Experimental Study for the Capacity of Ordinary and Emergency Ventilation System in Deeply Underground Subway Station (대심도 지하역사 승강장 및 대합실 평상시/비상시 급·배기 풍량에 대한 실험적 연구)

  • Jang, Yong-Jun;Lee, Ho-Seok;Park, Duck-Shin
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.579-587
    • /
    • 2012
  • Shin-gumho station in Seoul underground subway have been selected to be experimentally investigated and analyzed for the real air supply & exhaust capacity compared to the original capacity of ordinary and emergency condition. The depth of Shin-gumho station is 43.6m which consists of the island-type platform ($8^{th}$ floor in underground) and a two-story lobby (first & second floor in underground). An emergency staircase connects between the platform and the lobby. Hot-wire anemometer, capture hood, wind vane & velocity meter and data acquisition systems are employed to perform the automatic measurement in this experiment. For ordinary case, air supply and exhaust capacity in the lobby were reduced by 34% and 46% compared to the original capacity, respectively. Air supply and exhaust capacity in the platform were reduced by 66% and 38%, respectively. For emergency case, air supply in the lobby was reduced by 42% and air exhaust in the platform was reduced by 28% compared to the original capacity. Therefore, air pollution in the station is expected to be worse in the ordinary environment and smoke control capability in the platform will be weakened in case of fire emergency.

A Study on the Behaviour of the Station Structure due to Adjacent Construction (근접시공에 따른 정거장구조물 거동특성에 관한 연구)

  • Chung, Jeeseung;Kim, Manhwa;Lee, Sungil;Kim, Hongjoo;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.55-64
    • /
    • 2016
  • Recently, it has been made many adjacent construction of inter-facility by the expansion of urban infrastructure facilities using the underground space. The complaints relating to the stability of the facility by adjacent construction is common. In this study, it was conducted for the subway line 5 Gimpo airport station structure in the upper Gimpo urban railway to determine the behavior characteristics of station structure according to adjacent construction. It was performed evaluation of the safety zone and excavation method for station structure. And after a review of damage evaluation, track irregularities and structural calculation by using a numerical analysis, stability of the station structure according to adjacent construction was evaluated to be secured. This study is expected to be used as basic data in advance if you need to review the effects of nearby structure according to adjacent construction.

Evaluation on the Applicability of a Lattice Girder for a Support System in Tunnelling (격자지보의 터널지보재로서의 현장 적용성 평가)

    • Tunnel and Underground Space
    • /
    • v.9 no.3
    • /
    • pp.204-213
    • /
    • 1999
  • NATM(New Austrian Tunnelling Method) uses a support system of shotcrete, rockbolt and steel support, which are installed after tunnel excavation. Recently, a lattice girder among these support system is used in tunnelling. A lattice girder is a new steel support developed in Europe for the replacement of an existing H-shaped steel set, which is reported to have some problems in installation. This is a triangular shape welded with steel rods and is a light-weight support system which enables fast and easy installation of porepolling. The major advantage of a lattice girder is the good bonding with shotcrete. In this study, to evaluate the applicability of a lattice girder in tunnelling in Korea, field tests were performed at a high speed railway tunnel with a large section. Also, features of lattice girder in field tests were compared with those of a H-shaped steel set respectively. Field tests proved that a lattice girder fully supported the initial earth pressure developed right after excavation and limited ground deformation effectively.

  • PDF

A study on the comparison by the methods of estimating the relaxation load of SEM-pile (SEM파일의 이완하중 산정방법별 이완하중량 비교 연구)

  • Kim, Hyeong-Gyu;Park, Eun-Hyung;Cho, Kook-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.543-560
    • /
    • 2018
  • With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).

A study on design and performance test of fire door with high endurance performance in submarine tunnel (고내구성능을 갖는 해저터널 방화문 설계방안 및 성능시험 연구)

  • Park, Sang-Heon;Hwang, Ju-Hwan;Choi, Young-Hwan;An, Sung-Joo;Yoo, Yong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.331-346
    • /
    • 2018
  • In the tunnel of domestic high - speed railway, the main fire - fighting facility, fire - extinguishing passageway, is installed. However, due to the high pressure of the high - speed train, frequent breakage and maintenance are caused by strong shock and long - term vibration. In order to solve these problems, it is necessary to improve the fire door, but in Korea, it is installed by submitting a certificate by simple KS F 2296 performance test. At present, it is developed as a simple test certification by producing a real scale fireproof door without the theoretical examination in advance, so that a high cost for improvement is occurring in Korea. Therefore, through this study, structural analysis study which can preliminary structure review was carried out in order to design the refuge connection passage fire door and to improve the performance improvement. In order to secure the reliability of the result value, the official authentication test (KS F 2296) were compared.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

Characterizing Par ticle Matter on the Main Section of the Seoul Subway Line-2 and Developing Fine Particle Pollution Map (서울시 지하철 2호선 본선구간의 입자상물질 농도 특성 및 미세분진의 오염지도 개발)

  • Lee, Eun-Sun;Park, Min-Bin;Lee, Tae-Jung;Kim, Shin-Do;Park, Duck-Shin;Kim, Dong-Sool
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.32 no.2
    • /
    • pp.216-232
    • /
    • 2016
  • In present, the Seoul City is undergoing traffic congestion problems caused by rapid urbanization and population growth. Thus the City government has reorganized the mass transportation system since 2004 and the subway has become a very important means for public transit. Since the subway system is typically a closed environment, the indoor air quality issues have often raised by the public. Especially since a huge amount of PM (particulate matter) is emitted from ground tunnels passing through the subway train, it is now necessary to assess the characteristics and behaviors of fine PM inside the tunnel. In this study, the concentration patterns of $PM_1$, $PM_{2.5}$, and $PM_{10}$ in the Seoul subway line-2 were analyzed by real-time measurement during winter (Jan 13, 2015) and summer (Aug 7, 2015). The line-2 consisting of 51 stations is the most busy circular line in Seoul having the railway of 60.2 km length. The the one-day average $PM_{10}$ concentrations were $148{\mu}g/m^3$ in winter and $66.3{\mu}g/m^3$ in summer and $PM_{2.5}$ concentrations were $118{\mu}g/m^3$ and $58.5{\mu}g/m^3$, respectively. The $PM_{2.5}/PM_{10}$ ratio in the underground tunnel was lower than the outdoor ratio and also the ratio in summer is higher than in winter. Further the study examined structural types of underground subsections to explain the patterns of elevated PM concentrations in the line-2. The subsections showing high PM concentration have longer track, shorter curvature radius, and farther from the outdoor stations. We also estimated the outdoor PM concentrations near each station by a spatial statistical analysis using the $PM_{10}$ data obtained from the 40 Seoul Monitoring Sites, and further we calculated $PM_{2.5}/PM_{10}$ and $PM_1/PM_{10}$ mass ratios near the outdoor subway stations by using our observed outdoor $PM_1$, $PM_{2.5}$, and $PM_{10}$ data. Finally, we could develop pollution maps for outdoor $PM_1$ and $PM_{2.5}$ near the line-2 by using the kriging method in spatial analysis. This methodology may help to utilize existing $PM_{10}$ database when managing and control fine particle problems in Korea.

A study on the improvement of the air exhaust system at the PSD installed subway station (도시철도 지하역사 PSD 설치에 따른 배기시스템 개선 연구)

  • Kwon, Soon-Bark;Song, Ji-Han;Ryu, Ju-Hwan;Jo, Seung-Won;Oh, Tae-Suk;Bae, Sung-Joon;Kim, Hyo-Gyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.353-362
    • /
    • 2015
  • Platform screen door (PSD) installed at underground subway station has reduced the safety accident, but it may cause poor air ventilation condition due to the isolated exhaust duct in the subway tunnel area. In this study, the additional ventilation system was suggested, which can be installed at a void space (i.e., storage room under stairs) of platform in order to improve efficiency of air ventilation rate. Exhausted air from platform was directed to underneath of platform and joined with existing ventilation duct of train exhaust system (TES). One subway station in Seoul city was selected to predict the effectiveness of the suggested lower exhaust system by using the computational fluid dynamics (CFD) analysis. The predicted mean age of air was decreased by 16.5% which proves the improvement of air ventilation efficiency when the suggested lower exhaust system was applied.

Efficiency Evaluation of Operating Railroad with Subway Cabin Air Purifier (도시철도 객실 공기정화장치(SCAP)의 운행차량 효율평가)

  • Kwon, Soon-Bark;Park, Duck-Shin;Cho, Young-Min;Kim, Jong-Bum;Cho, Goan-Hyun;NamGoong, Seok;Lee, Joo-Yeol;Kim, Tae-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1303-1308
    • /
    • 2011
  • In the modern society various types of transportation mode are utilized, among them the subway system is the one of the main transportation mode which more than 7.21 million people ride a day. Because of interests on the indoor air quality (IAQ) of underground public facilities, concerns on IAQ of subway system by many people are increasing. There are several approach to improve IAQ of subway station, such as installing platform screen door (PSD), frequent tunnel washing-out, and etc, however there has not been any attempt to improve IAQ of subway cabin inside. Most technologies for removing airborne particulate matters are known to be difficult to adopt on the subway cabin since the problem of maintenance cost. Therefore, the ultimate object of this study is a practical development of cabin air cleaning system which can reduce the concentration of airborne particles and harmful gases at the same time. The subway cabin air purifier (SCAP) was developed for removing particulate matters and gases pollutants inside a cabin. The whole system was designed and the roll-filter device was manufactured based on numerical prediction results. It is expected that SCAP could reduce indoor air pollutants in the subway cabin practically and it can be applied to other part of transportation vehicles.

  • PDF

A Study on Speed-up of a Transition Section Between Overhead Catenary and Rigid Conductor System (강체 전차선로이행구간 고속화 방안 연구)

  • Lee, Kiwon;Choi, Tae-Su;Cho, Yong Hyeon;Park, Young;Jun, Hyo Chan;Choi, Kyu-Hyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.3
    • /
    • pp.467-473
    • /
    • 2018
  • R-Bar(Overhead Rigid Conductor system) is being developed for the high-speed in Europe because it has an advantage of cross section area reduction of tunnel compared with OCS (Overhead Catenary Line). Because there are lots of underground sections and mountains in korea, it is necessary to develop the R-Bar for a high-speed line. In this study, a method on speed-up of transition section between OCS and R-Bar is proposed. The commercial program, DAFUL, is used to predict a dynamic characteristics between Overhead Line and pantograph. The program is evaluated according to EN 50318 which is the European Norm for evaluation of the program. Using the evaluated modeling and method, a method for the max. speed of 250 km/h of transition section is proposed.