• Title/Summary/Keyword: University facility size

Search Result 349, Processing Time 0.022 seconds

Electric Field Strength and Shielding Effectiveness Comparison According to the Size of Shielding Facility (방호 시설 크기에 따른 전계강도 및 차폐 효과 비교)

  • Kang, Ho-Jae;Huh, Chang-Su;Bang, Jeong-Ju;Choi, Jin-Su;Park, Woo-Chul
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.27 no.4
    • /
    • pp.221-225
    • /
    • 2014
  • In modern times, threat of high power electromagnetic wave is increasing. When the electrical grid and communication network are attacked by these high power electromagnetic wave, the whole infrastructure is paralyzed. To protect the infrastructure from these high power electromagnetic wave threat, the shielding facility that can block high power electromagnetic wave is constructed. Also shielding effectiveness evaluation about the constructed facility is important. But, because of space efficiency and saving of construction cost to construct the actual shielding facility, the shielding room wall is generally adjacent to exterior concrete structures. As space between shielding facility wall and concrete structures is very small, arranging the transmitting antenna exterior shielding facility is realistically difficult. Therefore, in this research, The shielding effectiveness measurement plan in the state of exterior narrow space of HEMP shielding facility is presented. And to apply this plan, The influence of shielding effectiveness according to the size of the shielding facility is analyzed.

Optimal Production Capacity and Outsourcing Production Planning for Production Facility Producing Multi-Products (다제품을 생산하는 생산설비에 대해 최적 생산용량과 외주생산계획)

  • Chang, Suk-Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.4
    • /
    • pp.110-117
    • /
    • 2012
  • The demand for facility used in producing multi-products is changed dynamically for discrete and finite time periods. The excess or the shortage for facility is occurred according to difference of the facility capacity size and demand for facility through given time periods. The shortage facility is met through the outsourcing production. The excess facility cost is considered for the periods that the facility capacity is greater than the demand for the facility, and the outsourcing production cost is considered for the periods that the demand for facility is greater than the facility capacity. This paper addresses to determine the facility capacity size, outsourcing production products and amount that minimizes the sum of the facility capacity cost, the excess facility cost and the outsourcing production cost. The characteristics of the optimal solution are analyzed, and an algorithm applying them is developed. A numerical example is shown to explain the problem.

A Study to define the range of sample size for setting Intensive Care Unit(ICU) facility guidelines - Focused on analysis of guidelines and present of ICUs facilities by general hospitals size (중환자실 시설기준 작성을 위한 기본시설 수준 설정 연구 - 국내·외 시설기준 및 국내 종합병원 병상규모 별 시설 현황분석을 기초로 하여)

  • Yoon, Hyung Jin;Cho, Jun Young
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.3
    • /
    • pp.47-56
    • /
    • 2017
  • Purpose : This study is a basic research to establish guidelines for healthcare facility in Korean healthcare market. As a first step, it is a main purpose for making beginning point of ICU guideline to set a basic level of ICU facility size and quality by analysis current ICU facilities and existed domestic guidelines : law, criteria of healthcare insurance review and assessment service, credit of Korea institute for healthcare accreditation. Methods : First of all, the all requirements of existed guidelines are put together and summarized. The summary is compared with that of US, UK, and Australia to know its quality difference with international market. In addition, all hospitals in Korean market are classified based on total bed number and ICU bed number to know the most occupied facility size range in the market. Second of all, by comparing 15 ICUs' current setting of the public general hospital, a general condition of ICU facility would be extracted based on function, floor area per bed, services Results : 72.8% of hospitals in Korea are belonging below 500 beds hospital. Among them 200-299 beds hospitals occupied 35.3% and are shown as the most occupied hospital size. As 15 public general hospitals are analyzed, it is clear that the more bed size and services the more ICU area per bed. As a result it is sure that the 300~500 bed may be a clear line as a general ICU condition whose function and bed number relatively consistent in the range. Implications : to keep the qualified medical environment and contemporary hospital trend, the guideline as a minimum requirement keep naturally out from current healthcare settings and should reflect their limit to reconcile with the new trend in the market.

Development of Dome-Type Cold Storage Facility Using 3-D CFD Simulation (3차원 CFD 시뮬레이션을 이용한 돔형 저온저장고 개발)

  • 양길모;고학균;홍지향
    • Journal of Biosystems Engineering
    • /
    • v.28 no.1
    • /
    • pp.35-44
    • /
    • 2003
  • This study was conducted to develop proper model for cold storage facility that could of for uniform heat movement and air movement f3r green grocery and improve improper design of the existing container-type cold storage facility. For that reason, new model(dome-type) cold storage facility was developed using 3-D CFD(computational fluid dynamics) simulation. The size was 6m${\times}$6m${\times}$5m. Its size and configuration were same to simulation model. Unit cooler was designed to send cold air in 4 side ways. A dome-type cold storage facility showed uniform distributions of air temperature and velocity because cold air was forced to move down along the ceiling and the wall and then circulated to the unit cooler from the central part of the floor. Dome-type cold storage facility also showed by low wind velocity, below 1 m/s that could minimized cold damage and quality deterioration.

The Effects of Emotional Labor and Job Satisfaction on Organizational Commitment in Staffs by the Size of Facility (요양시설 규모에 따른 직원의 감정노동, 직무만족이 조직몰입에 미치는 영향)

  • Jang, Hye-Young;Song, Eun-Ok;Suh, Yujin
    • Research in Community and Public Health Nursing
    • /
    • v.31 no.1
    • /
    • pp.1-12
    • /
    • 2020
  • Purpose: The purpose of this study was to identify the factors influencing organizational commitment of staffs according to the size of long-term care facility. Methods: A cross-sectional descriptive study was designed. Data collection was conducted for a total of 315 employees in long-term care facilities located in Seoul, Gyeonggi, Gangwon, Gyeongbuk, and Chungnam. Data were collected from July 2018 to October 2018 using questionnaires which included emotional labor, job satisfaction, organizational commitment, and general characteristics. In order to confirm the differences in the size of the facility, the facilities with less than 30 beds, those with 30-99 beds, and those with more than 100 beds were analyzed. Data were analyzed using descriptive statistics, t-test, ANOVA, Mann-Whitney U test, Kruskal-Wallis H test, Pearson's correlation analysis, and multiple regression. Results: The job satisfaction and organizational commitment were significantly different according to the size of long-term care facility. Organizational commitment was influenced by 'external job satisfaction' in less than 30 beds, was influenced by 'external job satisfaction, and attentiveness to required display rules of emotional labor' in 30~99 beds, and then was influenced by 'type of job, and internal job satisfaction' in more than 100 beds. The predict variables accounted for 23.0%, 41.0%, and 34.0% of organizational commitment respectively. Conclusion: These findings show that tailored interventions should be provided depending on the size of facility in order to increase organizational commitment. In addition, organizational commitment programs should be developed by considering strategies to reduce the emotional labor and to increase job satisfaction.

A Study on the Application of Natural Zeolite as Coagulant Aid for Effluent Quality Improvement in Private Sewage Treatment Facility (개인하수처리시설 처리수의 수질 개선을 위한 응집보조제로서의 천연제올라이트 적용에 관한 연구)

  • Choi, Jung Su;Joo, Hyun Jong
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.121-128
    • /
    • 2012
  • The purpose of this study is to solve the problem of nutrient removal due to rapid hydraulic retention time (HRT) variation in small size private sewage treatment facility and to have better effluent quality by using natural zeolite as a coagulant aid. The experiments were conducted by applying different conditions of HRT, coagulant, and zeolite dosages. As an experimental result, $TBOD_{5}$, TSS, and TP removal efficiencies were 64.9%, 94.5%, and 98.8% at co-injection with zeolite. Overall removal efficiencies of $TBOD_{5}$, TSS, and TP have improved 15.7, 28.7, 6.1%, respectively. This result shows that zeolite addition could improve flocculation, increase setting velocity, and thus have better treatment. Therefore the use of zeolite as a coagulant aid can be useful in small size private sewage treatment facility, where especially extra nutrient removal is required to meet the legal standard for discharge.

A Study on Facility Layout for Optimamization of Material Flow System (물류시스템 최적화를 위한 설비배치에 관한 연구)

  • Park, Se-Joon;Lee, Young-Hae;Hur, Sun;Lee, Moon-Hwan;Yu, Ji-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

Evaluation of Separation Distance from the Temporary Storage Facility for Decontamination Waste to Ensure Public Radiological Safety after Fukushima Nuclear Power Plant Accident (후쿠시마 원전 사고 이후 일반인의 방사선학적 안전성 확보를 위한 제염폐기물 임시저장시설 이격거리 평가)

  • Kim, Min Jun;Go, A Ra;Kim, Kwang Pyo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.3
    • /
    • pp.201-209
    • /
    • 2016
  • The object of this study was to evaluate the separation distance from a temporary storage facility satisfying the dose criteria. The calculation of ambient dose rates took into account cover soil thickness, facility size, and facility type by using MCNPX code. Shielding effects of cover soil were 68.9%, 96.9% and 99.7% at 10 cm, 30 cm and 50 cm respectively. The on-ground type of storage facility had the highest ambient dose rate, followed by the semi-ground type and the underground type. The ambient dose rate did not vary with facility size (except $5{\times}5{\times}2m\;size$) due to the self-shielding of decontamination waste in temporary storage. The separation distances without cover soil for a $50{\times}50{\times}2m\;size$ facility were evaluated as 14 m (minimum radioactivity concentration), 33 m (most probably radioactivity concentration), and 57 m (maximum radioactivity concentration) for on-ground storage type, 9 m, 24 m, and 45 m for semi-underground storage type, and 6 m, 16 m, and 31 m for underground storage type.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Cut tree approach for facility layout problem

  • Kim, Chae-Bogk
    • Korean Management Science Review
    • /
    • v.11 no.3
    • /
    • pp.55-65
    • /
    • 1994
  • Given the flow matrix, plant size and department sizes, the algorithms in this paper provide the layout with rectilinear distance. To construct automated facility design, cut tree approach is employed. A branch and bound computer code developed by Tillinghast is modifided to find the feasible fits of departments without shape distortion in the plant rectangle.

  • PDF