• Title/Summary/Keyword: Users' assessment

Search Result 565, Processing Time 0.026 seconds

A Berth Assignment Planning for a Public Terminal (공공터미널의 선석배정계획에 관하여)

  • Keum, J.S.;Lee, H.G.;Lee, C.Y.
    • Journal of Korean Port Research
    • /
    • v.10 no.2
    • /
    • pp.7-15
    • /
    • 1996
  • A berth assignment problem has a direct impact on assessment of charges made to ships and goods. A berth can be assigned to incoming vessels and operated in tow different ways: as a common user berth, as a preference berth. A common user berth is a berth that any ship calling at a port may be permitted to use according to her time of arrival and to priorities as determined by the port authority. In this paper, we concerned with various types of mathematical programming models for a berth assignment problem to achive an efficient berth operation. In this paper, we focus on a reasonable berth assignment programming in a public container terminal in consideration of trade-off between server and user. We propose a branch and bound algorithm & heuristic algorithm for solving the problem. We suggest three models of berth assignment to minimizing the objective functions such as total port time, total berthing time and maximum berthing time by using a revised Maximum Position Shift(MPS) with which the trade-off between servers and users can be considered. The berth assignment problem is formulated by min-max and 0-1 integer programming and developed heuristic algorithm to solve the problem more easily instead of branch and bound method. Finally, we gave the numerrical solutions of the illustrative examples.

  • PDF

A Model for Optimization Process of Asbestos Dismantling Work Using Simulation (시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델)

  • Cho, Hyeong-Jun;Noh, Jae-Yun;Lee, Ho-Hyeon;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

A study on the Development of BIM-based Quality Pre-checking System in Architecture Design Phase

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.284-288
    • /
    • 2015
  • Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.

  • PDF

Development of Chatbot Self-Inspection Scenario for Structural Safety of Existing Reinforced Concrete Buildings (챗봇 활용 철근콘크리트 건축물 구조안전 자가점검 시나리오 개발에 관한 연구)

  • Yang, Jaekwang;Kang, Taewook;Shin, Jiuk
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.6
    • /
    • pp.331-337
    • /
    • 2023
  • Due to the aging of a building, 38.8% (about 2.82 million buildings) of the total buildings are old for more than 30 years after completion and are located in a blind spot for an inspection, except for buildings subject to regular legal inspection (about 3%). Such existing buildings require users to self-inspect themselves and make efforts to take preemptive risks. The scope of this study was defined as the general public's visual self-inspection of buildings and was limited to structural members that affect the structural stability of old buildings. This study categorized possible damage to reinforced concrete to check the structural safety of buildings and proposed a checklist to prevent the damage. A damage assessment methodology was presented during the inspection, and a self-inspection scenario was tested through a chatbot connection. It is believed that it can increase the accessibility and convenience of non-experts and induce equalized results when performing inspections, according to the chatbot guide.

CRITIAL SUCCESS FACTORS FOR PROJECT MANAGEMENT INFORMATION SYSTEM IN CONSTRUCTION

  • Jung Ho Yu;Seul Ki Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.498-503
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

  • PDF

Intelligent Evaluation Algorithm for Identifying Hazards in Public Restrooms Using Virtual Reality and Sensor Data (가상현실과 센서데이터를 활용하는 공중화장실 위험요소 지능형 평가 알고리즘)

  • Shin-Sook Yoon;Jeong-Hwa Song
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.2
    • /
    • pp.473-482
    • /
    • 2024
  • This study utilized virtual reality to construct a simulated public restroom environment to identify potential hazards. The objective was to discern actual risks in real-world public restrooms through this virtual setup. During the virtual restroom experience, data from the built-in 3-axis accelerometer and gyroscope sensors of testor's smart phones were collected. Analysis of this data helped in identifying spatio temporal factors impacting the users. The determination of these factors as risk elements was based on an evaluation algorithm grounded in data analysis.

Change of Road Surface Design and Perception of Streetscape in Urban Areas (노면 디자인 차이가 가로경관 인식에 미치는 영향)

  • Hoyeon Lim;ChoHye Youn;Sangbin Han;Yeowon Lee;Juyoung Lee
    • Journal of Environmental Science International
    • /
    • v.33 no.2
    • /
    • pp.169-178
    • /
    • 2024
  • This study aimed to investigate the impact of pavement design changes on user perceptions, with the objective of enhancing safety in urban streetscape. A total of 72 participants were recruited, and the study focused on alleyways in areas with a high risk of crime. Employing the Semantic Differential (SD) methodology, an assessment was conducted to gauge participants' perceptions of three different pavement types (A-type, B-type, C-type) as well as the existing pavement. The results indicated that the C-type pavement, characterized by vibrant and harmonious color palettes and patterns, elicited the highest levels of perceived safety, comfort, and openness among users. This signifies that physical environmental improvements through color design can mitigate the feelings of insecurity and foster emotional stability. Therefore it is recommended to implement various color schemes and pattern designs to road surface for enhancing user safety in high-risk urban areas.

Assessment of Urban Land Suitability Analysis for Public Park Planning

  • Sungmin Cho
    • International journal of advanced smart convergence
    • /
    • v.13 no.3
    • /
    • pp.259-266
    • /
    • 2024
  • One of the most time consuming issues in a city development is the identification of suitable areas for urban infrastructures and proper land uses. Suitability analysis is the process and procedures to find the best available land in given area -that is, the ability of a system to select the needs of users in land use. This paper studied the usage of Geographic Information System technique and methods for the selection of the most appropriate sites for public park in the city of Gwangju. GIS was used as a standard technique to find the best available sites for development in urban areas. For this cause, digital elevation model and spatial data were used to produce different thematic layers by using software Idrisi. Criteria for finding the suitable site for park development were decided to evaluate the land and the followings 4 criteria were selected: on land with less than 3 degrees in slope, outside a 200m buffer around lakes, on land currently designated as forests, and 20ha or greater in size. To meet and measure each criterion, distance and context operators were applied to reclassify the importance of certain weight and Boolean images were generated to meet the criteria. These weights and maps has been combined using ArcGIS tools and the final map was prepared showing the most suitable sites. We may assist city planners and government officials in future development of public facilities including parks and related land use plans at urban level and act as to ensure proper land use planning and management of the urban areas.

Web Accessibility of Healthcare Websites of Korean Government and Public Agencies: Automated and Expert Evaluations (정부 및 공공기관의 보건 관련 웹 사이트의 웹 접근성 - 자동 및 전문가 평가 -)

  • Yi, Yong Jeong
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.26 no.4
    • /
    • pp.283-304
    • /
    • 2015
  • The purpose of this study was to identify Web accessibility issues of healthcare websites of the Korean government and public agencies by evaluating these websites' accessibility in accordance with the Korean Web Contents Accessibility Guideline. This study conducted both automated and expert testing to assess the accessibility of a total of 27 health-related websites. The results of the assessment which was conducted in two stages indicated that institutions such as the National Hospital and National Rehabilitation Center demonstrated almost no Web accessibility error. In addition, the Korea Health Insurance Review and Assessment Service, the Ministry of Health and Welfare, the Health Services Agency, the Ministry of Food and Drug Safety, and the Korea Medical Dispute Mediation and Arbitration Agency attained very high web accessibility. However, the results of an expert evaluation highlighted that there were considerable errors in providing appropriate alternative text, which was not found in the automated test, and the color contrast of the text content did not comply with Web accessibility standard. Therefore, these websites did not support web accessibility for the sight-impaired. Furthermore, the present study found that it was difficult to deliver accurate information to users due to errors in the default language display and markup, and also, issues of skipping repeated content, content linearization, and compliance with keyboard use were considered as challenges that might arise for people with sight, cognitive and mobility impairments with respect to Web accessibility. It is the first study that evaluated accessibility of healthcare websites of the Korean government and public agencies based on the Korean Web Contents Accessibility Guideline. The present study made a contribution to research on Web accessibility by conducting expert testing, which provided a more complete assessment that identified the degree and specific issues of accessibility errors when compared to automated testing.

Evaluation of Greenhouse Gas Emission for Wooden House Using Simplified Life Cycle Assessment Tool (목조주택 온실가스 배출량 평가를 위한 간이 전과정평가 툴 개발)

  • Chang, Yoon-Seong;Kim, Sejong;Son, Whi-Lim;Jung, Soon-Chul;Shin, Hyun-Kyeong;Shim, Kug-Bo
    • Journal of the Korean Wood Science and Technology
    • /
    • v.45 no.5
    • /
    • pp.650-660
    • /
    • 2017
  • In this study, simplified LCA (life cycle assessment) tool was developed to increase accessibility and availability on LCA timber construction. The result of simplified LCA was compared with commercial program on LCA (Simapro.7) to verify its availability. As a result of evaluating environmental impacts with the Life Cycle Inventory of all processes, gap between LCA and simplified LCA tools of timber construction was about 1%. Therefore, the simplified LCA tool could analyse greenhouse gas emissions of timber construction and to expand number of data set through improved conveniency of users for developing database of timber construction in Korea. The reduction effects of greenhouse gas emissions of timber construction was about 53% of total emission offset up to construction phase. The results of this study would support decision making process to expand to timber construction policy to showcase environmental friendliness of timber construction. It was expected to contribute to response to the New climate regime in forestry.