• Title/Summary/Keyword: Urban modeling

Search Result 815, Processing Time 0.028 seconds

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Estimation of Image-based Damage Location and Generation of Exterior Damage Map for Port Structures (영상 기반 항만시설물 손상 위치 추정 및 외관조사망도 작성)

  • Banghyeon Kim;Sangyoon So;Soojin Cho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.5
    • /
    • pp.49-56
    • /
    • 2023
  • This study proposed a damage location estimation method for automated image-based port infrastructure inspection. Memory efficiency was improved by calculating the homography matrix using feature detection technology and outlier removal technology, without going through the 3D modeling process and storing only damage information. To develop an algorithm specialized for port infrastructure, the algorithm was optimized through ground-truth coordinate pairs created using images of port infrastructure. The location errors obtained by applying this to the sample and concrete wall were (X: 6.5cm, Y: 1.3cm) and (X: 12.7cm, Y: 6.4cm), respectively. In addition, by applying the algorithm to the concrete wall and displaying it in the form of an exterior damage map, the possibility of field application was demonstrated.

The efficient data-driven solution to nonlinear continuum thermo-mechanics behavior of structural concrete panel reinforced by nanocomposites: Development of building construction in engineering

  • Hengbin Zheng;Wenjun Dai;Zeyu Wang;Adham E. Ragab
    • Advances in nano research
    • /
    • v.16 no.3
    • /
    • pp.231-249
    • /
    • 2024
  • When the amplitude of the vibrations is equivalent to that clearance, the vibrations for small amplitudes will really be significantly nonlinear. Nonlinearities will not be significant for amplitudes that are rather modest. Finally, nonlinearities will become crucial once again for big amplitudes. Therefore, the concrete panel system may experience a big amplitude in this work as a result of the high temperature. Based on the 3D modeling of the shell theory, the current work shows the influences of the von Kármán strain-displacement kinematic nonlinearity on the constitutive laws of the structure. The system's governing Equations in the nonlinear form are solved using Kronecker and Hadamard products, the discretization of Equations on the space domain, and Duffing-type Equations. Thermo-elasticity Equations. are used to represent the system's temperature. The harmonic solution technique for the displacement domain and the multiple-scale approach for the time domain are both covered in the section on solution procedures for solving nonlinear Equations. An effective data-driven solution is often utilized to predict how different systems would behave. The number of hidden layers and the learning rate are two hyperparameters for the network that are often chosen manually when required. Additionally, the data-driven method is offered for addressing the nonlinear vibration issue in order to reduce the computing cost of the current study. The conclusions of the present study may be validated by contrasting them with those of data-driven solutions and other published articles. The findings show that certain physical and geometrical characteristics have a significant effect on the existing concrete panel structure's susceptibility to temperature change and GPL weight fraction. For building construction industries, several useful recommendations for improving the thermo-mechanics' behavior of structural concrete panels are presented.

Multi-objective Generative Design Based on Outdoor Environmental Factors: An Educational Complex Design Case Study

  • Kamyar FATEMIFAR;Qinghao ZENG;Ali TAYEFEH-YARAGHBAFHA;Pardis PISHDAD
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.585-594
    • /
    • 2024
  • In recent years, the construction industry has rapidly adopted offsite-manufacturing and distributed construction methods. This change brings a variety of challenges requiring innovative solutions, such as the utilization of AI-driven and generative design. Numerous studies have explored the concept of multi-objective generative design with genetic algorithms in construction. However, this paper highlights the challenges and proposes a solution for combining generative design with distributed construction to address the need for agility in design. To achieve this goal, the research delves into the development of a multi-objective generative design optimization using a weighted genetic algorithm based on simulated annealing. The specific design case adopted is an educational complex. The proposed process strives for scalable economic viability, environmental comfort, and operational efficiency by optimizing modular configurations of architectural spaces, facilitating affordable, scalable, and optimized construction. Rhino-Grasshopper and Galapagos design tools are used to create a virtual environment capable of generating architectural configurations within defined boundaries. Optimization factors include adherence to urban regulations, acoustic comfort, and sunlight exposure. A normalized scoring approach is also presented to prioritize design preferences, enabling systematic and data-driven design decision-making. Building Information Modeling (BIM) tools are also used to transform the optimization results into tangible architectural elements and visualize the outcome. The resulting process contributes both to practice and academia. Practitioners in AEC industry could gain benefit through adopting and adapting its features with the unique characteristics of various construction projects while educators and future researchers can modify and enhance this process based on new requirements.

A Study on LoD1 Spatial Data Generation Using 2D Geospatial Data and CityGML Standard Texture Mapping Techniques (2D 공간정보 데이터를 활용한 LoD1 수준의 3D 객체 생성 및 CityGML 표준 기반 텍스처 적용 기법에 관한 연구)

  • Kim, Jeong-Yeon;Kang, Dong-Hwi;Lee, Hae-Ju;Choi, Gwang-Yeol
    • Journal of Cadastre & Land InformatiX
    • /
    • v.54 no.2
    • /
    • pp.97-109
    • /
    • 2024
  • This study presents a methodology for generating LoD1 objects using 2D spatial data in Shapefile format, converting them into CityGML 3.0 standard files, and applying textures for validation. High-resolution Z-values were extracted using DEM data, and a constrained Delaunay triangulation algorithm was applied to create LoD1 objects efficiently. Orthophoto TIF files were used as textures for these generated objects to achieve realistic visual representation. Finally, the CityGML 3.0 Validator tool was used to verify that the generated LoD1 models comply with the CityGML 3.0 standard. This research offers an efficient LoD1 object generation and texture application method that enhances visual realism, which can be beneficial for urban planning, disaster management, and smart city implementation.

Influence of Land Cover Map and Its Vegetation Emission Factor on Ozone Concentration Simulation (토지피복 지도와 식생 배출계수가 오존농도 모의에 미치는 영향)

  • Kyeongsu Kim;Seung-Jae Lee
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.25 no.1
    • /
    • pp.48-59
    • /
    • 2023
  • Ground-level ozone affects human health and plant growth. Ozone is produced by chemical reactions between oxides of nitrogen (NOx) and volatile organic compounds (VOCs) from anthropogenic and biogenic sources. In this study, two different land cover and emission factor datasets were input to the MEGAN v2.1 emission model to examine how these parameters contribute to the biogenic emissions and ozone production. Four input sensitivity scenarios (A, B, C and D) were generated from land cover and vegetation emission factors combination. The effects of BVOCs emissions by scenario were also investigated. From air quality modeling result using CAMx, maximum 1 hour ozone concentrations were estimated 62 ppb, 60 ppb, 68 ppb, 65 ppb, 55 ppb for scenarios A, B, C, D and E, respectively. For maximum 8 hour ozone concentration, 57 ppb, 56 ppb, 63 ppb, 60 ppb, and 53 ppb were estimated by scenario. The minimum difference by land cover was up to 25 ppb and by emission factor that was up to 35 ppb. From the modeling performance evaluation using ground ozone measurement over the six regions (East Seoul, West Seoul, Incheon, Namyangju, Wonju, and Daegu), the model performed well in terms of the correlation coefficient (0.6 to 0.82). For the 4 urban regions (East Seoul, West Seoul, Incheon, and Namyangju), ozone simulations were not quite sensitive to the change of BVOC emissions. For rural regions (Wonju and Daegu) , however, BVOC emission affected ozone concentration much more than previously mentioned regions, especially in case of scenario C. This implies the importance of biogenic emissions on ozone production over the sub-urban to rural regions.

Development of the Retrieval System of Information Flow for a Large-scale and Complex Construction Project using Information Transfer Relationship on Business Process (업무 정보전달관계를 이용한 대형복합건설사업의 정보흐름 색시스템 개발)

  • Shin, Jinho;Lee, Hyun-Soo;Park, Moonseo;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.84-93
    • /
    • 2012
  • The information generated from large and complex construction projects transfer and evolve in long-term business cycle. Therefore, while there is any problem, such as delay, the cause of the problem might relate to the previous business process rather than where it arises. However, for complex project players and business relationships, it is unsuitable to search an information flow using traditional retrieval methods. This research addresses a relationship-based information search system to analyze the information flow in large-scale and complex construction projects. First, we identified the components of the information retrieval system customizing for a large-scale complex construction projects, and then developed the inference algorithm which define the relationship between business processes. For the validation, we applied the system on a business information system of urban regeneration projects and suggested some application using information flow retrieval system for project players and project managers. Using the system, players are easy to prepare for their work process and managers can define the causal flow of the problem.

Performance Evaluation of the Runoff Reduction with Permeable Pavements using the SWMM Model (SWMM 분석을 통한 투수성 포장의 유출 저감 특성 평가)

  • Lin, Wuguang;Ryu, SungWoo;Park, Dae Geun;Lee, Jaehoon;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.11-18
    • /
    • 2015
  • PURPOSES: This study aims to evaluate the runoff reduction with permeable pavements using the SWMM analysis. METHODS: In this study, simulations were carried out using two different models, simple and complex, to evaluate the runoff reduction when an impermeable pavement is replaced with a permeable pavement. In the simple model, the target area for the analysis was grouped into four areas by the land use characteristics, using the statistical database. In the complex model, simulation was performed based on the data on the sewer and road network configuration of Yongsan-Gu Bogwang-Dong in Seoul, using the ArcGIS software. A scenario was created to investigate the hydro-performance of the permeable pavement based on the return period, runoff coefficient, and the area of permeable pavement that could be laid within one hour after rainfall. RESULTS : The simple modeling analysis results showed that, when an impervious pavement is replaced with a permeable pavement, the peak discharge reduced from $16.7m^3/s$ to $10.4m^3/s$. This represents a reduction of approximately 37.6%. The peak discharge from the whole basin showed a reduction of approximately 11.0%, and the quantity decreased from $52.9m^3/s$ to $47.2m^3/s$. The total flowoff reduced from $43,261m^3$ to $38,551m^3$, i.e., by approximately 10.9%. In the complex model, performed using the ArcGIS interpretation with fewer permeable pavements applicable, the return period and the runoff coefficient increased, and the total flowoff and peak discharge also increased. When the return period was set to 20 years, and a runoff coefficient of 0.05 was applied to all the roads, the total outflow reduced by $5195.7m^3$, and the ratio reduced to 11.7%. When the return period was increased from 20 years to 30 and 100 years, the total outflow reduction decreased from 11.7% to 8.0% and 5.1%, respectively. When a runoff coefficient of 0.5 was applied to all the roads under the return period of 20 years, the total outflow reduction was 10.8%; when the return period was increased to 30 and 100 years, the total outflow reduction decreased to 6.5% and 2.9%, respectively. However, unlike in the simple model, for all the cases in the complex model, the peak discharge reductions were less than 1%. CONCLUSIONS : Being one of the techniques for water circulation and runoff reduction, a high reduction for the small return period rainfall event of penetration was obtained by applying permeable pavements instead of impermeable pavement. With the SWMM analysis results, it was proved that changing to permeable pavement is one of the ways to effectively provide water circulation to various green infrastructure projects, and for stormwater management in urban watersheds.

Analysis of Visual Preference Factor for Youngsan River Scenery considering the Variation of River Stage (영산강 하천경관의 수위변화에 따른 시각적 선호요인 분석)

  • Yoo, Sang-Wan
    • Archives of design research
    • /
    • v.20 no.3 s.71
    • /
    • pp.141-150
    • /
    • 2007
  • This study began with the question: "what influence would the width of river surface have on visual preference, provided that the environment surrounding the river does not change?" to evaluate the visual preference factors of the river scenery which could vary according to the change of water level. To estimate the minimum flow needed for river sceneries, field survey of Youngsan river was carried out to collect the field data and evaluated the visual preference factors to obtain a most preferred W/B ratio. At Youngsan bridge location, the feeling of open space factors, physical characteristic factors and complexity factors appeared to have significant relations to visual preferences. At Imgok bridge location, complexity factors, aesthetic factors and physical characteristic factors have significance to visual preferences. As a result of multi regression modeling, it was found that physical factors affected visual preferences the most at urban river locations and complexity factors affected the most visual preferences at rural river locations. As a results of this study, the most preferred W/B ratio was estimated as which vary from 0.5 to 0.7 and this results can contribute to the field of river landscape design to maximize the users' satisfaction level.

  • PDF