• Title/Summary/Keyword: Unpredicted

Search Result 59, Processing Time 0.021 seconds

Collision prediction and detection in a dynamic environment (동적 환경하에서의 충돌 예측 및 감지)

  • 한인환;양우석
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.309-314
    • /
    • 1992
  • Many dynamic mechanical systems, such as parts-feeders, walking machines, and percussive power tools, are described by equations of motion which are discontinuous. The discontinuities result from kinematic constraint changes which are difficult to foresee, especially in presence of impact. A simulation algorithm for these types of systems must be able to algorithmically predict and detect the kinematic constraint changes without any prior knowledge of the system's motion. This paper presents a rule-based approach to the prediction and detection of kinematic constraint changes between bodies with arc and line boundaries. The developed algorithm's ability to accurately and automatically detect the unpredicted changes of kinematic constraints is demonstrated with a numerical example.

  • PDF

The Importance of Geotechnical Investigation Instructed by Failure (실패사례로 본 지반조사의 중요성)

  • Jung, Gyung-Ja;Lee, Doo-Haeng
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.761-774
    • /
    • 2009
  • To address the importance of geotechnical investigation, failure cases are taken up for consideration. One of them awaken this country to the importance of exact geotechnical investigation at the cost of many lives. Other failures were also occurred as the result of insufficient geotechnical investigation or missing some facts given by geotechnical investigation. A case which shows the unpredicted and unaccustomed settlement at bridge abutment introduced to emphasize the importance of exploring unknown nature of local soils.

  • PDF

Backward Path Following Using Pure Pursuit Guidance and Nonlinear Guidance for UUV under Strong Current (강한 역류가 발생했을 때 추적 유도법칙과 비선형 유도법칙을 활용한 무인잠수정의 후진 경로 추종)

  • Lee, Jooho;Kim, Nakwan
    • Journal of Ocean Engineering and Technology
    • /
    • v.30 no.1
    • /
    • pp.32-43
    • /
    • 2016
  • A UUV needs to have a robust path following performance because of unpredicted current disturbances. Because the desired path of a UUV is usually designed by considering the locations of obstacles or geographical features of the operation region, the UUV should stay on the desired path to avoid damage or loss of the vehicle. However, conventional path following methods cannot deal with strong countercurrent disturbances. Thus, the UUV may deviate from the desired path. In order to avoid such deviation, a backward path following method is suggested. This paper proposes a path following method that combines pure pursuit guidance and nonlinear guidance for the UUV under an unpredicted strong ocean current. For a stable path following system, this paper suggests that the UUV adjust its heading to the current direction using the pure pursuit guidance method when the system is in an unstable region, or the UUV follows the desired path with nonlinear guidance. By combining the pure pursuit guidance and nonlinear guidance, it was possible to overcome the drawbacks of each path following method in the reverse path following case. The efficiency of the proposed method is shown through simulation results compared to those of the pure pursuit method and nonlinear guidance method.

A Study on Cost Prediction of Highway Operating Risk through a Case Study of Power Failure (정전사고 사례분석을 통한 고속도로 운영 위험비용 산정에 대한 연구)

  • Kwon, Yong-Hoon;Kim, Kyong-Ju;Lim, Won-Seok;Park, Chan-Jin;Chae, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.78-90
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

The experimental study on the Evaluation of fire-proof performance and bond characteristics for development of 3hours Fire-Proof paint (3시간 내화도료의 개발을 위한 내화성능 및 부착특성 평가에 관한 실험적 연구)

  • Kim, Soo-Young;Kim, sung-kil;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.63-64
    • /
    • 2012
  • Recently, Fire-proof performance of buildings becomes important to ensure safety. As a result, fire-proof paint is required for 3 hours. However, Experiments are only performed by standard KS F 2271 for estimation of fire-proof paint. Because there is no domestic estimation standard for performance of fire-proof paint as well. So estimation standard of fire-proof paint is needed to guarantee their performance for establishing quality system and to assure same performance for safety of people in the building from unpredicted fire accident. Owing to these reasons, we studied comparative estimation for quality performance of two kinds of fire-proof paint and bond performance.

  • PDF

A Study on Compensation Method for Variable Loads in Electro-Hydraulic Servomechanism Using Load Pressure feedback (부하압력 피이드백을 이용한 전기-유압 서어보계의 부하변동 보상에 관한 연구)

  • Kim, Jong-Kyum;Lee, Jin-Kul
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.7 no.3
    • /
    • pp.83-93
    • /
    • 1990
  • The characteristics of servo systems are desired to be independent for any unpredicted operational condition. The relation between input current and output flowrate of the servovalve is dependent on the load pressure and the idea of compensation using the load pressure feedback is fundamental theory in this paper. With this idea, this paper researches the performance improvement of hydraulic position control system. Static characteristics of compensated system is analyzed by means of analog computer simulation, digital computer simulation and experiment for nonlinear model and linearized model, respectively.

  • PDF

Study on Rock classification of Rock Socketed Drilled Shaft (현장타설말뚝의 암반 근입부 암판정 사례연구)

  • Park, Woan-Suh;Yoo, Jai-Hyun;Lee, Woo-Cheol;Joo, Yong-Sun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.658-663
    • /
    • 2010
  • Recently the most of deep foundation were socketed into weathered rock or soft rock to carry large foundation loads. The end bearing behavior of piles socketed in rock is generally dependent on the rock mass conditions with discontinuities and rock strength. Therefore, it is very important that the estimating rock classification with relation of TCR, RQD and unpredicted rock condition. In this study, the construction failure example of drilled shaft due to mistaking to estimate the rock classification on penetration were analyzed in site, so we hope to discuss problems of determining the rock socketed length of drilled shaft on construction.

  • PDF

An Experimental Study on Flexural Adhesive Performance of RC Beams Strengthened by Carbon Fiber Sheets (탄소섬유쉬트로 보강된 RC보의 휨 부착성능에 관한 실험적 연구)

  • 최기선;류화성;최근도;이한승;유영찬;김긍환
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.997-1002
    • /
    • 2001
  • Tensile strength of CFRP (Carbon Fiber Reinforced Polymer) is approximately 10 times higher than that steel reinforcement, but the design strength of CFRP is normally reduced by the bond failure between RC and CFRP. Many researches have been carried out, concerned with bond behavior between RC and CFRP to prevent the unpredicted bond failure of RC beam strengthened by CFRP, but the national design code for design bond strength of CFRP hasn't been constructed. In this study, 3 beams specimen strengthened by CFRP under the variable of bonded length were tested to derive the design bond strength of CFRP to the RC flexural members. Also 2 beams specimen strengthened by CFRP were tested to inspect the construction environment effects such as mixing error of epoxy resin and the amount of primer epoxy resin. From the test results, It is concluded that the maximum design bond strength of CFRP to RC flexural member is considered to be $\tau_{a}$=8kgf/$cm^{2}$.

  • PDF

Seismic performance of reinforced concrete shear wall buildings with underground stories

  • Saad, George;Najjar, Shadi;Saddik, Freddy
    • Earthquakes and Structures
    • /
    • v.10 no.4
    • /
    • pp.965-988
    • /
    • 2016
  • This paper investigates the seismic behavior of reinforced concrete shear wall buildings with multiple underground stories. A base-case where the buildings are modeled with a fixed condition at ground level is adopted, and then the number of basements is incrementally increased to evaluate changes in performance. Two subsurface site conditions, corresponding to very dense sands and medium dense sands, are used for the analysis. In addition, three ground shaking levels are used in the study. Results of the study indicated that while the common design practice of cropping the structure at the ground surface leads to conservative estimation of the base shear for taller and less rigid structures; it results in unpredicted and nonconservative trends for shorter and stiffer structures.