Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.1
/
pp.214-219
/
2010
In diverse professional fields including information and communication field, there is huge gap between required practical ability in industrial and that of graduated students actually learn in university. In this paper, we propose collaborative project curriculum applied to project-based learning in order to train affordable specialists who have a systematic problem-solving ability in industrial site. Applying this curriculum to The Cultural Technology Education Center of Jeju National University, we confirm that our curriculum improves ability of students to perform team project systematically such as skills in paper writing, presentation speech, problem solving, and collaborative work. Students are also reported high satisfaction about the proposed curriculum. Therefore, we expect that our curriculum will successfully be applied to other fields.
The main purpose of this study is to explore a way of fisheries cooperation through the ODA demand survey in the fisheries sector on 8 ASEAN countries. In detail, we identified the status of detailed cooperation in the fisheries sector with ASEAN countries and identified new cooperation network construction projects in accordance with the changes in external cooperation environment, and presented strategies and policy directions for fisheries cooperation projects. For this purpose, we surveyed the questionnaires of 8 ASEAN countries using structured questionnaires for local fisheries experts. As a result of the questionnaire analysis, eight ASEAN countries were classified into three groups according to DAC beneficiary standards and suggested implications. Based on the results of the survey, the basic direction of the fisheries cooperation projects in each of the eight countries surveyed was set up, and the preferred projects for fisheries cooperation projects were proposed by dividing them into groups. In addition, the research results were used to systematically establish national promotion plans.
Supply chain management for complex project requires continuous integration activities with the suppliers and subcontractors. This study proposes the firm performances, trust, relational norms, interfirm conflict and cooperation as major research variables, and collected the survey responses from the suppliers and subcontractors having experiences with complex projects. The statistical results indicate that the cooperation and conflict influence the firm performances, and that the inter-firm trust have some impact on the level of cooperation and conflict. It was also found that the inter-firm cooperation is influenced by relational norm. But on the contrary to our expectation, the relational norm has no significant impact on the inter-firm conflict. These findings may offer the significant implications leading to successful implementation of collaborative supply chain management in the context of project engineering area.
VO, Khoa Dang;NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
The Journal of Asian Finance, Economics and Business
/
v.7
no.8
/
pp.635-644
/
2020
The construction industry in developing countries like Vietnam, which incorporates small and medium construction enterprises, is typically more prone to disputes and contract dispute-related lawsuits. A dispute may occur at any time in the life cycle of the project. It is sometimes solved with the intermediation of a lawyer or directly by stakeholders. Understanding the causes of disputes in a construction project not only improves the efficiency of a company but also increases the success of projects. This study was carried out using a questionnaire survey at construction projects in Ho Chi Minh City. Sample data with 117 observations were analyzed to find the disputing factors in construction projects: diversity of working style among the parties; reluctance to work; and poor teamwork. Correlation coefficient on a rank of factors between design consultant and contractor; Design consultant and project owners are positively correlated. The Exploratory Factor Analysis (EFA) analysis identified six groups of factors in construction disputes: cooperation, technology, economics, productivity, information, and behavior. The findings are useful for enterprise practice and provide participants with an overview of sources of dispute. Thus, a more complete risk management plan can be formulated, which will accelerate project progress and improve the likelihood of success.
It is very important to educate students who can be working professionals in contents-related field. This paper discusses three types of contents academic-industrial cooperation projects which are contents technology, contents software and education, and contents-making projects. Regarding third type, this paper explains two examples of contents-making projects that Daejeon University's Animation Department did. First one is Miznco Co.'s in 2015 and second one is which exhibition is held in old provincial of Chung-nam and Skyroad[1] at Daejeon in 2016. This exhibition is held for reviving old town area of Daejeon which is called one-do-sim through great contents. This paper also proposes what contents-related department in each university has to do to survive in tough period.
Park, Chulho;Han, Joon;Ku, Jisun;Lee, Sanghoon;Lee, Hakyeon
Journal of Korean Institute of Industrial Engineers
/
v.43
no.1
/
pp.49-61
/
2017
This paper proposes an R&D project selection methodology for green technology centered on developing country-oriented technology commercialization. Eight selection criteria are derived from the R&BD logic model : technology needs of developing countries, effectiveness of green technology, technological potentials, domestic technological capability, commercialization feasibility, economic benefits, business feasibility, and spillover effects of developing countries. 21 qualitative and quantitative indicators are then defined for each criterion. The analytic hierarchy process is conducted to produce relative importance of evaluation indicators and to set final priority scores of R&D project candidates. The working of the proposed methodology is provided with the help of a case study example of Green Technology Center. The proposed methodology is expected to be effectively utilized for policy practices of R&D project selection in the field of green technology.
Purpose - This study aims to clarify through which process asset specificity and supplier development project (SDP) affect performance. Cooperation, partnership, the level of information exchange, and the importance of information sharing are considered significant variables as mediators related to the process. Finally, the performance formation model of the supply chain through asset specificity and supplier development project would be suggested as being a result of this study. Research design, data, and methodology - Data collection was as follows: questionnaires were distributed to 250 companies that have business ties with H Company. The empirical study to test our hypothesis was based on statistical analysis (using SPSS 19.0 and AMOS 19.0). The hypothesis of this paper is that the asset specificity and supplier development project variables have positive effects on the following variables: mediators such as cooperation and partnership (reliability and dependence); and the cooperation and partnership variables have a positive effect on the following variables: level of information sharing, the importance of information sharing, and level of information sharing; the importance of information sharing has a positive effect on supply chain performance. We tested our hypothesized model utilizing path analysis with latent variables. Results - First, it was found that asset specificity has significant positive effects on cooperation (H1), reliability (H2), and dependability (H3). Second, it was proved that the level of comprehension on the purpose of SDP has positive effects significantly on cooperation (H4), reliability (H5), and dependability (H6). Third, the hypotheses related to cooperation were all significantly accepted. The relationships of cooperation with the level (H7) and importance (H8) of information sharing were significant. Fourth, the hypotheses related to reliability were all significantly accepted. The relationships of reliability with the level (H9) and importance (H10) of information sharing were significant. In terms of dependability, however, the hypotheses were partially accepted. The effect of dependability was significant on the importance of information sharing (H12), but insignificant on the level of information sharing (H11). Finally, the causal relationships from the level of information sharing to SCM performance (H13) and from the importance of information sharing to SCM performance (H14) were both significantly accepted. Conclusion - First, with rapid changes in the business environment, enterprises should acquire the right information to properly implement SCM. For successful SCM, firms should understand the supplier development project. Second, asset specificity and the level of comprehension on SDP have significant effects both on cooperation and partnership (reliability and dependability). Third, mediators such as cooperation, reliability, and dependability significantly affect the level and importance of information sharing. Fourth, the level and importance of information sharing have significant impacts on SCM performance. This paper makes a meaningful contribution to further the understanding of how SDP affects SCM performance. Finally, successful SCM performance is achieved by information sharing through a collaborative environment and partnership (confidence & dependence) rather than by investing only in setting up an information system.
Journal of the Korea Academia-Industrial cooperation Society
/
v.13
no.12
/
pp.5721-5727
/
2012
In this study, we examine the effect of customers's participation and satisfaction on performance of IT project. This study collected data from the project team members of the next-generation internet banking project in K Bank. We found that customers's participation has positive effect on their satisfaction of IT project and the satisfaction also has a positive influence on performance of IT project. Implications and directions for future research are discussed.
This study examines the effects of participation purpose, corporate readiness, and acceptance of changes that may occur in the course of expert guidance on the performance of smart factory. For this study, 129 questionnaires obtained from SMEs participating in the Smart Meister support project were used, and SPSS 18.0 and the AMOS 18.0 program were used for statistical processing for empirical analysis of the hypotheses test. It was found that the company's business participation motivation and readiness status had a significant effect on the acceptance and cooperation of changes that occurred during the consulting process. In addition, the acceptance and cooperation of changes within the company had a significant effect on the satisfaction with the Meister support project and the financial performance. Companies participating in the Meister support project need to clarify their motives for participating in the project and make stable corporate readiness in advance. In addition, based on the CEO's support, it is necessary to have a motivational program and to build an organizational culture that can actively accept innovation.
This study is the evaluation of the 'Tunak forest recreation and ecotourism development project' which will be completed in 2018 with sole source of funding from Korea. A survey was conducted to evaluate the status of the project being carried out in Lombok island, Indonesia, through the evaluation principles and criteria of the OECD Development Assistance Committee (DAC). Survey participants were stakeholders of the Official Development Assistance (ODA) project and local residents. Overall, the respondents had a good impression of this ODA project and expected they would contribute to the development of their community and region. However, respondents were not well aware of the ODA project being carried out in the Tunak region and thus more efforts should be made to help the local residents understand the positive outcome of the project and to promote the ongoing cooperation between Korea and Indonesia in the forestry sector. Results of this study showed that the projects have been effectively carried out and the impact of the project was well perceived by the recipient country. In addition, this positive perception of Korea is expected to help recreation and ecotourism business progress in the region. Therefore, we believe that the project should continue to be carried-out in the future and we expect that related companies will be able to operate on its own eventually. As it is difficult to evaluate the outcome of an ongoing project precisely, this study should be conducted again after the project completion and the results can be compared to the present results so that the effectiveness of ODA project can be more accurately determined.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.