on Campus MG

  • Woo, Gyuha;Park, Soojin;Yoon, Yongbeum
    • New & Renewable Energy
    • /
    • v.18 no.1
    • /
    • pp.35-45
    • /
    • 2022
  • The renewable energy based MG is becoming one of the prominent solutions for greenhouse gas and constructing less power lines. However, how to procure the economics of MG considering the CO2 emission and utility network impact is one of major issues as the proportion of renewable resource increases. This paper proposes the feasibility study scheme of campus MG and shows that the LCOE and CO2 emission can be reduced by utilizing the excess power and introducing hydrogen system and plus DR. For this, the three cases: (a) adding the PV and selling excess power to utility, (b) producing and selling hydrogen using excess power, and (c) participating in plus DR are considered. For each case, not only the topology and component capacity of MG to secure economic feasibility, but also CO2 emission and utility network effects are derived. If an electrolyzer with a capacity of 400 kW participates in plus DR for 3,730hours/year, the economic feasibility is securable if plus DR settlement and hydrogen sale price are more than 7.08¢/kWh and 8.3USD/kg or 6.25¢/kWh and 8.6USD/kg, respectively. For this end, continuous technical development and policy support for hydrogen system and plus DR are required.

Modeling of a Grid-Connected Wind Energy Conversion System for Dynamic Performance Analysis (동특성해석을 위한 계통연계 풍력발전 시스템의 모델링)

  • Choo, Yeoun-Sik;Ro, Kyoung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1358-1360
    • /
    • 2002
  • This paper presents a modeling and simulation of a utility-connected wind energy conversion system with a link of a rectifier and an inverter. It discusses the maximum power control algorithm for the wind turbine and presents the relationship of wind turbine output, rotor speed, power coefficient, tip-speed ratio and wind speed when the wind turbine is operated under the maximum power control algorithm. The control objective is to extract maximum power from wind and transfer the power to the utility. This is achieved by controlling the pitch angle of the wind turbine blades. Pitch control method is mechanically complicated, but the control performance is better than that of the stall regulation method. The simulation results performed on MATLAB will show the variation of generator's rotor speed, pitch angle, and generator output.

  • PDF

Voltage quality and Network Interconnection Standard Suitability in Jeju-Hangwon Wind Power Generation Farm (제주행원 풍력발전단지의 전압품질 및 연계기준 적합성 분석)

  • Kim, Se-Ho;Kim, Eel-Hwan;Huh, Jonhg-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.2
    • /
    • pp.53-59
    • /
    • 2006
  • The number of wind generation installations are growing substantially in Jeju, Korea. Many of these installations are significant in size and directly connected to the distribution system. Utility grid interconnection standards for interconnecting non-utility distributed generation systems are essential to both power system company and generation company. These interconnection standards are important to utilities, customers, wind generation manufactures and nation. In this paper, it is investigated the voltage quality and the suitability of Jeju-Hangwon wind power generation farm by network interconnection technology standard.