• Title/Summary/Keyword: Underground Area

Search Result 1,151, Processing Time 0.023 seconds

A Study on the Basement Residential Planning of Consider the Outdoor Environment (실외 환경을 고려한 지하층 주거 계획에 관한 연구)

  • Kwon Hwang-Soo;Lee Min-Sup
    • Journal of the Korean housing association
    • /
    • v.16 no.4
    • /
    • pp.1-7
    • /
    • 2005
  • In this study aim at searching for the basement residential planning of considering outdoor spaces. It look after research results, there should be necessary for the inflow of outdoor environment factors. This basement planning is core's area expending, or installing expended dry areas and acquiring side open spaces, installing arcades, installing atrium or court yard, utilizing maisonette spaces, activating pilotis on ground floors, openning main hall, earth sheltering method, etc. These should be improvement for easy step to change basement floors easily through underground floor extend, major repair, use change of present buildings and needs to the idea through architectural design competition.

A STUDY ON THE CONSTRUCTION OF UNDERGROUND DISTRIBUTION AT LARGE HOUSING AREA (대단위 텍지개발지역 지중배전설비 구축에 관한 고찰)

  • Lee, Young-Seop;Yi, Sue-Muk;Jeong, Jung-Ik;Ryu, Seung-Pyo
    • Proceedings of the KIEE Conference
    • /
    • 2005.05b
    • /
    • pp.64-66
    • /
    • 2005
  • 대규모 택지지역등에 전력을 공급하기 위하서는 정확한 수요예측과 이에 따른 배전선로 통구성, 설계, 시공, 공사관리 등의 복합적인 업무가 수반된다. 대부분의 택지개발지역은 환경의 조화를 위하여 지중배전설비로 구축하는 것이 일반적이다. 택지개발지역내 배전설비 구축은 새로운 도화지에 그림을 그려야 함으로 10년 앞을 내다보는 안목으로 시행하여야 할 것이며 이에 택지개발지역의 지중배전설비 구축시의 설계 및 시공시의 착안사항에 대하여 기술하였다.

  • PDF

The main considerations in the design and safety assessment case study for Deep & Large size of Tunnel station (대심도 대단면 터널정거장 설계시 주요고려사항 및 안정성 평가에 대한 사례 연구)

  • Jang, Sun-Jong;Hong, Jong-Wan;Jeon, Ki-Chan;Kim, Young-Min;Paik, Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.462-469
    • /
    • 2011
  • The design of high-depth and large-section tunnel facilities has been increased lately. The purpose of the design is to avoid inference of existing facilities, enhance public relations and reducing the size of the station, which is advantageous for effective use of underground spaces. Diverse downtown tunnel experience, advanced excavation equipment, reinforcement methods, monitoring technologies and numerical analysis made the design possible. This paper is to introduce the design of high-depth and large-section tunnel facilities via Gimpo airport area of Deagok-Sosa railway BTL project of double-tracking.

  • PDF

The Occupant Load Density of Sunken Area in Multiple Occupancy Building with Underground Facility (지하연계복합건축물의 선큰 재실자밀도 분석)

  • Kim, Woon Hyung;Kim, Jong Sung;Lee, Yong Jae
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2013.04a
    • /
    • pp.80-81
    • /
    • 2013
  • 최근 제정 시행되고 있는 지하연계 복합건축물에 대한 다양한 연구가 진행되고 있다. 그러나 화재위험성이 높은 지하 공간의 경우, 아직까지 관련 규정의 근거가 미약하여 현실적인 피난안전 설계에 어려움을 가지고 있다. 본 연구에서는 피난 계획을 위한 로우 데이터를 확보하고자 현재 사용 중인 선큰을 대상으로 실제 유동인구를 측정하여 재실자 밀도를 분석하였다. 선큰으로 연결되는 출입구들의 유동인구와 함께 유동계수를 측정하였으며 선큰내의 재실자 밀도 산정을 통하여 선큰의 대피기능을 위한 연구 진행의 토대를 마련하였다.

  • PDF

Earth Pressure Distribution on Retention Walls in the Excavation of Multi -Layered Ground (다층지반 굴착시 토류벽에 작용하는 토압분포)

  • 이종규;전성곤
    • Geotechnical Engineering
    • /
    • v.9 no.1
    • /
    • pp.59-68
    • /
    • 1993
  • In deep excavations for creation of underground spaces, it would be difficult to predict earth pressure, especially multilayered ground including rock strata. The earth pressures and displacements on the retention walls are measured by load cell, strain gauge and inclinometer which were installed at struts or anchors at 4 deep excavation sites in Seoul area. In this paper, the measured earth pressure from the struts or anchors are compared with Peck's empirical values, and the coefficient of the earth pressures for each strata and horizontal wall displacement are investigated. The coefficient of earth pressure distribution, a(0.65zka), in the flexible and the rigid walls was about 74% and 88% of Peck's value respecitively. The measured earth pressure distributions for the 4 sites showed about 70%∼80% of Peck's empirical values and the average earth pressure coefficients based on the measured data were 0.3 for the felted layer, 0.23 for the weathered rock and 0.19 for the weak rock. The maximum w리1 displacements were found to be less 0.2% of excavation depth.

  • PDF

Application of New Back Analysis Method for Landslide around Portal (터널 갱구부 주변의 산사태를 고려한 역해석법에 관한 검토)

    • Tunnel and Underground Space
    • /
    • v.8 no.1
    • /
    • pp.46-52
    • /
    • 1998
  • The author conducted new back analysis method using monitoring data to a landslide which occurred around portal. In this case, because the tunnel being located under the sliding plane of the landslide, calculated value from the ordinary back analysis in which considered only stress release by the tunnel excavation didn't fit the measured value. Then, in the new method, a body force as the movement of the landslide mass was added to the ordinary back analysis and good results were obtained. Furthermore, the author carried out stability analysis of the landslide with the data of the back analysis and examined the loosened area and decreasing og the sliding plane strength due to the tunnel excavation.

  • PDF

A Study on the In-Situ Measurement of the Deformation and the Back Calculation of the Load in the Mine Roadway Over-Stressed Rocks (중지압 운반 갱도내 변형계측 및 하중역산에 관한 연구)

  • Cho, Young-Soo;Kim, Hong-Woo;Shin, Hee-Soon;Chung, So-Keul;Lee, Hi-Keun
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.40-49
    • /
    • 1993
  • In this study, the indirect estimation method of the support load which is based upon the integrated measuring technique suggested by Kovari was applied to the calculation of support load in the mine roadway. Four test supports were installed in the area where they had to be replaed. Two of those were GI-130 rigid supports and the others were U-26 yieldable supports. The vibrating wire strain gages which were attached inpairs on the steel arch support were used to provide an accurate measurement. Bending moments and normal forces obtained from strain gage pairs were used to calculate the support load. This method was also verified by laboratory bending tests. The results obtained from the back-calculction method showed relatively good agreement with the measured convergence for each crossection.

  • PDF

Comparison of Displacement of the Braced Retaining Wall by Developed Elasto-Plastic Analysis (개선된 탄소성 해석을 이용한 버팀지지 흙막이벽의 거동비교)

  • Shin, Jin-Whan;Kim, Dong-Shin
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.112-118
    • /
    • 2004
  • Recently, when being constructed the large structures, the deep excavations have performed to utilize the underground space. As the ground excavation is deeper, the damage of the adjacent structure and the ground is frequently occurred. the Analysis of the retaining structures is necessary to safety of the excavation works. There are many methods such as elasto-plastic theory, FEM, and FDM to analyze the displacement of the retaining structure. In this thesis, GEBA-1 program by the Nakamura-Nakajawa elasto-plastic method was developed. The lateral displacement of the wall was analyzed by the developed program GEBA-1, SUNEX, and EXCAD, and compared with the measured displacement bye the Inclinometer. The monitored fields were three excavation work site in S-I, S-II, and S-III area. Excavation method of each site is braced retaining wall using H-pile. Excavation depth is 14m, 14m, and 8.2m.

HFCT for Diagnosing Partial Discharge in Middle Joint Box of 154kV Grade (154kV급 중간접속부내의 부분방전 진단을 위한 HFCT 적용)

  • Lee, Jung-Soo;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.214-217
    • /
    • 2008
  • To detect partial discharge of 154kV joint box, we have made experiment by using the HFCT sensor. Generally the signals which are detected in partial discharge test of underground power transmission cable are accompanied with both noises of high voltage and noises of surrounding Power cable. The most noise in near to end part of joint box is corona, beside other noises flowed from surrounding area. Partial discharge test is difficulty due to these noises. First, we test reliability on both injection of calibration signal in NJB and removal of low frequency. After that, we had analyzed frequencies by measuring signals in IJB with 300[m] distance from NJB. Also we had measured S/N ratio by using the indirected injection method of calibration signal in IJB. In this experiment, two measurement methods were difference of detection acquisition, but these had the equal frequency properties.

  • PDF

A Study fo rthe determination of optimum cutangle for the heavily jointed rock slope (절리가 심하게 발달된 암반사면의 최적 절취각 고찰)

  • 홍예성;조태진;한공창
    • Tunnel and Underground Space
    • /
    • v.6 no.2
    • /
    • pp.166-174
    • /
    • 1996
  • Stability of rock slope is greatly affected by the geometry and strength of discontinuities developed in the rock mass. In this study an analytical method which is capable of analyzing the effect of relative orientation between the discontinuities and the slope face on the safety of slope by assessing their vector components was used to evaluate the stability and the maximum cut-angle for the proposed slope design. The results of computerized vector analysis revealed that slope area under investigation might be divided into 3 sections of different face directions. The safety factors for benches in each 3 sections were calculated using the limit-equilibrium theory. Then, by utilizing the concept of probabilistic risk analysis, the susceptibility of entire slope failure was estimated. Based on the distribution of safety factor in each bench, the maximum cut angle of each section could be selected differently ot achieve the permanent stability of the entire slope.

  • PDF