• Title/Summary/Keyword: Underground Excavation

Search Result 844, Processing Time 0.02 seconds

A Simulation Model for the Study of the Territorial Behavior of Subterranean Termites (흰개미 테리토리행동 연구를 위한 시뮬레이션 모델)

  • Jeon, Won-Ju;Lee, Sang-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • Subterranean termites forage by constructing tunnel networks in soil and encounter food resources during tunnel excavation. Some species of termites can travel up to 150 m underground. They often travel to the surface to find wood cellulose to feed their colony, which in turn causes extensive damage to wooden architecture, such as timber-frame houses. This type of damage has been constantly increasing along with global warming because higher temperatures provide an ecological niche for termites. The damage is closely related to termite territory size and distribution. Recently, as a way to research termite control, the necessity of a mathematical model to simulate termite territory formation in relation to damage has increased. So far, however, few studies have been conducted on the development of a model because it is difficult to quantify or characterize the relationship between territorial behavior and field conditions including complicated environmental factors. In the present study, we suggest a simulation model of the territoriality of the Formosan subterranean termites, Coptotermes formosanus (Shiraki), and Reticulitermes flavipes (Kollar), based on empirical data. The model consists of 2 procedures. One describes tunnel network growth for each colony, and the other represents territoriality based on tunnel-tunnel interactions between different colonies. Using the model, we show changes in territorial competition according to the termination probability of tunnel growth.

Stability Estimation of the Pillar between Twin Tunnels Considering Various Site Conditions (다양한 현장조건을 고려한 병설터널 필라의 안정성평가)

  • Kim, Ju-Hwan;Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.27 no.2
    • /
    • pp.109-119
    • /
    • 2017
  • A lot of twin tunnels were modelled with different pillar widths, rock mass classes and stress ratios in order to consider various site conditions, and the stabilities of the pillars were estimated by numerical analyses and scaled model tests. The strength-stress ratios of the pillar were obtained from three different methods which were using the stresses appeared at the middle point, the whole average and the left/right edges of the pillar. The strength-stress ratio of the pillar edges showed relatively conservative values among them, and it was also practically consistent with the tunnel excavating steps comprising the construction sequence analyses which included the partial excavation and the support system. Scaled model tests were also performed to investigate the tunnel stability, where it was found that cracks were progressively generated from the pillar edges toward the middle point of the pillar. Therefore, in order to both prevent the local damage of pillar and conservatively estimate the tunnel stability, it was thought to be an appropriate method using the strength-stress ratio obtained from the left/right edges of the pillar.

A Case Study on the Application of Safely Analysis for the Tunnel Adjacent to the Pier (교각에 근접한 터널의 안정성 평가에 대한 사례 연구)

  • 이선복;윤지선
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2003
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t)=a[1-exp(-bt)].

Performance Evaluation of Conical Picks for Roadheader in Copper Mines (구리광산에 적용된 부분단면굴착기용 국산 코니컬 픽커터의 성능평가 연구)

  • Choi, Soon-Wook;Chang, Soo-Ho;Lee, Chulho;Lee, Gyu-Phil;Bae, Young Hwan;Ha, Tae-Wook
    • Tunnel and Underground Space
    • /
    • v.25 no.6
    • /
    • pp.496-504
    • /
    • 2015
  • Roadheader that excavates ground using pick cutters installed on the cutting head is one of the partial-face machines. A conical cutter among pick cutters is excavation tool decreasing the loss of cutter using tungsten carbide insert at the tip of the cutter and it has been widely used in the roadheaders. In this study, durability performance for three kinds of conical cutters was evaluated in copper mines composed of Manto and conglomerate. After field test, the visual inspection as well as the weight loss measurement of pick cutters was carried out to investigate the damage of pick cutters. In addition, CT scan and SEM were performed to check whether or not crack and apertures in pick cutters. As results, the conical cutter with hardfacing was evaluated as having the best durability performance and it was unable to find cracks in all cutters investigated.

Reinforcing Effect of Pre-Tensioned Rock Bolts in the Jointed Rocks Condition (록볼트 긴장에 의한 수평절리암반의 보강효과)

  • An, Joung-Hwan;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.19 no.5
    • /
    • pp.388-396
    • /
    • 2009
  • Rock bolt is one of the most important supports for tunnelling to prevent excessive ground relaxation at the primary tunnel excavation stage. It forms a ground arch band by confining the ground around a tunnel. Rock bolt has various effects, such as support or hanging effect, internal pressure effect, arching effect, ground improvement effect etc. Most studies on rock bolt focused on the concept of support, but only a few researches on the ground reinforcing effect by pre-tensioning a rock bolts. In this study, large scale model tests are performed to investigate the ground reinforcing effect of rock bolts for regularly jointed rocks. Simple beam model was built to find out the reinforcing effect of jointed rocks, which was reinforced by pre-tensioned rock bolts. Settlement of model beam was analyzed through measuring its sagging for various installation intervals.

Determination of Mode I Fracture Toughness of Rocks Using Wedge Splitting Test (쐐기 분열 시험을 이용한 암석의 모드 I 파괴인성 측정)

  • Ko, Tae Young;Kim, Taek Kon;Lee, Dae Hyuk
    • Tunnel and Underground Space
    • /
    • v.29 no.6
    • /
    • pp.523-531
    • /
    • 2019
  • In the applications of rock mechanics or rock engineering including drill and blast, drilling and mechanical excavation, the fracture toughness is an important factor. Several methods have been proposed to measure the fracture toughness of rocks. In this study, wedge splitting test specimen which is prepared with ease and tested under compression loading was used to obtain mode I fracture toughness of rocks. The equation of stress intensity factor through numerical analysis is proposed from the stress state of crack tip considering both vertical and horizontal loads due to the vertical load acting on the wedge. The validity of the wedge splitting test method was confirmed by comparing the mode I fracture toughness values obtained by the GD and SENB test specimens.

3D Finite Element Analysis of Rock Behavior with Bench Length and Gther Design Parameters of Tunnel (터널의 벤치길이를 중심으로 한 설계변수에 따른 암반거동의 3차원 수치해석)

  • 강준호;정직한;이정인
    • Tunnel and Underground Space
    • /
    • v.11 no.1
    • /
    • pp.30-35
    • /
    • 2001
  • Focusing on the bench length, this paper presents the results of 3-dimensional elafto-plastic FE Analysis un tunnels of full face, mini-bench and short bench excavated in weathered rock. Influences of unsupported span, horizontal to vertical stress ratio, thickness of shotcrete on the behavior of rock and support were a1so studied. Results showed that displacements of mini-bench tunnels responded more sensitively to bench lengths than those of short bench. The effects of bench excavation on upper half displacement increased with longer unsupported span. Horizontal to vertical stress ratio showed a greater influence on displacement and preceding displacement ratio or sidewall rather than those of crown and invert.

  • PDF

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

A New Method for Elasto-Plastic Analysis of Concrete Lining Installed in a Deep Circular Tunnel (심부 원형터널에 시공된 콘크리트 라이닝의 새로운 탄소성해석법)

  • Lee, Youn-Kyou;Park, Kyung-Soon;Song, Won-Kyong;Park, Chul-Whan;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.19 no.4
    • /
    • pp.355-365
    • /
    • 2009
  • This paper proposes an elasto-plastic finite difference method which is useful for the stability evaluation of concrete lining installed in a deep circular tunnel. Mohr-Coulomb criterion is assumed for the condition of yielding in both the rock mass and concrete lining. In order to take into account the installation delay of lining after the excavation, the outer boundary pressure acting on the lining was calculated with the consideration of the convergence occurred before the lining installation. The distributions of stress and displacement in the rock mass and lining were calculated based on the method proposed Lee & Pietruszczak (2008). The applicability of the proposed method was demonstrated by conducting the elasto-plastic analysis of concrete lining supporting an imaginary compressed air storage tunnel. The analysis result revealed that the exact determination of the boundary pressures acting on the concrete lining is of importance in the stability analysis of concrete lining.

A Case Study of Tunnel Stability due to the Shallow Shaft and Change Penetrating Location (터널 갱구부 저토피 및 관통부 변경에 따른 안정성 검토 사례 연구)

  • Lee, Saik;Choi, Youngchul;Jung, Wooyong;Kim, Kookhan;Kim, Dongin
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.87-98
    • /
    • 2013
  • Around 70% of Korea is mountainous, an increase in tunnel construction. It's due to the growing interest of the public for the environment and land required for the road construction is very scarce. During construction of 'Daedong 1 tunnel' in the expressway expansion project between Naengjeong and Busan, there are shallow shaft due to this tunnel located in the valley and the shafts are separated, and penetrating location change was inevitable for construction was delayed because of complaint. So, we change the position of the penetrating by applying multi-channel TSP, and conducted a stability analysis. The analysis results showed that there is no problem on the stability of the tunnel. To secure the construction of additional stability, We installed instrument, performed mechanical excavation, added reinforcement at shallow shaft and conducted bench cut.