HVDC 송전망의 형태는 가공선로(Overhead Transmission Line)와 지중선로(Underground Transmission line)가 있다. 가공선로는 비교적 건설비가 저렴하고 쉽게 설치 할 수 있다는 장점이 있지만 설치할 부지를 확보하기 어렵다는 단점이 있다. 또한 지중선로는 설치되는 지역의 외관을 해치지 않고 주변 환경에 크게 영향을 주지 않는다는 장점이 있지만 케이블을 매설하기 위해서 깊은 관로를 파야하며 이때 많은 비용이 발생하게 된다는 단점이 있다. 새롭게 제시하는 HVDC Pipeline은 두 가지 송전망과 다른 새로운 방식으로서 도로에 Pipeline형태로 HVDC케이블을 얕게 매설하거나 지표면에 도출시키는 방식이다. 도로를 이용함으로서 가공선로의 새로운 부지를 확보해야한다는 단점을 개선하고 깊은 관로로 인해 발생하는 지중선로의 높은 공사비용을 감소시킬 수 있는 방안이라고 생각한다.
A power frequency magnetic field reduction method using passive loop is presented. This method can be used to reduce magnetic fields generated within the restricted area near transmission lines by alternating current overhead transmission lines. A reduction algorithm is described and related equations for magnetic field reduction are explained. The proposed power frequency magnetic field reduction method is applied to a scaled-down transmission line model. The lateral distribution of reduction ratio between magnetic fields before and after passive loop installation is calculated to evaluate magnetic field reduction effects. Calculated results show that the passive loop can be used to cost-effectively reduce power frequency magnetic fields in the vicinity of transmission lines generated by overhead transmission lines, compared with other reduction methods, such as active loop, increase in transmission line height, and power transmission using underground cables.
Distance relay is tripped by the line impedance calculated at the relay point. Accordingly the accurate operation depends on the precise calculation of line impedance. Impedance can be accurately calculated in case of overhead line. However, in case of power cables or combined transmission lines, impedance can not be accurately calculated because cable systems have the sheath, grounding wires, and cable cover protection units (CCPUs). There are also several grounding systems in cable systems. Therefore, if there is a fault in cable system, these terms will severely be caused much error to calculation of impedance. Accordingly the proper compensation should be developed for the correct operation of the distance relay. This paper presents the distance calculating algorithm in combined transmission line with power cable using wavelet transform. In order to achieve such purpose, judgement method to discriminate the fault section in both sections was proposed using db1 coefficient summation. And also, error compensation factor was proposed for correct calculation of impedance in power cable.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2009.10a
/
pp.429-434
/
2009
In this paper it was written about the safety management plan for underground power transmission cable, and it guarantees the reliable electric power supply and facility management to prevent an electric disasters according to that. Recently fires which happens on OF Cable lead to a breakdown of power system and cause a power outage of wide area and serious social problems. So it needs an improvement of inspection ability on OF cable as well as a strict inspection system to prevent that problems in advance and it will bring us the development of electric safety management and the reliable electric power supply.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2011.10a
/
pp.581-584
/
2011
It is necessary to know what a range is effective for induction to prepare protective measures. In this paper, a simulation is practised to find ranges appropriate to underground transmission and distribution power line. There are two elements for ranges. They are parallelized length and separate distance between a telecommunication line and power line. The legal law presents limited voltages of induction. Simulation means to find what specification range of above two elements the induced voltage is over the limited voltage at. It was simulated that induced voltage for the case of underground power lines was over at the length of about 13km when the separate distance was fixed at 3m.
Journal of Korean Tunnelling and Underground Space Association
/
v.17
no.2
/
pp.107-115
/
2015
As TBM construction method is widely applied to construct underground transmission lines, increasing attention has been drawn to SFRC(steel fiber reinforced concrete) segment with respect to structural characteristics. Health hazards of electromagnetic wave which the underground transmission lines emit has emerged, and there is a concern that electromagnetic wave can be amplified because a segment characteristic such as electrical conductivity is changed by steel fibers. In order to analyze correlation between steel fiber dosage and electromagnetic wave, the specimens were fabricated on three conditions to perform experimental tests. From the measured data, it is proven that there is no correlation between the electromagnetic wave and steel fiber reinforced concrete.
This study is to observe stray currents generated around the steel tower by domestic transmission network system and analysis stability of electric detonator. It is measured the stay current of each ten place at steel tower of 765 kV, 345 tV, 154 tV transmission line among domestic transmission network system. Stay currents measured a total of 40m at intervals of 4m toward a line direction and a line vertical direction centering around steel tower. Temperature of the surface, EC, water content also are measured. Although stay currents show the highest values, that is 12 percent of at 4m and less than 1 percent of 40m with Institute of Makers of Explosives(IME) regulations. It is shown correlation between stay currents and water content$\cdot$EC$\cdot$temperature of the surface. Stay currents measured at line direction and line vertical direction were little different and the shape of diminution was also shown a similar aspect.
Kim, Nam-Yul;Kim, Joung-Yun;Heo, Hoi-Deok;Lee, Su-Kil
Proceedings of the KIEE Conference
/
2006.11a
/
pp.405-407
/
2006
The power system analysis based on the accurate impedance of the individual underground cable, which is the inter connected to a large power system, is required. A study on calculation method of impedance allowable current for underground cables. furthermore, various methods of bonding and earthing the sheath have been used for the purpose of eliminating or reducing the sheath losses. the effectes of bonding and earthing must be includied in impedances. therefore, the subject of predicting thermal performance of soil and cable systems has been received increasing attension. for these problems, this paper describes a general formulation of impedance that is based on the effect of crossbonding and earthing of the sheath on the 66kV, 132kV and 220kV underground cable systems. also the work is presented, for calculating the temperature rise of power cable and soil.
The distributed jointing method is used in the underground tunnel due to narrow space of jointing. This method causes non-uniform length between cable joints. It has an effect on the sheath circulating current and the induced voltage. Furthermore the distributed jointing method may cause transient overvoltage resulting from lightning in underground cable which is connected with overhead line. The author diversely studied the sheath circulating current and induced voltage on underground cable depending on the distributed jointing length under the normal and the transient circumstances. The various simulation results really improve the cable system utility.
The protection of underground cables against transient overvoltages resulting from lightning and other causes is important in cable-tine which is connected with overhead line and underground cable. This paper investigates the failure of CCPU(Cable covering Protection Unit) and presents improved configuration method of CCPU in underground cable system EMTP(Electromagnetic Transient Program) is used in order to study the overvoltages and modeling of components of the system such as overhead lines, underground cables, CCPUs and towers in presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.