• Title/Summary/Keyword: Underground Facility

Search Result 376, Processing Time 0.029 seconds

Development of Two-Dimensional Near-field Integrated Performance Assessment Model for Near-surface LILW Disposal (중·저준위 방사성폐기물 천층처분시설 근계영역의 2차원 통합성능평가 모델 개발)

  • Bang, Je Heon;Park, Joo-Wan;Jung, Kang Il
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.12 no.4
    • /
    • pp.315-334
    • /
    • 2014
  • Wolsong Low- and Intermediate-level radioactive waste (LILW) disposal center has two different types of disposal facilities and interacts with the neighboring Wolsong nuclear power plant. These situations impose a high level of complexity which requires in-depth understanding of phenomena in the safety assessment of the disposal facility. In this context, multidimensional radionuclide transport model and hydraulic performance assessment model should be developed to identify more realistic performance of the complex system and reduce unnecessary conservatism in the conventional performance assessment models developed for the $1^{st}$ stage underground disposal. In addition, the advanced performance assessment model is required to calculate many cases to treat uncertainties or study parameter importance. To fulfill the requirements, this study introduces the development of two-dimensional integrated near-field performance assessment model combining near-field hydraulic performance assessment model and radionuclide transport model for the $2^{nd}$ stage near-surface disposal. The hydraulic and radionuclide transport behaviors were evaluated by PORFLOW and GoldSim. GoldSim radionuclide transport model was verified through benchmark calculations with PORFLOW radionuclide transport model. GoldSim model was shown to be computationally efficient and provided the better understanding of the radionuclide transport behavior than conventional model.

Analysis of Fire Scenarios and Evaluation of Risks that might Occur in Operation Stage of CAES Storage Cavern (CAES 저장 공동 운영단계에서 발생 가능한 리스크 평가 및 화재 시나리오 분석)

  • Yoon, Yong-Kyun;Ju, Eun-Hye;Seo, Saem-Mul;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.25 no.1
    • /
    • pp.107-114
    • /
    • 2015
  • This study focuses on assessing risks which might occur in operation stage of CAES storage cavern and analyzing fire scenarios for the risk that have been assessed with highest risk level. Risks in operation stage were categorized into upper risk group and lower risk group. Components of upper risk group are technical risk, facility risk and natural disaster risk. Lower risk group is composed of 11 sub-risks. 20 experts were chosen to survey questionnaires. ANP model was applied to analyze the relative importance of 11 sub-risks. Results of risk analysis were compared with risk criterion to set risk priorities, and the highest risk was determined to be 'occurrence of the fire within the management opening'. Three fire scenarios were developed for the highest risk level and FDS (Fire dynamics Simulator) was used to analyze these scenarios. No. 3 scenario which air blows from tunnel into outside atmosphere represented that a rate of smoke spread was the fastest among three fire scenarios and a smoke descended most quickly below the limit line of breathing. Thus, No. 3 scenario turned out to be the most unfavorable condition when operating staffs were evacuated from access tunnel.

A Comprehensive Groundwater Modeling using Multicomponent Multiphase Theory: 1. Development of a Multidimensional Finite Element Model (다중 다상이론을 이용한 통합적 지하수 모델링: 1. 다차원 유한요소 모형의 개발)

  • Joon Hyun Kim
    • Journal of Korea Soil Environment Society
    • /
    • v.1 no.1
    • /
    • pp.89-102
    • /
    • 1996
  • An integrated model is presented to describe underground flow and mass transport, using a multicomponent multiphase approach. The comprehensive governing equation is derived considering mass and force balances of chemical species over four phases(water, oil, air, and soil) in a schematic elementary volume. Compact and systemati notations of relevant variables and equations are introduced to facilitate the inclusion of complex migration and transformation processes, and variable spatial dimensions. The resulting nonlinear system is solved by a multidimensional finite element code. The developed code with dynamic array allocation, is sufficiently flexible to work across a wide spectrum of computers, including an IBM ES 9000/900 vector facility, SP2 cluster machine, Unix workstations and PCs, for one-, two and three-dimensional problems. To reduce the computation time and storage requirements, the system equations are decoupled and solved using a banded global matrix solver, with the vector and parallel processing on the IBM 9000. To avoide the numerical oscillations of the nonlinear problems in the case of convective dominant transport, the techniques of upstream weighting, mass lumping, and elementary-wise parameter evaluation are applied. The instability and convergence criteria of the nonlinear problems are studied for the one-dimensional analogue of FEM and FDM. Modeling capacity is presented in the simulation of three dimensional composite multiphase TCE migration. Comprehesive simulation feature of the code is presented in a companion paper of this issue for the specific groundwater or flow and contamination problems.

  • PDF

Estimation of Safety in Railway Tunnel by Using Quantitative Risk Assessment (QRA를 이용한 철도터널 방재 안전성 평가)

  • Kim, Do-Sik;Kim, Do-Hyung;Kim, Woo-Sung;Lee, Du-Hwa;Lee, Ho-Seok
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.357-367
    • /
    • 2006
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures grow longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest of safety in long tunnel have a growing and the safety standard of long tunnel is tightening. For that reason, at the planning of long tunnel, the optimum design of safety facility in long tunnel for minimizing the risks and satisfying the safety standard is needed. For the reasonable design of long railway tunnel considering high safety, qualitative estimation for tunnel safety is required. In this study, QRA (Quantitative Risk Assessment) technique is applied to design of long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design in long railway tunnel is tarried out to verifying the QRA technique for two railway tunnels. Thus, the inclined and vertical shaft for escape way and safety facilities in long tunnel are planned, and the risks of tunnel safety for each case are estimated quantitatively.

A study on the development of tunnel soundness evaluation system using artificial neural network (인공신경망을 이용한 터널 건전도 평가시스템 개발)

  • 김현우;김영근;이희근
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.48-55
    • /
    • 1999
  • One of the major roles of concrete lining is the supplementary support of ground load. Therefore, if there are cracks or deformation found in the lining, the causes should be carefully examined. Tunnel Soundness Evaluation System (DW-TSES) was developed to meet such requirements. Main facility of the system was intended to find the probable causes on the basis of the apparent changes in lining and the environmental conditions. It also includes facilities for evaluating the soundness of a tunnel and indicating the method for repair or reinforcement. The characteristic feature of damages is used for reasoning in case of deterioration and leakage, and artificial neural network is used in external pressure. This process depends on the results of the case analyses and FDM, which have a collection of the typical features of different types of damages as well as the unusual changes caused by the external pressure. The comparison of the outputs of this system with those of expert's diagnoses draws the following conclusions. 1) Artificial neural network was a suitable tool to find to causes of damages by external pressure. 2) The environmental conditions improved the accuracy in reasoning. 3) The result of finding causes and evaluating soundness was helpful to suggest effective methods concerning tunnel maintenance.

  • PDF

Cause Analysis for Reduced Effect of Sewer Pipe Improvement Project Based On Investigation of Interceptor Sewers (차집관로의 조사 및 분석을 통한 하수관로정비 사업의 효과 감소 원인 분석)

  • Chae, Myungbyung;Bae, Younghye;Kim, Hungsoo
    • Journal of Wetlands Research
    • /
    • v.20 no.3
    • /
    • pp.219-226
    • /
    • 2018
  • Interceptor sewer is installed underground near to the river side mostly ofstate-owned land and the management efficiency of public sewage disposal facilities is decreasing as too much infiltration/inflow(I/I) and river flow to interceptor sewer are caused by broken or deteriorated sewer. This also affects the sewer pipeline project and decreases its efficiency. Therefore, the aim of this study is to investigate interceptor sewer which has influence on the reduction of the project effect. The investigation were performed for three study areas. The study includes the investigation of current condition of interceptor sewer(sewer extension, pipe diameter, pipe type, installed year, installed locations, etc), investigation of inside of sewer by CCTV accompanied by pumping and dredging works where required, investigation of inside of manholes by eyes, calculation of pollutant load using the results of investigation of flow quantity and quality. Multipoint investigations were simultaneously performed for flow quantity at confluence area and other investigations were also performed for flow quantity and BOD for interceptor sewer and comparison of pollutant load, investigation of infiltration/inflow(I/I) caused by deterioration of interceptor sewer. As the result of the study, a main reason for reduced effect of sewer pipe improvement project was analyzed as the low-density sewage and I/I in public seweage treatment Facility due to deteriorated and unmanaged interceptor sewers.

Backfill Materials for Underground Facility with Recycling Materials - Small-Scaled Laboratory Chamber Test and FEM Analysis (재활용재료를 이용한 지하매설물용 뒤채움재 - 모형챔버실험 및 유한요소해석)

  • Lee, Kwan-Ho;Lee, Kyung-Jung
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.3
    • /
    • pp.97-103
    • /
    • 2011
  • In this research, a small-scaled laboratory test and FEM analysis have been carried out to evaluate the feasibility of field construction with couple of recycled materials, such as in-situ soil, water-treatment sludge, and crumb rubbers. A static loading, which simulates the real traffic load, was adopted in lab test. The test was carried out, according to simulated field construction stages, such as excavation, bedding materials and pipe installation, placing and curing of controlled low strength materials, and simulated traffic loading. Couple of measuring instruments were adopted. The maximum vertical and horizontal deformations were 0.83% and 1.09%, during placing the CLSM. The measured vertical and horizontal deformations with curing time were 0.603mm and 0.676mm, respectively. The reduction effect of vertical and lateral earth pressure was relatively big. Also, FEM analysis was carried out to get the deformation, earth pressure and strain of PVC with different Controlled Low Strength Materials(CLSM) materials.

Improvement of Multi-Dimensional Urban Planning System for Urban Regeneration (도시재생 측면에서 입체도시계획의 기능과 제도 개선 방안)

  • Lee, Bum-Hyun;Nam, Seong-Woo;Kim, Young-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.2
    • /
    • pp.516-524
    • /
    • 2019
  • The purpose of this study is to analyze the cases related to the multi-dimensional urban planning and its related systems that can contribute to the urban regeneration as the policies and projects for stereoscopic city increase. Through the case analysis, urban regeneration function and role of multi-dimensional urban planning are identified as connection of places, activation of local economy, expansion of infrastructure and supply of housing. In the institutional sector, private participation is hindered due to the ban on the establishment of the right to hold state property. In addition, it is difficult to utilize the three-dimensional urban space without land securing at a certain rate based on uniform installation standards of the two-dimensional land use plan, and the problem of insufficient interconnection between law and institution is derived. In conclusion, it should actively support and promote the promotion of the three-dimensional facility with the aim of diversifying the regional infrastructure structure and strengthening the urban function. In addition, development of stereoscopic and compound development should be promoted for old urban areas, and parking lots, underground shopping malls, parking lots, etc. should be installed using the subspaces of parks, schools, roads and traditional markets of old residential areas. Finally, cooperation between the central government, the municipalities and the private sector is necessary for the realization of these urban regeneration projects.

An experimental study on the influence of undular bore on the hydraulic stability at Shinwol rainwater storage and drainage system (불규칙 단파가 신월저류배수시설의 수리적 안정성에 미치는 영향에 대한 실험 연구)

  • Oh, Jun Oh
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.5
    • /
    • pp.313-323
    • /
    • 2019
  • Deep Tunnel system is a large-scale urban flood control facility installed underground in order to reinforce the lack of drainage systems in developed cities. In a structure like a deep tunnel system, the undular bore generated in the downstream causes a problem in the hydraulic stability of the tunnel. In this study, to investigate the influence of the undular bore on the hydraulic stability at the "Shinwol rainwater storage and drainage system", under construction for the first time in the country, a hydraulic model experiment was conducted on various flooding inflow scenarios. As a result of the hydraulic model experiment carried out in this study, the undular bore generated downstream is trapped in the pipe while moving to upstream, pushes the compressed air. It is judged that overflow occurred by choking the vertical drop shaft in the process when this compressed air is being exhaust through the upstream vertical drop shaft and blocking flood inflow. In addition, the analysis of velocity of undular bore shows that the undular bore transfers energy, and at this time, the pressure rose in the pipe and the velocity increment occurred of the undular bore. Further studies are needed to predict the size and velocity of undular bore, which plays an important role in the hydraulic stability of the tunnel in the deep tunnel system.

Construct of uncontaminated underground reservoir test facility (청정지하저수지 시험시설의 구축)

  • Lee, Chang Seob;Park, Nam Sik;Jeong, Jae Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.328-328
    • /
    • 2016
  • 우리나라는 생활용수의 대부분을 지표수에 의존하고 있는 실정이다. 그러나 지표수는 가뭄과 같은 기상변화, 수질사고 등으로 물 공급의 안정성에 문제가 되기도 한다. 향후 기후변화는 가뭄의 빈도와 강도를 증대시킬 것으로 파악되므로 수질 및 수량의 문제를 더욱 악화시킬 것으로 예상된다. 이러한 문제점을 해결하기 위해 지표수를 대수층 내에 인공적으로 함양한 뒤 대수층의 자연정화 기능에 의해 여과된 양질의 청정원수를 생산하는 기술을 본 연구에서 현장에 실증 적용하는 시설을 구축하였다. 이러한 기술은 기존의 지하 대수층을 이용하는 강변여과 등이 갖는 장점을 취하고 단점을 보완하였으며 친환경적이며 지속가능한 용수공급뿐만 아니라 청정 원수 확보를 통해 정수처리비용을 절감, 장기간의 가뭄이나 지표수 수질사고 시에 비상용수 공급 등 기존 취수원들과 달리 많은 장점을 갖고 있는 대규모 청정지하저수지 시험시설이다. 청정 지하저수지 기술이 주로 적용되는 지역은 해안지역 또는 하구 델타지역을 대상으로 한다. 해안 또는 델타지역은 해수침투로 인하여 염지하수가 부존되어 있기 때문에 지하수자원 활용에 매우 제한적이다. 따라서 지표수(담수)를 전처리하여 대수층에 인공적으로 함양을 하여 염지하수 대수층 안에 담지하수(담수체)를 형성할 수 있다. 이는 염수와 담수의 밀도차에 의해 희석되지 않는 특성을 이용한 기술이다. 청정 지하저수지 시험시설은 크게 지표수 취수시설, 전처리시설, 주입정, 양수정, 운영시스템으로 나눌 수 있다. 주입정 및 양수정은 원형의 형태로 지하저수지 조성범위 중심부에 9개의 주입정과 외각에 8개의 양수정을 설치하였다. 시험시설의 운영 과정은 하천수를 취수하여 전처리시설에서 탁도를 제거한 후, 피압대수층 염지하수에 동력으로 주입을 한다. 이때 기존에 부존되어 있던 염지하수를 밀어내고 담수체 지하수 형성을 유도한다. 일정기간 주입을 통해 목표 담수체를 만들어 내면 양수정에서 담수를 취수하되, 대수층의 모래자갈층을 일정거리 이동하여 취수하는 방식이다. 즉, 하천수를 대수층에 함양하고, 일정거리를 이동하여 취수하는 ASTR 방식의 대체수자원 확보 기술이다. 시험시설은 통합운영센터를 통해 원격감시 및 각종 제어/계측을 실시하며, 모니터링된 자료는 운영시스템에서 관리한다. 본 연구시설에서는 대수층 주입, 관정폐색, 미생물/지화학 수질반응, 지하수모니터링, 지반변형 등이 주요 핵심 연구를 진행하고 있도록 시설을 구성하였다. 본 시험시설은 2015년 8월 착공하여 2016년 4월에 완공 예정이며, 2016년 3월부터 주입을 시작하여 6개월간 피압대수층에 주입을 실시하고 이후부터 주입과 양수를 병행할 계획이다.

  • PDF