• Title/Summary/Keyword: Unit building method

Search Result 387, Processing Time 0.037 seconds

Nonlinear interaction analysis of infilled frame-foundation beam-homogeneous soil system

  • Hora, M.S.
    • Coupled systems mechanics
    • /
    • v.3 no.3
    • /
    • pp.267-289
    • /
    • 2014
  • A proper physical modeling of infilled building frame-foundation beam-soil mass interaction system is needed to predict more realistic and accurate structural behavior under static vertical loading. This is achieved via finite element method considering the superstructure, foundation and soil mass as a single integral compatible structural unit. The physical modelling is achieved via use of finite element method, which requires the use of variety of isoparametric elements with different degrees of freedom. The unbounded domain of the soil mass has been discretized with coupled finite-infinite elements to achieve computational economy. The nonlinearity of soil mass plays an important role in the redistribution of forces in the superstructure. The nonlinear behaviour of the soil mass is modeled using hyperbolic model. The incremental-iterative nonlinear solution algorithm has been adopted for carrying out the nonlinear elastic interaction analysis of a two-bay two-storey infilled building frame. The frame and the infill have been considered to behave in linear elastic manner, whereas the subsoil in nonlinear elastic manner. In this paper, the computational methodology adopted for nonlinear soil-structure interaction analysis of infilled frame-foundation-soil system has been presented.

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

An Analysis on Characteristics and the Development of Estimation Model of Internal Heat Gain from Appliances in Apartment Units (공동주택 단위세대의 기기발열 특성 분석 및 추정모델 개발)

  • Lee, Soo-Jin;Jin, Hye-Sun;Kim, Sung-Im;Lim, Han-Young;Lim, Jae-Han;Song, Seung-Yeong
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.10
    • /
    • pp.19-26
    • /
    • 2018
  • The purpose of this study was to analyze characteristics and to develop estimation model of IHG(Internal Heat Gain) from appliance in domestic apartment units. To do this, it was defined the source of IHG from appliance and the calculation method through the case study of international and domestic codes. And the equipment related datum such possession, usage or not, etc were collected through field survey in apartment units, and the appliances' electricity consumption were measured separately from overall electricity consumption. Annual electricity consumption value were calculated with field survey datum and appliances' electricity consumption measurement datum, and then IHG value was calculated by applying PHPP v9 method. And it was conducted correlation analysis between IHG value and the area for exclusive use, the number of occupants, and then the IHG from applianace estimation model was deducted with regression analysis. Finally, it was analyzed the present level and of the domestic code(The Building Energy Efficiency Rating System) comparing with the value of estimation model, and the various international codes(HERS, Building America, SAP).

THE EFFECT OF LEED CERTIFIED BUILDING ON THE SURROUNDING NEIGHBORHOOD IN NEW YORK CITY

  • Min Jae Suh;Annie R. Pearce;Young Hoon Kwak
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.28-35
    • /
    • 2013
  • The construction industry has introduced the Leadership in Energy and Environmental Design (LEED) rating system to promote objective evaluations of the sustainability of buildings. Three important values to consider when implementing sustainability are the associated environmental, social, and economic impacts. Recently, researchers have begun to investigate the real estate value of LEED certified buildings in terms of the rental cost, occupancy rate, cost per unit area, and resale value in order to better understand the economic benefits of the LEED rating system. However, the economic benefits also encompass economic effects such as the impact of LEED certified buildings on neighborhood real estate values surrounding the certified buildings. This research examines whether the enhanced real estate value of LEED certified buildings in New York City extends to surrounding commercial buildings, utilizing spatial analysis via a Geographic Information System (GIS) and the hedonic pricing method to derive meaningful economic relationships. The results provide practical insights into the economic effect of LEED certified buildings that will be of interest to city officials and planners, as well as the owners, developers, investors and other stakeholders of surrounding buildings.

  • PDF

A Study on the Development of Precast Concrete Modular and its Application Onsite (프리캐스트 콘크리트 모듈러 개발 및 현장적용에 관한 연구)

  • Bae, Kyu-Woong;Boo, Yoon-Seob;Shin, Sang-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.27-28
    • /
    • 2023
  • Currently, the Off-Site Construction (OSC) construction method, which emphasizes the minimization of field work, is being emphasized at construction sites due to the lack of construction skilled manpower, extreme weather, and the Severe Disaster Punishment Act. In this study, we developed a stacked PC modular, which is a method of stacking PC modules, and solved the lifting problem by reducing the weight of the unit module, which is emerging as the biggest disadvantage of PC modules, to around 20 tons. For the connection between modules, structural safety was secured through repeated history tests of the wall and slab connection. Walls and slabs satisfied all statutory fire resistance times through fire resistance tests, and residential performance was evaluated to be satisfactory through mock-up demonstration. The developed PC modular has been applied to the construction of commercial houses, detached houses, shopping malls, churches, etc., and has design results for many buildings such as dormitories, detached houses with 4 floors or more, and resorts, so it is expected that an atmosphere of revitalization of construction methods will be created.

  • PDF

GNSS-Based PHC Pile Cutting Position Sensing Methodology (GNSS 기반 PHC 파일 절단위치 센싱 방법론에 관한 연구)

  • Cho, Se-Hyun;Yoou, Geon-Hee;Kim, Jun-Sang;Lee, Jun Ho;Hur, Je;Kim, Young Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.387-388
    • /
    • 2023
  • PHC pile head cutting is an essential work in pile foundation construction. However, since the work has labor-intensive characteristics, there are problems such as productivity and safety. So in previous study PHC pile one-cutting head cutting automation equipment was developed to solve this problem. However, it has been investigated as a limitation that checking the cutting position of the PHC pile can be challenging in place where a rotary laser leveler cannot irradiate cutting position, as the sensing unit of the developed automated equipment utilizes an optical method. Therefore, the objective of this study is to delvelop a GNSS-based methodology for sensing the cutting position of PHC piles to overcome the limitations of the optical method and to examine its feasibility for field application. If the proposed methodology is applied to the construction site, it is expected that the convenience and productivity of the PHC pile cutting position sensing work will be improved.

  • PDF

Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life (교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.130-137
    • /
    • 2017
  • To maintain traffic safety during the target lifetime of bridges, it is essential to secure an appropriate maintenance budget and allocate that budget appropriately. This paper proposes a reasonable budget allocation system that considers various impact factors to improve the conventional budget allocation method simply considering the bridge scale. The maintenance action rate model and the unit cost model based on the prior maintenance history were developed to allocate appropriately the bridge maintenance budget for the total bridges of the management organization with the target management level. A method to determine the optimal budget allocation ratio for each management subject was proposed and case analysis was conducted using the proposed model. Proper budget allocation was made considering the bridge types, current safety level, and service life as well as the bridge size as an impact factor of the budget allocation of the bridge. The developed method can prevent budget waste and provide a rational basis for budget allocation by implementing the rational budget distribution.

A study on forces generated on spherical type LNG tank with central cylindrical part under various static loading

  • Shin, Sang-Hoon;Ko, Dae-Eun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.8 no.6
    • /
    • pp.530-536
    • /
    • 2016
  • The number of fabrication shop for spherical type LNG tank is proportional to that of the tank radius to be constructed. Due to limitation of facility investment including building sites, it is practically difficult to fabricate various size tanks with perfectly spherical shape in the yards. The efficient method to be capable of increasing cargo tank volume is to extend vertically the conventional spherical type LNG tank by inserting a cylindrical shell structure. The main purpose of this study is to derive related equations on forces generated on spherical type LNG tank with central cylindrical part under various static loadings in order to establish the simplified analysis method for the initial estimate. In this study, equations on circumferential and meridional force have been derived and verified by relations with the reaction forces per unit length of equator.

Integrating Deep Learning with Web-Based Price Analysis to Support Cost Estimation

  • Musa, Musa Ayuba;Akanbi, Temitope
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.253-260
    • /
    • 2022
  • Existing web-based cost databases have proved invaluable for construction cost estimating. These databases have been utilized to compute approximate cost estimates using assembly rates, unit rates, and etc. These web-based databases can be used independently with traditional cost estimation methods (manual methods) or used to support BIM-based cost estimating platforms. However, these databases are rigid, costly, and require a lot of manual inputs to reflect recent trends in prices or prices relative to a construction project's location. To address this gap, this study integrated deep learning techniques with web-based price analysis to develop a database that incorporates a project's location cost estimating standards and current cost trends in generating a cost estimate. The proposed method was tested in a case study project in Lagos, Nigeria. A cost estimate was successfully generated. Comparison of the experimental results with results using current industry standards showed that the proposed method achieved a 98.16% accuracy. The results showed that the proposed method was successful in generating approximate cost estimates irrespective of project's location.

  • PDF

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.