• 제목/요약/키워드: University building planning

검색결과 898건 처리시간 0.027초

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

좌식공간관습의 건축사적 함의 - 신발의 문제를 중심으로 - (The Architectural Meaning of the Floor-Sitting Culture in Korea - Focused on the Matter of Shoes -)

  • 조재모
    • 건축역사연구
    • /
    • 제21권1호
    • /
    • pp.83-98
    • /
    • 2012
  • The starting point of this study is the concerning of simple behavioral pattern that whoever enters the inner space with taking off his shoes should go out from the position where he laid his shoes. The using of Ondol (floor heating room) and Maru (lifted wood floor) had changed the architectural space from chair-sitting to floor-sitting space, and it also made the behavior of taking off the shoes at the entrance of building and stepping on the lifted floor. This simple behavior has possibility to make lots of changes to the culture of architectural design. With this noticeable point, this paper is talking about the cultural feature of Korean traditional architecture, especially about the influence of tanking off and putting on shoes. The matter of shoes has changed diverse aspects of building and layout planning. It maximized the difference between front and rear part of building and characterized the lateral extension of Korean traditional house. The ritual space also had evolved from chair-sitting to floor-sitting space according to the type of ritual behavioral pattern. The change on the single building level had influenced on the layout planning of architectural complex. For examples, the parallel layout of ChangDeok-gung palace and the long sequential process to the main pavilion of Buddhist temple are the result of the matter of shoes. And NuGak(樓閣), the double-storied pavilion, on the axis of entering sequence's node is one of the unique planning elements that makes possible to go through the building without taking off the shoes and also makes upper level space for staying. In short, Korean traditional architecture that has the chair-sitting spatial origin of the East Asian cultural sphere has pursued new architectural issues and planning methods according to evolution to the floor-sitting culture.

농촌지역 빈집 활용 마을만들기 추진과정에서 NPO의 역할 - 일본 NPO법인오노미치빈집재생프로젝트 사례로 - (Roles of NPO at Community-Building Project by Using Rural Vacant Houses - Focused on 'Vacant House Recreation Project of Japan's NPO Corporation' in Onomichi, Hiroshima)

  • 우정범;손용훈
    • 농촌계획
    • /
    • 제20권4호
    • /
    • pp.1-12
    • /
    • 2014
  • This study has analyzed overseas projects of building rural communities using vacant houses. It is aimed at identifying the roles of NPO in the community-building projects and providing implications applicable to Korea. In recent years, there has been a spike in the number of vacant houses in rural areas. It is due to rapid urbanization and uneven distribution of the population across the country. Those are the reasons that prompted community-building projects. To solve the vacant house issue, there has been rising interest in building communities through vacant houses as rural resources and effectively integrating them as useful resources. However, the roles of key entity that pursues community-building projects using vacant houses have not been discussed sufficiently. Thus, this study deals with the 'Vacant House Recreation Project of NPO Corporation in Onomichi' in Hiroshima, Japan. Through the case study, the following are introduced as NPO's roles in community-building projects using vacant houses. First, pursuing promotion and attracting attention by making the utilization of vacant houses sensational; system improvement; offering information. Second, enhancing the perception of local residents by offering local services using vacant houses; offering community-building items. Third, forming a place of public discussion to solve conflicts during community-building projects using vacant houses; offering alternatives to building communities. Above all, such roles have led to the key status of NPO during its community-building projects using vacant houses. It offers the following implication for Korea: Future vacant house-related policies for rural revitalization should be done from community-building standpoint and include establishing the roles of NPO.

공동주택단지의 개발계획단계 시 에너지 수요예측 프로세스에 관한 연구 (A Study on the Process of Energy Demand Prediction of Multi-Family Housing Complex in the Urban Planning Stage)

  • 문선혜;허정호
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2008년도 춘계학술발표대회 논문집
    • /
    • pp.304-310
    • /
    • 2008
  • Currently energy use planning council system is mandatory especially for the urban development project planned on a specified scale or more. The goal of existing demand prediction was to calculate the maximum load by multiplying energy load per unit area by building size. The result of this method may be exaggerated and has a limit in the information of period load. The paper suggests a new forecasting process based on standard unit household in order to upgrade the limit in demand prediction method of multi-family housing complex. The new process was verified by comparing actual using amount of multi-family housing complex to forecasting value of energy use plan.

  • PDF

Optimizing Laser Scanner Selection and Installation through 3D Simulation-Based Planning - Focusing on Displacement Measurements of Retaining Wall Structures in Small-scale Buildings -

  • Lee, Gil-yong;Kim, Jun-Sang;Yoou, Geon hee;Kim, Young Suk
    • 한국건설관리학회논문집
    • /
    • 제25권3호
    • /
    • pp.68-82
    • /
    • 2024
  • The planning stage of laser scanning is crucial for acquiring high-quality 3D source data. It involves assessing the target space's environment and formulating an effective measurement strategy. However, existing practices often overlook on-site conditions, with decisions on scanner deployment and scanning locations relying heavily on the operators' experience. This approach has resulted in frequent modifications to scanning locations and diminished 3D data quality. Previous research has explored the selection of optimal scanner locations and conducted preliminary reviews through simulation, but these methods have significant drawbacks. They fail to consider scanner inaccuracies, do not support the use of multiple scanners, rely on less accurate 2D drawings, and require specialized knowledge in 3D modeling and programming. This study introduces an optimization technique for laser scanning planning using 3D simulation to address these issues. By evaluating the accuracy of scan data from various laser scanners and their positioning for scanning a retaining wall structure in a small-scale building, this method aids in refining the laser scanning plan. It enhances the decision-making process for end-users by ensuring data quality and reducing the need for plan adjustments during the planning phase.

Prediction of pressure equalization performance of rainscreen walls

  • Kumar, K. Suresh;van Schijndel, A.W.M.
    • Wind and Structures
    • /
    • 제2권4호
    • /
    • pp.325-345
    • /
    • 1999
  • In recent years, rainscreen walls based on the pressure equalization principle are often used in building construction. To improve the understanding of the influence of several design parameters on the pressure equalization performance of such wall systems, a theoretical consideration of the problem may be more appropriate. On this basis, this paper presents two theoretical models, one based on mass balance and the other based on the Helmholtz resonator theory, for the prediction of cavity pressure in rigid rainscreen walls. New measures to assess the degree of pressure equalization of rainscreen walls are also suggested. The results show that the model based on mass balance is sufficiently accurate and efficient in predicting the cavity pressure variations. Further, the performance of the proposed model is evaluated utilizing the data obtained from full-scale tests and the results are discussed in detail.

친환경건축물인증 아파트의 친환경계획요소 관리 실태 (A Study on the Management of Environmentally Friendly Planning Features in Condominiums with Green Building Certification)

  • 석희진;홍형옥
    • 대한가정학회지
    • /
    • 제49권1호
    • /
    • pp.41-53
    • /
    • 2011
  • The purpose of this paper was to examine the management of Environmentally Friendly Planning Features(EFPF) in condominium with Green Building Certification(GBC). A questionnaire survey was conducted among management office staff and residents on six housing estates in Seoul. The data from 200 respondents were analysed using descriptive statistics and t-tests. The main findings were as followings : 1) Most of the staffs considered that garbage collection and recycling, and green spaces were well-managed. 2) The residents indicated that garbage collection and recycling, and green spaces were properly handled, but they failed to recognize these as EFPF. 3) Residency duration was unrelated to the residents' perceptions of the EFPF and their management. In conclusion, neither the residents nor the staff were aware of the GBC system or that their housing estates were built using EFPF. To remedy this, it can be assumed the residents' lack of appreciation of the EFPF can be resolved if they participate in the management of these features. So the residents will need education, and the management staff will require professional training.

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Information Strategy Planning for Digital Infrastructure Building with Geo-based Nonrenewable Resources Information in Korea: Conceptual Modeling Units

  • Chi, Kwang-Hoon;Yeon, Young-Kwang;Park, No-Wook;Lee, Ki-Won
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2002년도 Proceedings of International Symposium on Remote Sensing
    • /
    • pp.191-196
    • /
    • 2002
  • From this year, KIGAM, one of Korean government-supported research institutes, has started new national program for digital geologic/natural resources infrastructure building. The goal of this program is to prepare digitally oriented infrastructure for practical digital database building, management, and public services of numerous types of paper maps related to geo-scientific resources or geologic thematic map sets: hydro-geologic map, applied geologic map, geo-chemical map, airborne radiometric/magnetic map, coal geologic map and off-shelf bathymetry map and so forth. As for digital infrastructure, several research issues in this topic are composed of: ISP (Information Strategy Planning), geo-framework modeling of each map set, pilot database building, cyber geo-mineral directory service system, and web based geologic information retrieval system upgrade which services Korean digital geologic maps scaled 1:50K. In this study, UML (Unified Modeling Language)-based data modeling of geo-data sets by and in KIGAM, among them, is mainly discussed, and its results are also presented in the viewpoint of digital geo-modeling ISP. It is expected this model is further progressed with the purpose of being a guidance or framework modeling for geologic thematic mapping and practical database building, as well as other types of national thematic map database building.

  • PDF