• Title/Summary/Keyword: Turbidity flow control

Search Result 24, Processing Time 0.022 seconds

Impact assessment for water pressure and turbidity occurrence by changes in water flow rate of large consumer at water distribution networks (상수도관망에서 대수용가의 유량변화에 따른 수압 및 탁도발생 영향평가)

  • Choi, Doo Yong;Kim, Ju-Hwan;Choi, Min-Ah;Kim, Do-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.3
    • /
    • pp.277-286
    • /
    • 2014
  • Water discolouration and increased turbidity in the local water service distribution network occurred from hydraulic incidents such as drastic changes of flow and pressure at large consumer. Hydraulic incidents impose extra shear stresses on sediment layers in the network, leading to particle resuspension. Therefore, real time measuring instruments were installed for monitoring the variation of water flow, pressure, turbidity and particulates on a hydrant in front of the inlet point of large apartment complex. In this study, it is attempted to establish a more stable water supply plan and to reduce complaints from customers about water quality in a district metering area. To reduce red or black water, the water flow monitoring and control systems are desperately needed in the point of the larger consumers.

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF

Feasibility Study of UV-Disinfection for Water Reuse of Effluent from Wastewater Treatment Plant (용수재이용을 위한 하수처리 유출수의 UV 소독 효율 연구)

  • 윤춘경;정광욱;함종화;전지홍
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.2
    • /
    • pp.126-137
    • /
    • 2003
  • The feasibility study of UV-disinfection system was performed for disinfection of effluent from wastewater treatment plant. Three low-pressure UV lamps of 17, 25, and 41 W were examined with various flow rates. Low-pressure UV lamps of 17W were examined with various turbidity, DOM (dissolved organic matter), and SS (suspended solid). The pilot plant was a flow-through type UV-disinfection system, and the range of exposure time varied from 5 to 40 seconds, turbidity from 0 to 40 NTU, DOM from 0 to 30 mg/L, and SS from 10 to 40 mg/L. The 41W lamp demonstrated complete disinfection showing no survival ratio in all the experimental conditions, and generally 17W and 25W lamps also showed high removal ratio over 97%. For the same UV dose (UV intensity times exposure time), high intensity-short exposure conditions showed better disinfection efficiency than low intensity-long exposure conditions. While the effects of turbidity and DOM were not apparent, the effects of SS was significant on the disinfection efficiency which indicates that SS control before UV-disinfection appears to be necessary to increase removal efficiency. Considering characteristics of effluent from existing wastewater treatment plants, cost-effectiveness, stable performance, and minimum maintenance, the flow-through type UV-disinfection system with high intensity and low-pressure lamps was thought to be a competitive disinfection system for wastewater reclamation.

Effect of Selective Withdrawal on the Control of Turbidity Flow and Its Water Quality Impact in Deacheong Reservoir (선택취수에 따른 대청호 탁수 조절효과 및 수질영향 분석)

  • Jung, Yong-Rak;Liu, Huan;Kim, Yu-Kyung;Ye, Lyeong;Chung, Se-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.8
    • /
    • pp.601-615
    • /
    • 2007
  • A selective withdrawal method has been widely used to control the quality of water released from a stratified reservoir and to improve downstream ecosystem habitats. Recently, several existing reservoir withdrawal facilities have been modified to accommodate multi-level water intake capabilities in order to adapt the impact of long-term discharge of high turbidity flow. The purpose of this study was to assess the effect of selective withdrawal method on the control of downstream turbidity and its impact on water quality in Daecheong Reservoir. A laterally integrated two-dimensional hydrodynamic and eutrophication model, which was calibrated and validated in the previous studies, was applied to simulate the temporal variations of outflow turbidity with various hypothetical selective withdrawal scenarios. In addition, their impacts on the algal growth as well as water quality constituents were analyzed in three different spatial domains of the reservoir The results showed that the costly selective withdrawal method would provide very limited benefits for downstream turbidity control during two years of consecutive simulations for 2004-2005. In particular, an excessive withdrawal from the epilimnion zone for supplying upper layer clean water resulted in movement of turbidity plume that contained high phosphorus concentrations upward photic zone, and in turn increased algal growth in the lacustrine zone.

Characterization of Physical Properties of Turbid Flow in the Daecheong Reservoir Watershed dining Floods (홍수시 대청호 유역에 발생하는 탁수의 물리적 특성)

  • Chung, Se Woong;Lee, Heung Soo;Yoon, Sung Wan;Ye, Lyeong;Lee, Jun Ho;Choo, Chang Oh
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.6
    • /
    • pp.934-944
    • /
    • 2007
  • Fine suspended solids (SS) induced into a reservoir after flood events play important ecological and water quality roles by presenting persistent turbidity and attenuating light. Thus the origin and physical features must be characterized to understand their transport processes and associated impacts, and for the establishment of watershed based prevention strategies. This study was aimed to characterize the physical properties of the SS sampled from Daecheong Reservoir and its upstream rivers during flood events. Extensive field and laboratory experiments were carried out to identify the turbidity-SS relationships, particle size distributions, settling velocity, and mineral compositions of the SS. Results showed that the turbidity-SS relationships are site-specific depending on the locations and flood events in the system. The turbidity measured within the reservoir was much greater than that measured in the upstream rivers for the same SS value. The effective diameters ($D_{50}$) in the rivers were in the range of $13.3{\sim}54.3{\mu}m$, while those in the reservoir were reduced to $2.5{\sim}14.0{\mu}m$ due to a fast settling of large particles in the rivers. The major minerals consisting of the SS were found to be Illite, Muscovite, Albite, and Quartz both in the rivers and reservoir. Their apparent settling velocities at various locations in the reservoir were in the range of 0.06~0.13 m/day. The research outcome provides a fundamental information for the fine suspended particles that cause persistent turbidity in the reservoir, and can be used as basic parameters for modeling study to search watershed based optimal control measures.

Development and Validation of A Decision Support System for the Real-time Monitoring and Management of Reservoir Turbidity Flows: A Case Study for Daecheong Dam (실시간 저수지 탁수 감시 및 관리를 위한 의사결정지원시스템 개발 및 검증: 대청댐 사례)

  • Chung, Se-Woong;Jung, Yong-Rak;Ko, Ick-Hwan;Kim, Nam-Il
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.3
    • /
    • pp.293-303
    • /
    • 2008
  • Reservoir turbidity flows degrade the efficiency and sustainability of water supply system in many countries located in monsoon climate region. A decision support system called RTMMS aimed to assist reservoir operations was developed for the real time monitoring, modeling, and management of turbidity flows induced by flood runoffs in Daecheong reservoir. RTMMS consists of a real time data acquisition module that collects and stores field monitoring data, a data assimilation module that assists pre-processing of model input data, a two dimensional numerical model for the simulation of reservoir hydrodynamics and turbidity, and a post-processor that aids the analysis of simulation results and alternative management scenarios. RTMMS was calibrated using field data obtained during the flood season of 2004, and applied to real-time simulations of flood events occurred on July of 2006 for assessing its predictive capability. The system showed fairly satisfactory performance in reproducing the density flow regimes and fate of turbidity plumes in the reservoir with efficient computation time that is a vital requirement for a real time application. The configurations of RTMMS suggested in this study can be adopted in many reservoirs that have similar turbidity issues for better management of water supply utilities and downstream aquatic ecosystem.

Effect and Control of the Sediment in the Combined Sewer on CSOs (합류식 하수관거내 퇴적물이 CSOs에 미치는 영향 및 제어방안)

  • Lim, Bongsu;Kim, Doyoung;Lee, Kuangchun
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.1
    • /
    • pp.36-43
    • /
    • 2011
  • This study is selected two points of combined sewer that occurred Fish Kill after first flush, that analyzed generation of pollutants and stream runoff generation of combined sewer overflows (CSOs) as fine weather and rainfall. In addition, this study was to analyze the relationship between CSOs and sediments, to propose measures to reduce the sediment relevant with CSOs and rainfall runoff from entering sewage treatment plants and measures for discharged directly into streams when indicate relatively good water quality after overflow. Sediments in combined sewer system was discharged about 50~80% as overflows during rainfall and we can reduce the amount of the CSOs at least 50% or more if the sewer does not exist in the sediments because of the amount of discharge about the amount of intercept has been investigated by 3~5 times. Because of velocity at sediment interval in sewer is very low, sewage velocity of about 3~5 times as much as it can increase the amount of sediment can be reduced if the separation wall is installed. Effective control of BOD overflow load is respectively 77.5%, 75.8% at first point, second point by the separation wall is installed. Drainage area greater than area in this study or many combined sewer overflows region is increased the more effective control of separation wall. Turbidity to measure changes in water quality of overflows can be used as an factor to control the intercept flows because the intercept flows(3Q) after the first flush has lowered removal efficiency and increases the operational load of sewage treatment plants. Sewage water quality after a overflow when the reasonable turbidity was measured at this point flows to excluded intercept flow(1Q) can be discharged to stream.

Prediction Models to Control Pro-chlorination in Water Treatment Plant (정수장 후염소 공정제어를 위한 예측모델 개발)

  • Shin, Gang-Wook;Lee, Kyung-Hyuk
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.2
    • /
    • pp.213-218
    • /
    • 2008
  • Prediction models for post-chlorination require complicated information of reaction time, chlorine dosage considering flow rate as well as environmental conditions such as turbidity, temperature and pH. In order to operate post-chlorination process effectively, the correlations between inlet and outlet of clear well were investigated to develop prediction models of chlorine dosages in post-chlorination process. Correlations of environmental conditions including turbidity and chlorine dosage were investigated to predict residual chlorine at the outlet of clear well. A linear regression model and autoregressive model were developed to apply for the post-chlorination which take place time delay due to detention in clear well tank. The results from autoregressive model show the correlationship of 0.915~0.995. Consequently, the autoregressive model developed in this study would be applicable for real time control for post chlorination process. As a result, the autoregressive model for post chlorination which take place time delay and have multi parameters to control system would contribute to water treatment automation system by applying the process control algorithm.

Assessing the Action Plans in the Control Area(Soyang Reservoir) of Non-point Source Pollution (비점오염원 관리지역(소양호) 목표수질 달성도 평가)

  • Choi, Jaewan;Kang, Min-Ji;Ryu, Jichul;Kim, Dong-Il;Lim, Kyung-Jae;Shin, Dong-Seok
    • Journal of Environmental Science International
    • /
    • v.23 no.5
    • /
    • pp.839-852
    • /
    • 2014
  • The Ministry of Environment (MOE) has made more effort in managing point source pollution rather than in nonpoint source pollution in order to improve water quality of the four major rivers. However, it would be difficult to meet water quality targets solely by managing the point source pollution. As a result of the comprehensive measures established in 2004 under the leadership of the Prime Minister's Office, a variety of policies such as the designation of control areas to manage nonpoint source pollution are now in place. Various action plans to manage nonpoint source pollution have been implemented in the Soyang-dam watershed as one of the control areas designed in 2007. However, there are no tools to comprehensively assess the effectiveness of the action plans. Therefore, this study would assess the action plans (especially, BMPs) designed to manage Soyang-dam watershed with the WinHSPF and the CE-QUAL-W2. To this end, we simulated the rainfall-runoff and the water quality (SS) of the watershed and the reservoir after conducting model calibration and the model validation. As the results of the calibration for the WinHSPF, the determination coefficient ($R^2$) for the flow (Q, $m^3/s$) was 0.87 and the $R^2$ for the SS was 0.78. As the results of the validation, the former was 0.78 and the latter was 0.67. The results seem to be acceptable. Similarly, the calibration results of the CE-QUAL-W2 showed that the RMSE for the water level was 1.08 and the RMSE for the SS was 1.11. The validation results(RMSE) of the water level was 1.86 and the SS was 1.86. Based on the daily simulation results, the water quality target (turbidity 50 NTU) was not exceeded for 2009~2011, as results of maximum turbidity in '09, '10, and '11 were 3.1, 2.5, 5.6 NTU, respectively. The maximum turbidity in the years with the maximum, the minimum, and the average of yearly precipitation (1982~2011) were 15.5, 7.8, and 9.0, respectively, and therefore the water quality target was satisfied. It was discharged high turbidity at Inbuk, Gaa, Naerin, Gwidun, Woogak, Jeongja watershed resulting of the maximum turbidity by sub-basins in 3years(2009~2011). The results indicated that the water quality target for the nonpoint source pollution management should be changed and management area should be adjusted and reduced.

Impact of Climate Change on Water Cycle and Soil Loss in Daecheong Reservoir Watershed (기후변화에 따른 대청호 유역의 물 순환 및 토양 유실량 영향)

  • Ye, Lyeong;Chung, Se Woong;Oh, Dong Geun;Yoon, Sung Wan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.6
    • /
    • pp.821-831
    • /
    • 2009
  • The study was aimed to assess the expected impact of climate change on the water cycle and soil losses in Daecheong Reservoir watershed, Korea using the Soil and Water Assessment Tool (SWAT) that was validated for the watershed in a previous study. Future climate data including precipitation, temperature and humidity generated by introducing a regional climate model (Mesoscale Model Version 5, MM5) to dynamically downscale global circulation model (European Centre Hamburg Model Version 4, ECHAM4) were used to simulate the hydrological responses and soil erosion processes in the future 100 years (2001~2100) under the Special Report on Emissions Scenario (SRES) A1B. The results indicated that the climate change may increase in the amount of surface runoff and thereby sediment load to the reservoir. Spatially, the impact was relatively more significant in the subbasin Bocheongcheon because of its lower occupation rate of forest land compared to other subbasins. Seasonally, the increase of surface runoff and soil losses was more significant during late summer and fall season when both flood control and turbidity flow control are necessary for the reservoir and downstream. The occurrence of extreme turbidity flow events during these period is more vulnerable to reservoir operation because the suspended solids that remained water column can be resuspended by vertical mixing during winter turnover period. The study results provide useful information for the development of adaptive management strategy for the reservoir to cope with the expected impact of future climate change.