Distance between the Parallel Shield tunnel and Application (병렬 쉴드터널의 이격거리와 적용사례)

  • Kwak Chul-Hong;Kim Jae-Young;Kim Dong-Hyun;Lee Du-Hwa;Lee Seung-Bok;Kim Eung-Tae;Shim Jai-Beom
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.225-232
    • /
    • 2005
  • The construction of parallel tunnel by using the shield TBM method was increased recently. Accordingly the application and the propriety of the parallel shield TBM tunnels were studied through domestic and foreign construction cases herein. Also the behavior of tunnel structure and ground was evaluated by a numerical analysis with various ground conditions and the distance between the parallel tunnels. As a result, it was concluded that a deep investigation as well as a ground reinforcement was required with a ratio(L/D) of the distance between the parallel tunnels(L) to tunnel outer diameter(D) less than 0.5 because the Interference phenomenon was expected to occur. And the appropriateness of the application method of parallel shield TBM tunnel was validated through the 2-dimensional numerical analysis simulated the process of excavation after the ground reinforcement in the starting area of the OOO construction site with the ratio(L/D) of 0.35.

  • PDF

Laboratory considerations about frictional force on pipe surface when slurry machine is used

  • Khazaei Saeid;Shimada Hideki;Kawai Takashi;Yotsumoto Jyunichi;Sato Iwao;Matsui Kikuo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.214-220
    • /
    • 2003
  • Pipe jacking is a name for a method to excavate a tunnel by pushing pipe into the ground from an especial pit. Size of tunnels in this method is different from under 900mm (microtunneling) to more than 3,000mm. Method of excavation is also different from hand digging to use of any kind of tunnel boring machines such as slurry and earth pressure balance (EPB) machines. Slurry pipe jacking was firmly established as a special method for the nondisruptive construction of the underground tunnels in urban area. During the pipe jacking and microtunneling process, the jacking load is an important parameter, controlling the pipe wall thickness, need to and location of intermediate jacking station, selection of jacking frame and lubrication requirements. The main component of the jacking load is due to frictional resistance. In this paper the skin friction between pipe surface and surrounding condition also lubricant quality based on a few fundamental tests, were considered. During this study unconfined compressive strength test, dynamic friction measurement test and direct shear box test were raised for one of the largest diameter slurry pipe jacking project in Fujisawa city in Japan. It could be concluded that in slurry pipe jacking, prediction of frictional forces are mainly dependent on successful lubrication, its quality and lubricant strength parameters. Conclusions from this study can be used for the same experiences.

  • PDF

Analysis for Measuring Displacement of Tunnel Face using Horizontal Inclinometer (터널 시공 중 수평경사계를 이용한 변위 분석)

  • Jang, Won-Yil;Yang, Hyung-Sik;Chung, So-Keul
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.428-434
    • /
    • 2007
  • Displacement of tunnel face is important issues for the evaluation of tunnel safety. In this study, conventional convergence and displacement data measured from horizontal inclinometer were analyzed to investigate the trend and characteristics of tunnel deformation during construction. Trend of measured displacement agreed with general understanding of tunnel deformation prior to excavation. It shows that displacement measured from horizontal inclinometer can be used to preestimate the total deformation of tunnel.

A Database to Estimate TBM Manufacturing Specifications and Its Statistical Analysis (TBM 제작 사양을 추정하기 위한 데이터베이스의 구축과 통계분석)

  • Chang, Soo-Ho;Park, Byungkwan;Lee, Chulho;Kang, Tae-Ho;Bae, Gyu-Jin;Choi, Soon-Wook
    • Tunnel and Underground Space
    • /
    • v.27 no.5
    • /
    • pp.271-281
    • /
    • 2017
  • Generally, TBM specifications have been empirically designed by the know-hows of its manufacturers. Since they govern the excavation performance and the cost of TBMs, it is very crucial to reliably determine them in the design stage of TBMs. In this study, a database consisting of TBM data collected from a various kinds of TBM tunnel projects was built to propose the statistical correlations for estimating TBM main specifications. From the statistical analyses, TBM outer diameters are found to have a strong effect on the TBM specifications such as thrust, torque and cutterhead driving power, which are much more important than TBM types and ground conditions.

SURFACE DEFORMATION MONITORING USING TERRASAR-X INTERFEROMETRY

  • Kim, Sang-Wan;Wdowinski, Shimon;Dixon, Tim
    • Proceedings of the KSRS Conference
    • /
    • 2008.10a
    • /
    • pp.422-425
    • /
    • 2008
  • TerraSAR-X is new radar satellite operated at X-band, multi polarization, and multi beam mode. Compared with C-band or L-band SAR, the X-band system inherently suffers from more temporal decorrelation, but is more sensitive to surface deformation monitoring due to short wavelength (3.1 cm) and high spatial resolution (1m-3m). It is generally expected that sensitivity to estimate surface movement using TerraSAR-X will be increased by the factor of 10, compared to current C-band system with low spatial resolution such as ERS-2, Envisat. Many urban areas are experiencing land subsidence due to water, oil and natural gas withdrawal, underground excavation, sediment compaction, and so on. Monitoring of surface deformation is valuable for effectively limiting damage areas. In addition high accuracy and spatially dense subsidence map can be achieved by X-band InSAR observation, promoting identification and separation of various subsidence processes and leading to enhanced understanding via mechanical modeling. In this study we will introduce some initial InSAR results using new TerraSAR-X SAR data for surface deformation monitoring.

  • PDF

A Numerical Study on the Behavior of Steel Pipes in Umbrella Arch Method (Umbrella Arch 공법 적용시 강관의 거동에 관한 수치해석적 연구)

  • 차민웅;이승도;문현구
    • Tunnel and Underground Space
    • /
    • v.14 no.1
    • /
    • pp.26-34
    • /
    • 2004
  • The effectiveness of UAM is generally accepted, but there has not been much rigorous study on UAM and its mechanical support mechanism is yet to be established. Also, most of UAM installations depend on empirical judgement rather than on engineering knowledge. In this study, an attempt to confirm the support effects and to understand the support mechanism of UAM has been made by analyzing the mechanical behavior of umbrella pipes installed in various ground conditions. The effects of overburden thickness, pipe size, overlap length and the placement of steel arch are studied using a three-dimensional finite element method. From the numerical parametric study, the support mechanism of UAM has been confirmed by analyzing the structural forces in the umbrella pipes due to the excavation.

A Study on the Behaviour Modes of the Face and Unsupported Span for Weak Rock Tunnel (연암터널의 막장 및 무지보 구간의 거동형태에 관한 연구)

  • Lee, Young-Zoo;Kim, Chang-Yong;Kim, Kwang-Yeom;Schubert, Wulf
    • Tunnel and Underground Space
    • /
    • v.17 no.1 s.66
    • /
    • pp.9-16
    • /
    • 2007
  • The influence of round length on the tunnel stability and construction cost is well acknowledged by many researchers and engineers but the coherent procedure is not available for its determination. In this study, the behaviour modes of the face and unsupported span was investigated for weak rock tunnel by a small scale model test, PFC3D and FDM analyses in consideration of the round length. Total five types of behaviour modes are defined and quantitative estimation of the behaviour modes was established in terms of the safety factor for the face stability and the conditional chart. Although the proposed method has some restrictions, this method can provide useful information for the optimization of the round length and excavation, especially in design stage.

A study on the determination of shear strength and the support design of pre-failed rock slope (일차파괴된 암반사면의 전단강도 및 보강설계법 고찰)

  • 조태진;김영호
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.104-113
    • /
    • 1995
  • Shear strength of the discontinuity on which the pre-failure of rock slope was occurred during surface excavation was measured through the direct shear test using core samples obtained in-situ. Internal friction angle was increased as the roughness of discontinuity surface(JRC) was increased. Results of the tilt test using core samples of higher JRC also showed very similar trend as those of the direct shear test. When the samples replicated from natural cores were used int he tilt test, results of friction angles showed almost perfect continuation of the residual friction angles from the direct shear test. However, when the gouge material existed in the discontinuity the internal friction angle strongly depended upon the rate of filling thickness to the height of asperity irrespective of the JRC. Based on the results of both direct shear test and tilt test internal friction angle and cohesion of discontinuity, which reflect the in-situ conditions fo pre-sliding failure and also can be used for the optimum design of support system, were assessed. Two kinds of support measures which were expected to increase the stability of rock slope were considered; lowering of slope face angle and installation of rock cable. But, it was found that the first method might lead to more unstable conditions of rock slope when the cohesion of discontinuity plane was negligibly low and in that case the support systems of any kind which could exert actual resisting force were needed to ensure the permanent stability of rock slope.

  • PDF

Measurement of Tunnel Arch Settlements Ahead of and Behind the Tunnel Face Using a Horizontal Inclinometer and Settlement Pins (수평경사계와 천단침하계에 의한 터널막장 전후방의 천단침하 계측)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.120-129
    • /
    • 2013
  • It is important to measure the displacement behind and ahead of a tunnel face during construction for evaluating mechanical stability by comparing it to a displacement criteria set by tunnel designers. The 30 m long horizontal inclinometer was installed frontward from the tunnel face and the displacement occurred ahead of a tunnel face during excavation was measured by using it. Tunnel arch settlements behind tunnel face were surveyed using a settlement pins on the arch. So total settlement and longitudinal displacement curve were obtained combining settlement measured by both the horizontal inclinometer ahead of tunnel face and the settlement pins behind the tunnel face.

Analysis of Deformation Behavior of Underground Caverns in a Discontinuous Rock Mass Using the Distinct Element Method (개별요소법을 이용한 불연속 암반내 지하공동의 변형 거동 해석)

  • Jung, Wan-Kyo;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.23 no.A
    • /
    • pp.69-81
    • /
    • 2003
  • Numerical analysis is important for the design, construction and maintenance of large caverns. The rock mass contains generally discontinuities such as faults, joints and fissures. The mechanical behavior and geometric characteristics of these discontinuities would have a significant impact on the stability of the caverns. In this research the Distinct Element Method(DEM) was used to analyze the structural stability of the large cavern. The Barton-Bandis Joint Model (B-B J.M) was used as a constitutive model for the joint. In addition, two different cases 1) analysis with a support system and 2) analysis with no support system, were analyzed to optimize a support system and to investigate reinforcing effects of a support system. The most significant parameters of in-situ stress, JRC of in-situ natural joints, and spatial distribution characteristics of discontinuities were acquired through field investigation. Displacement (horizontal, joint shear), maximum joint opening, maximum and minimum principal stresses, range of relaxed zone, rockbolt axial forces and shotcrete stresses were calculated at each excavation stage. As a result of analysis the calculated values proved to be under the allowable value Rockbolts also proved to be an efficient support measure to control joint shear displacement which had significant effects on extending the relaxed zone. As a consequence, the structural stability of the cavern was assured with an appropriate support system.

  • PDF