The rainfall pattern analysis on time distribution characteristics of rainfall rates in important in determination of design flow for hydraulic structures, particularly in urban area drainage network system design. The historical data from about 400 storm samples during 31 years in Seoul have been used to investigate the time distribution of 5-minute rainfall in the warm season. Time distribution relations have been deveolped for heavy stroms over 20mm in total rainfall and represented by relation percentage of total storm rainfall to percentage of total storm time and grouping the data according to the quartile in which rainfall was heaviest. And also time distribution presented in probability terms to provide quantitative information on inter-strom variability. The resulted time distribution relations are applicable to construction of rainfall hyetograph of design storm for determination of design flow hydrograph and identification of rainfall pattern at given watershed area. They can be used in conjuction with informations on spatstorm models for hydrologic applications. It was found that second-quartile storms occurred most frequently and fourth-quartile storms most infrequently. The time distribution characteristics resulted in this study have been presented in graphic forms such as time distribution curves with probability in cumulative percent of storm-time and precipitation, and selected histograms for first, second, third, and fourth quartile stroms.
We study the basic theory and applicability of the WQUAL block in the FFC2Q model and the characteristics of non-point pollutant loads during the early stage of runoff. Study is also performed on selection of the values of the related parameters and their effect on the simulation results. FFC2Q simulation results are compared for verification with the measured data for three rainfall events in the Gunja Subbasin and found to be similar to the measured data in peak-flows, total runoff volumes, total loads, peak concentrations and times of peak concentration. This model thus shows results very close to those applying the SWMM and MOUSE models, even though it uses simplified input data. Related to rainfall distribution, under the condition of Huff 1st quartile distribution the pollutant loads occurred earlier than under other conditions, and in the early stage of rainfall the BOD and COD loads increased faster than the SS loads. The NPS loads were concentrated in the early stage of rainfall and finally reached total loads, so the rainfall after that could not contribute so much to the NPS loads.
Journal of the Korean Institute of Landscape Architecture
/
v.44
no.3
/
pp.65-78
/
2016
LID(Low-Impact Development) has received a great deal of attention in the field of urban water management. The spread of LID technologies as a natural drainage system has led to a rise in consideration of the applicability of policy in Korea. In this respect, the purpose of this study is to analyze experts' perception about utilization, applicability of policy, and improvements of LID by using Q-methodology. The sample included 31 experts who were government employees, landscape architects, researchers, and professors related to LID. All participants completed a 28-statement Q-sort task. Data was analyzed by using QUANL computer software. As a result of this study, four distinct experts' perceptions about LID are identified: Policy Enforcement Oriented Type, Expert Understanding Oriented Type, Manual Oriented Type, and Effectiveness Oriented Type. This study suggested appropriate directions related to LID technologies, and it is helpful to apply the domestic type's LID and increase the efficiency of LID in Korea. However, this study has a limit in which the viewpoint of the researcher intervenes: a complementary searcher is needed to verify the validity by type in policy decision-making.
The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.
Localized unprecedented torrential rain and heavy rainfall cause repeated damages and make it difficult to detect and predict the landslide caused by heavy rainfall. To analyze the landslide characteristics of Inje area this study used satellite images photographed after the occurrence of landslide caused by the typhoon Ewiniar occurred in July, 2006, and for GIS analysis purpose, interpreted the satellite images (SPOT5) visually to digitize into developing parts, water traveling parts and sediment parts. For analysis of spatial characteristics, landslide areas obtained from visual interpretation of digital map, 3rd & 4th forest vegetation maps and detailed soil map and grids were overlaid and analyzed. As a result, in regard to topographic features, landslide occurred at places, of which average slope is $26.34^{\circ}$, had south, south-east, south-west aspects and average altitude of 627m. From hydrological analysis, it was found out that water traveling area rapidly spread approaching water traveling area and sediment area. From forest type analysis, it was found out that landslide occurrence was high in pine woods, and in terms of girth class attribute, landslide occurred in small-sized woods, in which the crown occupancy of trees that have the diameter at breast height, 6~16cm, was greater than 50%. From the analysis of soil series, landslide areas constitute 37.85% of OdF and 37.35% of SmF, which had sandy loam soil and excellent drainage capacity. Through this study, landslides in Inje area were characterized and SPOT5 images of 2.5m resolution could be used. But there was a difficulty in determining water traveling parts adjacent to urban area.
This study proposes a new method for categorizing the hydrological soil groups by considering the recent revision results of soil series. Also, the proposed method is evaluated by comparing the categorizing result with those based on existing three different methods. As an example, the proposed method is applied to Jeju Island to estimate the CN value, which is then compared with CN values estimated by applying the existing three different methods. Summaries of the results are as follow. (1) The revision result since 2007 shows that the soil texture has been changed in the 43 soil series, the drainage class in the 1 soil series, the permeability in the 15 soil series, and the impermeable layer in the 26 soil series. (2) The categorizing result of hydrological soil groups by applying the proposed method shows that the group B is the most dominant group covering up to 49.25%. On the other hand, one of the existing method of 1987 provides the group C as the most dominant group (46.43%). Method of 1995 defines the group B as the most dominant group (27.69%). The other method of 2007 distinguishes the group D (35.82%) to be the most dominant group. (3) Also, the CN value estimated by applying the proposed method to Jeju Island is found to be smaller than those based on existing three methods. This result indicates the possible overestimation of the CN value when applying the existing three methods.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.29
no.4
/
pp.137-147
/
2011
This study aims to find out the construction process and planning characteristics of Suwon and Hwa-sung in 18th century from the point of water system. This study has an explanatory approach. The planning intents in the water system was driven out by analyzing various planning elements in relation to water system in the process of constructing Hwa-sung in 18th century. Using Entire Map of Hwa-sung, land registration map made in 1911 and topographic map of 1/10,000 scale made in 1917, water system and interpretation of spatial structure in Hwa-sung were analyzed. The results are as follows(Planning characteristics of the water system in Haw-sung in 18th century are as follows). Firstly, in determining the spatial structure and location of Hwa-sung, water system had an important role. Secondly, integrated drainage system was planned by the organization of natural and artificial water stream. Thirdly, the main street system and land use structure were planned in relation with water system. Fourthly, territoriality of main area was planned with water stream. Fifthly, ponds were constructed for flood control and they had important role as landscape elements. Sixthly, water stream was used as intentional BiBo element. As a result of the study, the weater system of Hwa-sung in 18th century was planned by the organization of natural and artificial water stream in relation with the location of new town and wide area's spatial structure, street system, land use structure, territoriality of main area, terriflood control, water quality protection, landscape, 비보 and urban daily life.
Journal of the Korean Society of Environmental Restoration Technology
/
v.25
no.3
/
pp.63-82
/
2022
The purpose of this study is to compare growth condition of landscape woody plants growing on the different ground structures in apartment complex. I chose Manseok Beach Town Complex 2, in Manseok-dong, Seo-gu, Incheon which has both natural and artificial ground as a subject site. Analysis of three phases of soil showed that artificial ground had average liquid phase of 30.89%, artificial ground mounding 33.88% and natural ground 24.40%. It means that artificial ground has higher water content than natural ground despite having same earthiness. It is believed that artificial ground is not as well drained as natural ground even though it is connected to the natural ground and has a deep soil depth because of mounding. Comparative study between woody plants on natural ground and those on artificial ground demonstrated that trees on natural ground grew 40.4% compared to those on artificial ground(0.875mm more) in terms of diameter growth. Average diameter growth of trees on natural ground was 3.040mm against 2.165mm for those on artificial ground. All 19 tree species which were measured for root diameter growth showed similar or higher growth on natural ground than on artificial ground. When it comes to growth of height, arborvitae showed highest growth on natural ground, followed by Thuja occidentalis, Pinus strobus, Magnolia denudata, Diospyros kaki and Aesculus turbinata. I measured branch growth and rate of leaf adherence of Pinus strobus. Average annual rate of branch growth of woody plants on natural ground was twice as high as those on artificial ground. I could conclude that ground structure influences branch growth of Pinus strobus. Statistics analysis of tree damage demonstrated significant result, meaning that there is a difference in the average damage rate depending on structure of ground. In order to validate growth difference by planting ground, I conducted T-Test of growth of diameter, root diameter, branch and height on woody plants growing on natural and artificial ground. As a result, it is believed that there is a difference in the growth of trees depending on the ground structure. Putting all these results together demonstrates that woody plants on natural ground generally grow better than those on artificial ground, which means ground structure does have an influence on the environment of growth of trees.
Sungyeol Lee;Wonjin Baek;Jinyoung Kim;Changsung Jeong;Jaemo Kang
Journal of the Korean GEO-environmental Society
/
v.25
no.6
/
pp.19-24
/
2024
Urban densification has necessitated the development of subterranean spaces such as subway networks and underground tunnels to facilitate the dispersal and movement of populations. Development of these underground spaces requires excavation from the ground surface, which can induce groundwater flow and potentially lead to ground subsidence and sinkholes, damaging structures. To mitigate these risks, it is essential to model groundwater flow prior to construction, analyze its characteristics, and predict potential groundwater discharge during excavation. In this study, we collected meteorological, topographical, and soil conditions data for the city of ○○, where tunnel construction was planned. Using the Visual MODFLOW program, we modeled the groundwater flow. Excavation sections were set as drainage points to monitor groundwater discharge during the excavation process, and the effectiveness of seepage control measures was assessed. The model was validated by comparing measured groundwater levels with those predicted by the model, yielding a coefficient of determination of 0.87. Our findings indicate that groundwater discharge is most significant at the beginning of the excavation. Additionally, the presence of seepage barriers was found to reduce groundwater discharge by approximately 59%.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.2
/
pp.56-63
/
2018
The management of Combined Sewer Overflows(CSOs) and Separated Sewer Overflows(SSOs) discharge directly to the effluent system in an untreated state, which occurs when the facility capacity is exceeded due to heavy rain, has become an important issue in recent years as the heavy rain becomes a regular phenomenon. Despite the continuous development of filtration technology, targeting densely populated urban areas, CSOs are rarely applied. Therefore, this study was carried out to optimize the process to apply CSOs in a pilot-scale horizontal flow filtration system with a rope-type synthetic fiber. The research was carried out in two steps: a preliminary study using artificial samples and a field study using sewage. In the preliminary study using an artificial sample, head loss of the filter media itself was analyzed to be approximately 1.1cm, and the head loss was increased by approximately 0.1cm as the linear velocity was increased by 10m/hr. In addition, the SS removal efficiency was stable at 81.4%, the filtration duration was maintained for more than 6 hours, and the average recovery rate of 98% was obtained by air backwashing only. In the on-site evaluation using sewage, the filtration duration was approximately 2 hours and the average removal efficiency of 83.9% was obtained when belt screen (over 450 mesh) was applied as a pre-treatment process to prevent the premature clogging of filter media. To apply the filtration process to CSOs and SSOs, it was concluded that the combination with the pre-treatment process was important to reinforce the hydraulic dimension for the stable maintain of operation period, rather than efficiency. Compared to the dry season, the quality of incoming sewage was lower in the rainy season, which was attributed to the characteristics of the drainage area with higher sanitary sewerage. In addition, the difference in removal efficiency according to the influent quality of the wet season and dry season was small.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.