• 제목/요약/키워드: Underground power cable system

검색결과 158건 처리시간 0.037초

Partial Discharge Simulation and Analysis Based on Experiment in Underground Distribution Power Cables

  • Jung, Chae-Kyun;Kim, Jeong-Tae;Lee, Jong-Beom
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권4호
    • /
    • pp.832-839
    • /
    • 2013
  • This paper describes the simulation and experiment for partial discharge (PD) pulse propagation in 22.9kV CNCV power cables. To investigate the propagation characteristics of PD, experiments are carried out by injecting the PD pulse in 100m-long 60 $mm^2$ CNCV cable in the laboratory. The characteristics of PD are also simulated using EMTP to investigate and analyze PD in the same cable. By comparing the simulation and test results, parameter permittivity is recalculated by considering semiconducting screen in the process of simulation and analysis of PD. After it is proved that simulation results and test results are almost similar in the laboratory, extensive simulations are performed to analyse various PD characteristics such as propagation velocity, attenuation, etc. in 60 $mm^2$ and 325 $mm^2$ CNCV cables. Authors are confident that results obtained in this paper will be used as important technical materials to detect and investigate PD generated in transmission and distribution power cables.

초고압 XLPE 케이블 접속함의 부분방전 펄스파형 시뮬레이션 (Pulse Waveform Simulation of Partial Discharges for HV XLPE Cable Joints)

  • 김정태
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.75-81
    • /
    • 2018
  • In this study, the simulation of partial discharge pulse waveform have been performed for the typical joints such as EBA and PMJ in the HV underground transmission XLPE cable system in order to improve the understanding of partial discharge pulse waveform and the on-site measurement accuracy of partial discharges. FDTD simulation technique was adopted for the simulation and has been shown to be suitable for partial discharge simulation of power cables in terms of pulse propagation characteristics and waveform formation. The simulation results for the EBA showed that the second not-so-large opposite polarity peak appeared after the first negative polarity peak and the measurement sensitivity was the highest near the bottom of the EBA copper box. In the analysis results for PMJ, the magnitude of the second opposite polarity peak was large enough to compare with the first peak, and the measurement sensitivity at the end of the PMJ copper box was the highest. These simulation results show considerable similarity with the on-site measurement, and it would be very useful for the partial discharge measurement of HV XLPE cable systems.

지중송전계통에서 시스순환전류 해석 및 저감방안 (Analysis and Reduction Methods of Sheath Circulating Current in Underground Transmission Systems)

  • 정채균;이종범;강지원;장태인
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권11호
    • /
    • pp.537-545
    • /
    • 2001
  • This paper describes the analysis of sheath circulating current and various methods to reduce the large circulating current in case of operating cable system using EMTP/ATPDraw. And also, possible methods are proposed through a detailed analysis regarding cable systems by considering various electrical and environmental factors. It is evaluated that the proposed reduction methods can be effectively applied to reduce the large sheath circulating over current with the minimized electrical problems.

  • PDF

특고압 인입공사 시공방법연구 (A Study of Construction method of installing High-Voltage Lead-in)

  • 오승철;박수홍
    • 한국전자통신학회논문지
    • /
    • 제6권1호
    • /
    • pp.129-134
    • /
    • 2011
  • 일상생활에 필요한 전력공급을 제공받기 위해서는 한전 책임분기점 전주에서 전기실 수변전설비까지 시공방법을 설계도면을 숙지하고 현장작업 조건을 충분히 파악하여 한전 한전책임분계점 위치를 한전측과 협의하여 결정하고 전주에 책임분계점(수전점)의 지중케이블 입상주을 설치하고 옥외관로터파기 및 맨홀을 설치하며 파상형경질폴리에틸렌 전선관(125C) 및 CNCV-W특고케이블을 포설하고 전기실 수배전반설치까지의 공사과정을 면밀히 분석 검토하여 시공한다. 공동주택 전력계통의 핵심적인 부분인 한전 책임분계점에서 부터 옥외관로공사, 특고압지중전선로 및 수배전반설치까지 실제 현장에서 직접 시공한 내용을 기초로 하여 공동주택의 특고압인입공사 및 수배전반 설치에 대한 시공방법의 내용을 제시 하였다.

뉴로-퍼지를 이용한 혼합송전계통에서의 고장점 추정 (Fault Location using Neuro-Fuzzy in Combined Transmission Lines with Underground Power Cables)

  • 김경호;이종범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.319-322
    • /
    • 2002
  • Distance relay is operated in calculating line impedance. It can be worked accurately in overhead line. However, power cables or combined transmission lines need compensation for calculated impedance because cable systems have sheaths, grounding wires and sheath voltage limiters(SVLs) Neuro-fuzzy can be viewed either as a fuzay system, a neural network or fuzzy neural network and it can estimate the location of the fault accurately. In this paper, fault section and fault location can be classified and estimated in neuro- fuzzy inference system and neural network.

  • PDF

지중송전케이블 신축변화량 측정시스템 개발 (Developing the system to measure variations in expansion of underground power cable)

  • 오장만;윤동수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.385_386
    • /
    • 2009
  • 최근들어 급격하게 증가하고 있는 지중송전선로의 효과적인 관리를 위한 최신 장비와 공법들이 개발되고 있다. 지중송전선로 건설당시 설계된 지중케이블의 Off-set 변화량의 정상적인 동작확인과 시간의 경과에 따른 변위량을 정확하게 측정하여 케이블의 안전한 운영기준으로 활용할 수 있다. 또한 전력구내에 설치된 지중케이블의 감시시스템과 연계하여 실시간으로 케이블의 상태와 외부 환경요인의 변화에 따른 케이블 상태도 실시간으로 확인할수 있다. 본론에서 케이블의 전력량과 이동량의 변화를 측정한 결과 그동안 추측했던 부분에 대해 정확한 검증이 가능했으며 설비유지관리에 효과적으로 대응할수 있다.

  • PDF

고체-고체 거시계면의 수명예측에 관한 연구 (Study on the Prediction of the Life-time in the Macroscopic Solid-Solid Interfaces)

  • 박정규;배덕권;정동회;오재한;김충혁;이준웅
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2000년도 하계학술대회 논문집
    • /
    • pp.775-778
    • /
    • 2000
  • In this paper, the life-time of macro interface between Epoxy/EPDM which consists in underground power cable joints is predicted. The electrode system of specimen is designed by FEM(finite elements method). The breakdown strength of specimens are observed by applying high AC voltage at the room temperature. The breakdown times under the constant voltage below the breakdown voltage were gained. As constant voltage is applied, the breakdown time is proportion to the breakdown strength. The life exponent n is gained by inverse power law, and the long breakdown life time can be evaluated.

  • PDF

전력구트라프간접수냉방식에서의 지중송전케이블에 대한 열해석 (A Thermal Analysis for the Underground Power Transmission Cable by a Water Pipe Cooling Method with Trough in Tunnel)

  • 박만흥
    • 태양에너지
    • /
    • 제15권3호
    • /
    • pp.59-73
    • /
    • 1995
  • 원활한 전력공급을 위해 지중송전케이블에서 발생된 열을 제거하기 위한 방법으로 전력구트라프간접수냉방식이 적용된 지중송전계통에 대한 각 주요 구성요소의 열해석을 수행하였다. 열해석을 수행한 결과, 주어진 조건에서 냉동기가 채택된 냉동장치에서는 냉각수유량은 $2{\sim}3{\ell}/s/pipe$, 팬에 의한 풍속은 $1{\sim}2m/s/fan$인 경우에 지중송전계통의 원활한 전력공급을 위한 냉각계통의 최적조건으로 계산되었다. 반면에 냉각탑만을 설치한 경우에는 냉각수유량 및 풍속이 각각 $2{\sim}3s/pipe$ 및 6 m/s/fan이 최적조건으로 계산되었다. 그러나 냉각탑만이 설치된 경우에는 풍속이 너무 커져서 용량이 큰 팬의 설치 및 전력구내에서 작업자의 작업조건에 적합하지 않다. 따라서 본 연구의 주어진 조건하에서 지중송전계통의 냉동계통은 냉동기가 설치된 냉동장치가 바람직하다.

  • PDF

실시간 측정데이터 기반의 디스크커터 마모상태 판별 딥러닝 알고리즘 개발 (Development of deep learning algorithm for classification of disc cutter wear condition based on real-time measurement data)

  • 이지윤;여병철;정호영;김정주
    • 한국터널지하공간학회 논문집
    • /
    • 제26권3호
    • /
    • pp.281-301
    • /
    • 2024
  • 송전선로 지중화 사업의 일환인 전력구 터널은 쉴드TBM 공법에 의해 건설된다. 쉴드TBM 구성요소 중 디스크커터는 암반을 파쇄하는 중요한 역할을 수행한다. 마모한계에 도달하거나 편마모와 같은 파손이 발생함에 따라 적절한 교체가 이루어져야 효율적인 터널 공사가 가능하다. 본 연구에서는 실시간으로 측정된 디스크커터의 마모량과 회전수를 기반으로 디스크커터의 마모상태를 판별하기 위한 딥러닝 알고리즘 개발을 수행하였다. 실대형 굴진시험 결과를 통해 디스크 커터의 마모상태에 따라 측정데이터가 상이하게 획득되는 것을 확인하였다. 합성곱신경망 모델을 기반으로 실시간 측정데이터를 활용하여 디스크커터의 마모특성을 판별할 수 있는 알고리즘을 개발하였다. 합성곱신경망의 필터를 통해 데이터의 분포 특성을 학습할 수 있고, 이러한 패턴 특징을 통해 균등마모와 편마모를 분류할 수 있는 모델의 성능을 확인하였다.

뒷채움 주입 거리에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석 (Analysis on the behavior of shield TBM cable tunnel: The effect of the distance of backfill grout injection from the end of skin plate)

  • 조원섭;송기일;류희환
    • 한국터널지하공간학회 논문집
    • /
    • 제16권2호
    • /
    • pp.213-224
    • /
    • 2014
  • 최근, tunnel boring machine (TBM)을 이용한 도심지 지중 전력구 터널 건설이 증가하고 있다. 쉴드 TBM을 이용한 기계화 터널 굴착 공법은 재래식 공법에 비해 지반침하를 최소화 하고 발파에 의한 진동을 줄일 수 있는 장점이 있다. 국내에서는 earth pressure balance(EPB) 쉴드 TBM이 주로 사용되고 있다. 그러나 전력구 터널 굴착을 위한 쉴드 TBM 공법이 증가함에도 불구하고, 전력구 쉴드 TBM 터널의 거동 분석에 관한 연구는 미비한 실정이다. 본 연구에서는 후방주입 거리에 따른 전력구 쉴드 TBM 터널의 거동 특성을 분석하고, 굴착면 지반 손실과 후방주입 거리와의 상관관계를 도출하고자 한다. 쉴드 TBM을 이용한 터널 굴착은 3D FEM을 이용하여 시뮬레이션 하였다. 뒷채움 그라우트가 설치되는 거리의 변화에 따른 축력, 전단력, 휨 모멘트와 같은 단면력을 검토하고 지표면에서의 연직 변위를 분석하였다. 또한, 유한요소해석으로 얻어진 결과와 안정성 분석에 기초하여, 지반과 터널 구조물의 안정성을 확보할 수 있는 뒷채움재 주입시기를 결정할 수 있다.