• Title/Summary/Keyword: Unit production cost

Search Result 308, Processing Time 0.023 seconds

A Study on Application of Learning Loss at Labor Cost Calculation in Case of Production Break Occurrence (방산원가 노무비 산정시 생산중단에 의한 학습손실 적용방안 연구)

  • Moon, Keong-Min;Lee, Yong-Bok;Kang, Sung-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.2
    • /
    • pp.1-10
    • /
    • 2010
  • Learning rate is generally applied to estimate an appropriate production labor cost. Learning effect is obtained from repetitive work during the production period under 3 assumptions ; homogeneous production, same producer, quantity measure in continuous unit. However, production breaks occur frequently in Korean defense industry environment because of budget constraint and annual requirements. In this case previous learning effect can not be applied due to learning loss. This paper proposed the application of learning rate when a production break occurs in Korea defense industry. To obtain a learning loss, we surveyed various learning loss factors for different production breaks(6, 12, 18 months) from 4 defense industry companies. Then, we estimate the first unit labor hours in re-production phase after production break using Anderlohr method and Retrograde method with the result of the survey. This work is the first attempt to show a method which defines and evaluates the learning loss factors in Korean defense industry environment.

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

Preliminary Cost Estimates for Nuclear Hydrogen System Based on High Temperature Electrolysis (고온전기분해 이용 원자력수소 예비타당성 연구)

  • Yang, Kyeongjin;Lee, Taehoon;Lee, Kiyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.228.2-228.2
    • /
    • 2010
  • In this work, the hydrogen production costs of the nuclear energy sources are estimated in the necessary input data on a Korean specific basis. G4-ECONS was appropriately modified to calculate the cost for hydrogen production of HTE process with Very High Temperature nuclear Reactor (VHTR) as a thermal energy source rather than the LUEC (Levelized Unit Electricity Cost). The general ground rules and assumptions follow G4-ECONS. Through a preliminary study of cost estimates, we wished to evaluate the economic potential for hydrogen produced from nuclear energy, and, in addition, to promptly estimate the hydrogen production costs for an updated input data for capital costs. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if $CO_2$ capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of $CO_2$. Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed.

  • PDF

Optimal design of parallel noncontinuous units with feedstock/product storages (원료및 제품저장조를 포함하는 병렬 비연속 공정의 최적설계)

  • Yi, Gyeong-Beom
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.3 no.5
    • /
    • pp.532-541
    • /
    • 1997
  • This article derives an analytic solution to determine the optimal size of multiple noncontinuous process and storage units. The total cost to be minimized consists of the setup cost of noncontinuous processing units and the inventory holding cost of feedstock/product storages. A novel approach, which is called PSW(Periodic Square Wave) model, is applied to represent the material flow among non-continuous units and storages. PSW model presumes that the material flow between unit and storage is periodic square wave shaped. The resulting optimal unit size has similar characteristics with the classical economic lot sizing model such as EOQ(Economic Order Quantity) or EPQ(Economic Production Quantity) model in a sense that the unit size is determined as the balance between setup and inventory holding cost. However, the influence of inventory holding cost of PSW model is different from that of EOQ/EPQ model. EOQ/EPQ model includes only the product inventory holding cost but PSW model includes all inventory holding costs around the non-continuous unit with proportional contribution. PSW model is suitable for analyzing interlinked process-storage system. The optimal lot size of PSW model is smaller than that of EOQ/EPQ model. This is quitea remarkable result considering that the EOQ/EPQ model has been is widely used since last half century.

  • PDF

The Estimation of Production Cost of Local Public Goods with Environmental Difference (환경요인에 따른 지역공공재 생산비용의 격차 추정)

  • 최영호;박상우
    • Journal of the Korean Regional Science Association
    • /
    • v.12 no.2
    • /
    • pp.21-36
    • /
    • 1996
  • This thesis focused on the extent of the area-by-area gap of the unit production cost that should be taken into account without exception in supply of the local public goods production cost. With the advent of the local autonomy era, what should be considered in the local governmen's production of the local public goods are the government's fiscal capacity and the environmental difference that shows up in accordance with the area's characteristics. Though with the same level of the fiscal capacity, an occurrence of environmental difference will lead inevitably to the different level of actual supply of the local public goods. The method of analysis used in this thesis was first to bring out implicit price, to combine this with induced expenditure function, to separate demand function parameter and cost function parameter, and then to analyzed the impact of environmental variables on the production cost. The environmental variables were set on the basis of the ones that affected expenditure per person of the public goods. The analysis was conducted in distinction of city areas and county areas. The results showed that, in cases of cities, more production cost of the public goods was in presence in urban areas and in areas where there was sluggish development. In other words, distinction could be drawn between areas where there was a large consumption of production cost resulting from poor environmental sparked by slow development and those where additional costs were required due to population concentration caused by a certain level of accomplished development. In the meantime, in cases of county areas, the results were around the same. However, a comparison between city areas and county ones told that overall difference between city areas was not that big in the production cost while that in county areas was large enough. In times ahead, in implementation of grant-in-aid scheme, production cost index for local public goods could be used as it was written in consideration of environmental characteristics of areas concerned.

  • PDF

Optimal Operation Scale of Hog Production for Farrow-to-Finish Farms

  • Huang, Y.H.;Lee, Y.P.;Yang, T.S.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.14 no.9
    • /
    • pp.1326-1330
    • /
    • 2001
  • This study analyzed the lowest production cost and the greatest profit to be obtained from marketing hogs to determine the optimal operation scale for family-owned farrow-to-finish farms. Data were collected from 39 farrow-to-finish farms with 500 to 5,000 inventories for two consecutive years, and treated with GLM and quadratic regression models using the REG procedure. Analysis results indicated that farms capable of marketing 2,933 and 3,286 hogs annually had the lowest production cost and the greatest profit, respectively. Further analysis attributed the lowest production cost or the highest return in farms with an optimal scale of 3,000 to a higher survival rate of the herd, as well as lower expenses in veterinary medicine, labor, utilities and fuel, transportation, and depreciation. A similar feed conversion efficiency was observed for all the farms studied. Obviously, the cost efficiencies were associated with the economy of the operation scale of hog production until it reached 3,000 hogs marketed annually for a family-run unit. Beyond the optimal scale of 3,000 hogs, good stockmanship was more difficult to maintain and the herd management deteriorated as increasing mortality confirms. It is conclude that, unless advanced management is applied, the operation scale should not expand beyond 3,000 hogs.

Economic Analysis of Pleurotus Eryngii Cultivation Facilities (큰느타리버섯 재배사의 경제성 분석)

  • Suh, Won-Myung;Yoon, Yong-Cheol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.6
    • /
    • pp.31-41
    • /
    • 2006
  • The analysis used in this work was cost-benefit analysis method. All future costs and returns of a given mushroom house were discounted to the time of initial investment (present) by means of 3.5% discount rate. Then the cost of ownership was compared to the return from the system. This analysis method has been developed and coded into a balance sheet for use on a EXCEL program. Using this programmed analysis,a large number of the case studies were examined using different combinations of economic conditions. These results will be very useful to individuals considering investment in a mushroom house, or any similar production system. By the way of the sensitivity analysis for each important parameter, the change of the marginal cost-benefit period could be finally determined. These parameters were typically construction cost of mushroom house, cost of cooling system, required cooling and heating energy amounts, unit price of mushroom media bottle, growing number of media bottles, production weight per unit bottle, sale price of mushroom, and annual number of growing period, etc.

A Study on the Cost State of the Stow Net Fisheries. (연안안강망어업의 원가실태에 관한 연구)

  • 박정호
    • The Journal of Fisheries Business Administration
    • /
    • v.7 no.1
    • /
    • pp.27-41
    • /
    • 1976
  • The results analyzed of the actual state of the stow net fisheries based on the cost expended in 1975 areas follows; The total cost of this fisheries will be 1, 672, 238 won; the production cost, 1, 588, 060 won (95%) ; the material cost in proportion to total cost (100%)408, 480won (24.4%);the labour cost, 1, 006, 480 won (60.2%) ; the expenses, 173, 100won(10.4%)and the commission and the interest payment, 84, 178won(5%). As above the commission and the interest payment doesn't need to be paid much, but only production cost should be paid in case of small scale inshore fisheries. The cost per unit of caches (per Kg) becomes 12 won, the ratio cost of sales (83.4%), the ratio of profit, 16.%. According to the adove, in case of the powered vessel; it shows a tendency of spending too much expenses owing to excessive payment of oil. And in case of nonpowered vessels, it shows a tendency of spending less expenses but still get much gains, due to the fact that the commission and the interest payment are less, and none is paid for fuel procurement.

  • PDF

Gas Hydrate Supply Chain analyses of economy for the natural gas transportation (천연가스 수송을 위한 Gas Hydrate Supply Chain의 경제성 분석)

  • Kim, Cheoulho;Lee, Jaeik;Jeong, Taeseok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.151.1-151.1
    • /
    • 2010
  • Natural gas hydrates (NGH) provide 170 gas volumes per unit volume of the medium and are easier to make with moderate pressure and temperature (40 bar at 3 C). Once they form, their preservation temperature is 20 C at 1 bar, which is much milder than the LNG preservation. In case of using the NGH, The small and medium sized gas well has advantages for development because of NGH's these characteristics. According to the cost evaluation report of Gudmundsson in Norway and the research of MES in Japan, the gas well that uses the NGH has a cost saving effect about 10~20% compared LNG. The effect depends on distance and production. However, cost saving and efficiency of liquefaction process is increased by the development of LNG liquefaction technology. Therefore, these factors have to be reflected in economic analysis. The purpose of this research is to compare the cost of Gas Supply Chain according to the transport type, distance and gas reserves. Especially, we consider not only the cost of facility but also the total cost (production cost, transport cost, etc).

  • PDF

A Study on the Cost State of Medium Size Two-boat Trawler Fishery (이소인 중형기선저인망어업의 원가실태에 관한 연구)

  • 박정호
    • The Journal of Fisheries Business Administration
    • /
    • v.8 no.2
    • /
    • pp.1-19
    • /
    • 1977
  • The results analyzed of the actual state of medium size two-boat trawler fishery based on the cost expended in 1975 are as follows: According to the calculation of interest, the total cost of this fishery comes to ₩ 55,353,807, and in this account, the production cost comes to ₩ 49,747,383 (89.9%) and the material cost comes to ₩ 27,027,662(48.8%), the labour cost comes to ₩ 10,381,013 (18.8%) the expenses, ₩12,338,708(22.3%) and commision and interest comes to ₩ 5,606,424 (10.1%). As above the fishery comes is 90% of production cost for the expense of production. The ratio of cost element to the total cost 100 is as follow: Fuel: 23.6%, allocation: 14.3%, fishing gear: 14.1%, boat repair: 13.0%, fish box: 8.5%, ice: 14.1%, commission: 6.9%, food cost: 4.5%, interest: 3.2%, transportation fee: 2.8%, consumption: 2.6%, tax: 2.5%, depreciation: 2.4%, administrative expense: 1.6%. The unit cost of catches to each box, including the interest, cames to ₩ 2,167 and not calculating the interest it comes to ₩ 2,098. The cost production to each kg comes to ₩ 114 including interest, without interest, it comes ₩110. When the production cost comes to 90.6%, it comes to 9.4% of total revenue. The reason which this fishery brings low income is that the boats are almost old and semi-diesel engine is used. So, fuel expense and repaire expenses needs too much. Acconding to above this fishery needs to replace new boat and new engine. And new are for this fishery needs to bring under cultivation in order to bring good income with the new method for this fishery. Specially, this fishery brings low income from July to September because of its rest from labour. And so, the expenses, item, and account of money, and the trust money the cost element are not showed in August.

  • PDF