• Title/Summary/Keyword: Under voltage load shedding scheme

Search Result 11, Processing Time 0.019 seconds

A Study on the Application of Under Voltage Load Shedding Scheme in Line Contingency considering Motor Load (모터부하를 고려한 상정사고 발생 시 저전압 부하차단 적용 방안에 대한 연구)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.1
    • /
    • pp.21-26
    • /
    • 2017
  • Failure of high-voltage transmission line, which is responsible for large-scale power transmission, can be reason for system voltage instability. There are many methods to prevent voltage instability like adjustment of equipment, the generator voltage setting, and load shedding. Among them, the load shedding, have a problem of economic loss and cascading effect to power system. Therefore, the execution of load shedding, amount and timing is very important. Conventionally, the load shedding setting is decided by the preformed simulation. Now, it is possible to monitor the power system in real time by the appearance of PMU(Phasor Measurement Unit). By this reason, some of research is performed about decentralized load shedding. The characteristics of the load can impact to amount and timing of decentralized load shedding. Especially, it is necessary to consider the influence of the induction motor loads. This paper review recent topic about under voltage load shedding and compare with decentralized load shedding scheme with conventional load shedding scheme. And simulations show the effectiveness of proposed method in resolving the delayed voltage recovery in the Korean Power System.

Multi-level UnderVoltage Load Shedding Scheme Considering Rate of Change of Voltage for Voltage Stability (전압 변동률을 고려한 수도권 전압 안정화 다단계 부하차단 적용 방안)

  • Lee, Yun-Hwan;Kim, Tae-Gyun;Kim, Ji-Hun;Lee, Byong-Jun;Kang, Bu-Il;Cho, Jong-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2335-2341
    • /
    • 2009
  • High technique growth of modem times and high industrial facility in consequence of buildings demand for electric power of an extensive scale with stability supply and maintenance of high quality. But, power system always have risk of network contingency. When power system break out disturbance, it circumstantially happen like uncontrolled loss of load developing from of cascading. Severely which would be raised wide area blackout, plan to prevent, which make stability through a little of load shedding and multi-level UnderVoltageLoadShdding should work. This paper presents target, sensitivity of bus voltage have choose appropriating load shedding location and load shedding decision making logic with considering rate of change of voltage have studied multi-level under voltage load shedding scheme. Calculation of rate of change of voltage applied method of least square. As a result, we are studied an dynamic analysis of 2008 summer peak data. We have been known that network analysis is a little development and developing UnderVoltageLoadShedding scheme.

Utilizing Under Voltage Load Shedding Strategy to Prevent Delayed Voltage Recovery Problem in Korean Power System

  • Lee, Yun-Hwan;Oh, Seung-Chan;Lee, Hwan-Ik;Park, Sang-Geon;Lee, Byong-Jun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.60-67
    • /
    • 2018
  • The presence of induction motor loads in a power system may cause the phenomenon of delayed voltage recovery after the occurrence of a severe fault. A high proportion of induction motor loads in the power system can be a significant influence on the voltage stability of the system. This problem referred to as FIDVR(Fault Induced Delayed Voltage Recovery) is commonly caused by stall of small HVAC unit(Heating, Ventilation, and Air Conditioner) after transmission or distribution system failure. This delayed voltage recovery arises from the dynamic characteristics associated with the kinetic energy of the induction motor load. This paper proposes the UVLS (Under Voltage Load Shedding) control strategy for dealing with FIDVR. UVLS based schemes prevent voltage instability by shedding the load and can help avoid major economic losses due to wide-ranging cascading outages. This paper review recent topic about under voltage load shedding and compare decentralized load shedding scheme with conventional load shedding scheme. The load shedding strategy is applied to an actual system in order to verify the proposed FIDVR mitigation solution. Simulations demonstrate the effectiveness of the proposed method in resolving the problem of delayed voltage recovery in the Korean Power System.

A Study on Decentralized under Voltage Load Shedding Scheme for Preventing Wide-area Black Out (광역정전 예방을 위한 분산형 부하 제어 방안에 대한 연구)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.1
    • /
    • pp.1-6
    • /
    • 2014
  • An electric power system sometimes fails because of disturbances that occur unexpectedly, such as the uncontrolled loss of load that developed from cascading blackout. Which make stability through a little of under voltage load shedding should work. The development of phasor measurement unit(PMU) makes network supervision possible. The information obtained from PMU is synchronized by global positioning system(GPS). There are many real-time algorithms which are monitoring the voltage stability. This paper presents the study on the VILS(Voltage Instability Load Shedding) using PMU data. This algorithm computes Voltage Stability Margin Index(VSMI) continuously to track the voltage stability margin at local bus level. The VSMI is expressed as active and reactive power. The VSMI is used as an criterion for load shedding. In order to examine the algorithm is effective, applied to KEPCO system.

Using the Under Voltage Load Shedding for Stability Enhancement of Power Systems Considering Induction Motor Load (유도전동기 부하 고려 시 저전압 부하차단을 이용한 전력계통 안정도 향상 방안)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.1
    • /
    • pp.1-6
    • /
    • 2016
  • Recently, proportion of the induction motor load is gradually increased. When a contingency in the power systems, it has been discovered phenomenon that the voltage is delayed recover caused mechanical characteristics of the induction motor load. It can be a serious impact on the voltage stability of the power system considering induction motor load. The scheme to mitigate this phenomenon tripping off the motors to prevent voltage drop and delayed voltage recovery on the load demand side. Fault induced delayed voltage recovery phenomenon is caused by stalling of small induction motor load in transmission level contingencies. In this paper, fault induced delayed voltage recovery phenomenon mitigation method implementation under voltage load shedding on the korean power system considering induction motor load.

Study on the Development of Load Shedding Scheme for Improving Voltage Stability of Seoul Metropolitan Area using Synchro-phasor Data (Synchro-Phasor 데이터를 이용한 수도권 전압 안정화 제어 스킴 개발에 관한 연구)

  • Shin, Jeong-Hoon;Nam, Su-Chul;Baek, Seung-Mook;Lee, Jae-Gul;Moon, Seung-Pil;Kim, Tae-Kyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1530-1539
    • /
    • 2010
  • Recent technology advancement related to computer & communication and measuring devices allows system operators to adopt more intelligent monitoring and control systems to their power systems in order to prevent massive system blackout. Among them, wide-area monitoring and control(WAMAC) system based on synchro-phasor technology has been widely applied to power systems for their own purposes. In this paper, the study on the development of load shedding scheme to improve voltage stability in KEPCO system is introduced. Summary of WAMAC technology being developed and applied in the world through extensive literature survey is proposed. And methodology to develop voltage stability index and multi-step load shedding scheme based on synchro-phasor data is also presented.

Implementation of Under Voltage Load Shedding for Fault Induced Delayed Voltage Recovery Phenomenon Alleviation

  • Lee, Yun-Hwan;Park, Bo-Hyun;Oh, Seung-Chan;Lee, Byong-Jun;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.406-414
    • /
    • 2014
  • Significant penetration of induction motor loads into residential neighborhood and commercial regions of local transmission systems at least partially determine a vulnerability to a fault induced delayed voltage recovery (FIDVR) event. Highly concentrated induction motor loads with constant torque could stall in response to low voltages associated with system faults. FIDVR is caused by wide spread stalling of small HVAC units (residential air conditioner) during transmission level faults. An under voltage load shedding scheme (UVLS) can be an effective component in a strategy to manage FIDVR risk and limit the any potential disturbance. Under Voltage Load Shedding take advantage of the plan to recovery the voltage of the system by shedding the load ways to alleviation FIDVR.

Application of Multi-step Undervoltage Load Shedding Schemes to the KEPCO System

  • Shin, Jeong-Hoon;Nam, Su-Chul;Lee, Jae-Gul;Choy, Young-Do;Kim, Tae-Kyun;Song, Hwa-Chang
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.4
    • /
    • pp.476-484
    • /
    • 2009
  • This paper deals with improvements to the special protection schemes (SPS) which have been applied to the low probability and high impact contingencies in the Korea Electric Power Corporation (KEPCO) system since 2004. Among them, the SPS for voltage instability in the Seoul metropolitan area is considered in this paper, and is a form of event-based undervoltage load shedding with a single-step scheme. Simulation results based upon a recent event that occurred on 765kV lines show that the current setting values of the SPS have to be revised and enhanced. In addition, by applying response-based multi-step undervoltage load shedding (UVLS) schemes to severe contingencies in the system, more effective results than those of the existing single-step SPS can be obtained. Centralized and distributed UVLS schemes are considered in the simulation. ULTC-based load recovery models and over excitation limiters (OXL) for the KEPCO system are also included in the long-term voltage instability studies.

A Special Protection Scheme Against a Local Low-Voltage Problem and Zone 3 Protection in the KEPCO System

  • Yun, Ki-Seob;Lee, Byong-Jun;Song, Hwa-Chang
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.3
    • /
    • pp.294-299
    • /
    • 2007
  • This paper presents a special protection scheme, which was established in the KEPCO (Korea Electric Power Corporation) system, against a critically low voltage profile in a part of the system after a double-circuit tower outage. Without establishing the scheme, the outage triggers the operation of a zone 3 relay and trips the component. This sequence of events possibly leads to a blackout of the local system. The scheme consists of an inter-substation communication network using PITR (Protective Integrated Transmitter and Receiver) for acquisition of the substations' data, and under-voltage load shedding devices. This paper describes the procedure for determining the load shedding in the scheme and the experiences of the implementation.

Determination of Reasonable Amounts of Under-Voltage Load Shedding for 765kV T/L According to the Power System Reliability Standards (전력계통 신뢰도 기준 분석을 통한 765kV 선로사고에 대한 부하차단 적정량 산정에 관한 연구)

  • Yoo, Je-Ho;Hur, Jin;Cha, Jun-Min;Kim, Tae-Gyun;Kang, Bu-Il;Cho, Soo-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.6
    • /
    • pp.845-851
    • /
    • 2015
  • Load shedding is a last measure to avoid nationwide cascading collapses of power system by removing the pre-determined amount of loads from the main grid. In Korea, SPS(Special Protection System) is prepared to keep the power system stability from the extreme contingency of the critical transmission line losses. Among them, we need to pay attention to 765kV T/L’s because they have great influence on the total system stability. According to the present SPS operating guide, the total loads of 1,500MW should be removed through 2 step under-voltage load shedding(UVLS) scheme in case of 765kV T/L’s contingencies. However, it is not clear to defined how to determine the typical load reduction amounts for each case. This paper proposes a method to estimate appropriate amounts of load shed for 765kV T/L’s contingencies by analyzing the relevant national and international standards.