• Title/Summary/Keyword: Unit Cost Factor

Search Result 138, Processing Time 0.026 seconds

Estimating Standards and Cost Data for Modernized Korean Hosing (Hanok) (신한옥 건설 특성을 반영한 표준품셈 개발)

  • Kim, Suji;Kim, Min;Lee, Yunsub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.66-75
    • /
    • 2016
  • As the demands for traditional Korean housing has been increased in recent years, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. Modernized Hanok attempts to remedy the shortcomings of the traditional hanok (i.e., high unit cost of building and low energy performance). In the previous researches, standardization and productivity improvement for modernized Hanok dissemination have been intensely developed. Above all, cost estimating for modernized Hanok is also an important factor. In an effort to provide effective system for Hanok construction, this paper developed 'standard cost data' for modernized Hanok. Distinct characteristic of modernized Hanok construction were analyzed first. Then, basic structure was identified, and major items were selected for Hanok standard cost data. However, this set of cost data was developed based on two mock-up Hanok projects actually constructed. Accordingly, this standard cost data will be further updated and modified by continuously accumulating real-world Hanok projects

A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.

The study on the Development of Menu Evaluation Mode1 in the Hotel (관광호텔 메뉴 평가모델 개발에 관한 연구)

  • 엄영호;이윤신
    • Culinary science and hospitality research
    • /
    • v.6 no.3
    • /
    • pp.307-328
    • /
    • 2000
  • Menu is regarded as the main factor for management of hotel and restaurant. Menu design was affected by many factors, but there are some items should be considered carefully for development of menu, such as a good understandings of consumers' demand. considering of the regional characteristics, establishing of the exact target, and careful thinking of a unit cost. At last, the most important factor is careful evaluation of developed menu and it have to be continuously reformed by feed back of these factors. Food service industries should create an independent menu(including restaurant layout, consumer level, marketing and advertising) rather than copying other restaurant' menu. Also. we have to design an efficient menu with useful information through the best of menu.

  • PDF

Durability Performance Analysis of a Differential Gear for a Low Speed Vehicles (저속차량 차동장치의 내구성능 해석)

  • Cheon, Jong-Pil;Pyoun, Young-Sik
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.21 no.6
    • /
    • pp.897-902
    • /
    • 2012
  • Low speed vehicle(LSV), golf carts have unique requirements to differential gear design. For double axle torque LSV differential loading conditions were determined with the help of analytical model and ANSYS finite element analysis. With stress safety factor 3.15, fatigue safety factor 1.08 and fatigue life 106 cycle ring gear teeth strength analysis is performed and structure design optimized. This allows reducing overall cost of differential unit.

Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction (공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측)

  • Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

AC-DC Converter Control for Power Factor Correction of Inverter Air Conditioner System (인버터 에어컨 시스템의 역률보상을 위한 AC-DC 컨버터 제어)

  • Park, Gwi-Geun;Choi, Jae-Weon
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.2
    • /
    • pp.154-162
    • /
    • 2007
  • In this paper, we propose a new AC-DC converter control method to comply with harmonics regulation(IEC 61000-3) effective for the inverter system of an air conditioner whose power consumption is less than 2,500W. There are many different ways of AC-DC converter control, but this paper focuses on the converter control method that is adopting an input reactor with low cost silicon steel core to strengthen cost competitiveness of the manufacturer. The proposed control method controls input current every half cycle of the line frequency to get unit power factor and at the same time to reduce switching loss of devices and acoustic noise from reactor. This kind of converter is known as a Partial Switching Converter(PSC). In this study, theoretical analysis of the PSC has been performed using Matlab/Simulink while a 16-bit micro-processor based converter has been used to perform the experimental analysis. In the theoretical analysis, electrical circuit models and equations of the PSC are derived and simulated. In the experiments, micro-processor controls input current to keep the power factor above 0.95 by reducing the phase difference between input voltage and current and at the same time to maintain a reference DC-link voltage against voltage drop which depends on DC-link load. Therefore it becomes possible to comply with harmonic regulations while the power factor is maximized by optimizing the time of current flow through the input reactor for every half cycle of line frequency.

Harmonics Reduction in Load control and Management system

  • Thueksathit, W.;Tipsuwanporn, V.;Hemawanit, P.;Gulpanich, S.;Srisuwan, K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2283-2286
    • /
    • 2003
  • This paper presents conservation of electrical energy in building with harmonics analysis and compensation which occur in electrical system. We use load controlling and management system in order to adjust load factor of system.The maximum demand limiting and controlling are used ,then the system can acquire the prediction and compare it to the maximum demand set point.The electrical signal analysis based on FFT technique. The harmonics are compensated by using harmonic filters.This system consists computer which works as controller, processor , analysis and database unit together with digital power meter in form of multidrop network through serial communication via RS-485.The load control system uses PLC to control load via serial communication RS-485. The A/D converter is used for sampling the electrical signals via parallel port of computer.The harmonic filters are controlled by a computer.The data of measurement such as voltage, current, power, power factor, total harmonic distortion, energy, etc., can be saved as database and analysis. The load factor is adjusted by limiting and controlling maximum demand. The load factor adjustment can reduce the cost of electric consumption and energy generation together with harmonics compensation in order to increase high efficiency of electrical system.

  • PDF

Influence Factors of Typical Real Estate Development Projects (부동산 개발사업의 유형별 투자결정요인 분석)

  • Lee, Taek-Soo;Lee, Joo-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.1
    • /
    • pp.456-466
    • /
    • 2013
  • The most important thing to develop real estate asset would be a feasibility study. To secure feasibility of development projects, reducing and minimizing the cost of land and construction also would be the important thing. To analyze optimal land-value for real estate development projects, I have collected 204 balance sheets of development projects in South Korea. With the help of statistical technology, I could have selected useful data from those balance sheets. After detailed analysis of statistical data, I could have reached conclusion that the most important factor to earning rate would be land cost per unit ground area under the constraint of given sale price. So far the main pattern of feasibility study of development projects was land cost and construction cost. However, by this study, I have found a new fact that construction cost has little effect to earning rate and land cost per unit ground area is the most effect to earning rate especially in residential facilities rather than commercial ones.

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

An Analysis of the Importance of the Risk Factors Influencing the Calculation of the Subcontract Construction Bidding Cost (건설공사 하도급 입찰단가 산정에 영향을 미치는 리스크 요인의 중요도 분석)

  • Lee, Sung-Goo;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.109-117
    • /
    • 2007
  • The construction environment has the trend of oversizing and professionalizing, the increase of the construction period, and the risk factors and the uncertain factors which are important in the construction bid. The misunderstanding and the lack of knowledge of the subcontractor result in the decrease of the profit or the deficit. In conclusion, these are supposed to give the financial burden to the subcontractor. So, it is very important to predict the construction preparation cost calculation by the risk factors in the bidding stage and to calculate the bid unit cost considering the target profit of the subcontractor in the process of the mutual agreement and performance of the contract. In these points of view, this study analyzes how the importance of the risks influencing the bidding cost calculation affect the construction cost, and this analysis can be used as the basic data to establish the suitable bid strategy of the subcontractor.