In this paper, experimental investigations on the inelastic seismic behavior of tunnel form buildings (i.e., box-type or panel systems) are presented. Two four-story scaled building specimens were tested under quasi-static cyclic lateral loading in longitudinal and transverse directions. The experimental results and supplemental finite element simulations collectively indicate that lightly reinforced structural walls of tunnel form buildings may exhibit brittle flexural failure under seismic action. The global tension/compression couple triggers this failure mechanism by creating pure axial tension in outermost shear-walls. This type of failure takes place due to rupturing of longitudinal reinforcement without crushing of concrete, therefore is of particular interest in emphasizing the mode of failure that is not routinely considered during seismic design of shear-wall dominant structural systems.
Journal of the Korean Association of Geographic Information Studies
/
v.9
no.4
/
pp.142-150
/
2006
In this study, GPR and lineament methods are used for the effective construction. GPR method is non-destructive testing to understand underground utility tunnel while lineament method is to understand locational environment. First, soil condition of the subject area is surveyed by location analysis. As the result of GPR survey, small-scale and large-scale of underground utility tunnel's location and scale were estimated. From the result of estimation, it is found that the main cause of underground utility tunnel's generation was not the effect of landslide or disturbed foundation from the excavation work but crack of shear & tension from the effect of fault movement which grew by insulation surroundings. From now on, this investigation method would be very useful in the survey and design stage on site for the effective construction and maintenance.
Various geophysical methods have been applied to the survey of the lava tunnel of Manjanggul in Cheju Island to study the effectiveness of each method in investigating underground tunnels. The surveys employing gravity, magnetic, electrical, AMT and VLF methods were carried out along seven profiles across the Manjanggul; especially, all the five methods were used on one representative profile. Several aspects of different methods pertinent to their use in investigation of underground tunnels have been noted. The electrical method employing the dipole-dipole array appeared to be the most effective one among five methods. Therefore, we have tested the electrical method more carefully by using various electrode spacings, and obtained successful resistivity sections showing the existence of lava tunnels. The gravity method provided relatively successful responses associated with the tunnel although the gravity readings were contaminated by wind blowing during the survey. The gravity data were also useful for the quantitative modeling study. The magnetic data were also successful in delineating the tunnel qualitatively. The AMT data were not successful because the used frequency band was not appropriate in detecting very shallow target. The VLF data were severely influenced by the neighboring noise sources such as power lines and were not successful in detecting the tunnel responses. The comprehensive result of electrical, gravity and magnetic surveys suggests that undiscovered lava tunnels may exist adjacent to the Manjanggul.
Journal of the Korea institute for structural maintenance and inspection
/
v.21
no.6
/
pp.25-34
/
2017
Since the 30-year-old facility is expected to surge from 10.5% to 23.9% in 10 years, the new evaluation system is needed to establish efficient maintenance system for securing the safety and extending the life span of existing facilities. In this study, Delphi and AHP(Analytic Hierarchy Process) was conducted to provide a systematic new evaluation system for the NATM tunnel, which is the most frequently constructed structure of the existing tunnel. Since the existing assessment systems are limited in scope of evlauatuon criteria, the survey was conducted in conjunction with closed questionnaires on existing items and open questionnaires for eliciting new items. In results, suitable evaluation factors were derived for the NATM tunnel through the validation of the survey results. Also after calculating weighted value of the derived assessment item using AHP technique, a new evaluation system is proposed to meet the characteristics of the NATM tunnel, so that they can be used as reference materials for revising and supplementing detatiled guidelines in the future.
Background: The objective structured clinical examination (OSCE) is used in the colleges of Korean Medicine, but few studies have validated the OSCE evaluation criteria or post-education questionnaires. Diagnostic ultrasound is used in Korean medicine treatment including acupuncture, acupotomy, and pharmacopuncture to increase the safety and efficacy of treatment. We aimed to develop and validate a OSCE checklist and questionnaire for diagnostic musculoskeletal ultrasound training. Methods: A OSCE checklist and rubric for diagnostic ultrasound training, and questionnaire was developed using literature research. Eight expert panelists verified each draft item in a single-round survey. Items with a content validity ratio (CVR) < 0.75 were excluded or modified to reflect the experts' opinions. Results: The OSCE checklist and rubric for diagnostic ultrasound training focusing on volar wrist and carpal tunnel syndrome included: 15 items revised according to CVR and expert opinions, the pre-examination procedure, structures to be identified by ultrasound, scans with 2 diagnostic criteria for carpal tunnel syndrome, an explanation of the exam results, and the post exam procedure. The questionnaire consisted of 15 items, including the overall evaluation of training, the effect of the OSCE, and the perception of the ultrasound. All 6 self-evaluation items were not revised, as they had a CVR of ≥ 0.75. Conclusion: An ultrasound OSCE for scanning the volar wrist and diagnosing carpal tunnel syndrome was developed using 15 validated tasks, 15 survey questions about ultrasound training, and 6 questions for self-evaluation. These results may be used in the future for education in diagnostic ultrasound.
In South Korea, there are a large number of tunnels because of the mountainous terrain, and to overcome this characteristics, lengths of tunnels are more longer than existing tunnels. The need to improvement current tunnel management contents is giving rise for accidents in tunnel section is continuously increased although lots of efforts to reduce the accidents. Conventionally, disaster prevention have been focused on the Tunnel Management Systems, tunnel operators generally tend to depend on CCTV images for most contents of detailed traffic flow managing. In this paper, investigation about current Tunnel Management Systems contents using IPA survey was conducted, and Priority Improvement Contents(Accident Situation Management Support, 2nd Accident Management Support, Traffic Flow Monitoring), which importance are high, but satisfaction are low, are deducted. Also, CCTV images, lack intuitive understanding, are judged as a main cause of low satisfaction of those contents. To overcome those limitations of the existing Tunnel Management Systems, this study sought to develop a technology for the synthesis of road images to derive traffic information from synthesis images, and the contents improvement stragegy is established. Tunnel operators-oriented satisfaction survey on new contents was carried out, and scored 4.2 on a 5-point scale. This has confirmed that the availability of new contents and at this stage, with pushing ahead of long-tunnels and undersea tunnels construction, politic applications are expected.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.8
/
pp.26-35
/
2020
Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.
Ham, Dong-Sun;Kim, Byeong-Ho;Jeon, Byeong-Gyoo;Kim, In-Soo
Proceedings of the KSR Conference
/
2007.05a
/
pp.1838-1844
/
2007
The Wonhyo Tunnel on KTX railroad line is a section of latest concerns from domestic environmental NGOs, which focus on potential destruction of ecosystem or the like due to ever-depleted swamp water at about 300m upward from the tunnel under construction. As a result of study, out of all swamps in the vicinity of the tunnel, it was found that Mujechi 1st and 2nd swamps have been getting smaller in their area little by little since 50 years ago primarily under the influence of eroded streams around lower swamp and even ever-increasing annual mean temperature. As the result of monitoring about swamp before work, it was found that swamp water depends absolutely on amount of rainfall. Besides, the results of monitoring during work also didn't show any leakage generated in the tunnel during and after excavation works with regard to a wheat field swamp in the most vicinity of the tunnel (80m away). On the other hand, it was found that the range affected by ground water sink in tunnel section without grouting process amounted to about 100m around the tunnel, which indicates that such ground water sink has no significant impact upon most of swamps near the tunnel. As the result of testing by two well tracer test around swamps, it was noted that swamp water didn't run out from the bottom of swamp even with adjacent ground water level sunk in factitious ways. And the results of physical survey showed that swamp kept saturated even in dry season when ground water level becomes lower than the bottom of swamp. Therefore, even supposing that ground water level becomes sunk due to tunnel works, it is estimated that the water level of swamps would be still kept owing to impervious layer(peat beds).
The Journal of Churna Manual Medicine for Spine and Nerves
/
v.16
no.1
/
pp.73-89
/
2021
Objectives We conducted an online survey to understand the current status of Korean Medicine clinical practice related to carpal tunnel syndrome (CTS) to develop the CTS Korean Medicine Clinical Practice Guidelines (CPG). Methods A thoroughly reviewed questionnaire was distributed by e-mail to 21,719 Korean Medicine doctors between March 26 and April 30, 2021. All raw data were arranged and analyzed systematically. Results The response rate among the doctors was 4%. Of the respondents, 82.1% responded that it is necessary to develop the CTS Korean Medicine CPG. We also obtained data related to the specific diagnosis, treatment, and prognosis management methods used at various treatment sites for patients with CTS. Conclusions This online survey will be helpful in developing the CTS CPG, which will contribute to the standardization of guidelines and improvements in the reliability of Korean Medicine. Our findings will provide valuable data and resources for future clinical studies on CTS.
The borehole radar methods used to tunnel detection are mainly classified into borehole radar reflection, directional antenna, crosshole scanning, and radar tomography methods. In this study, we have investigated the feasibility and limitation of each method to tunnel detection through case studies. In the borehole radar reflection data, there were much more clear diffraction signals of the upper wings than lower wings of the hyperbolas reflected from the tunnel, and their upper and lower wings were spreaded out to more than 10m higher and lower traces from the peaks of the hyperbolas. As the ratio of borehole diameter to antenna length increases, the ringing gets stronger on the data due to the increase in the impedance mismatching between antennas and water in the boreholes. It is also found that the reflection signals from the tunnel could be enhanced using the optimal offset distance between transmitter and receiver antennas. Nevertheless, the borehole radar reflection data could not provide directional information of the reflectors in the subsurface. Direction finding antenna system had a advantage to take a three dimensional location of a tunnel with only one borehole survey even though the cost is still very high and it required very high expertise. The data from crosshole scanning could be a good indicator for tunnel detection and it could give more reliable result when the borehole radar reflection survey is carried out together. The images of the subsurface also can be reconstructed using travel time tomography which could provide the physical property of the medium and would be effective for imaging the underground structure such as tunnels. Based on the results described above, we suggest a cost-effective field procedure for detection of a tunnel using borehole radar techniques; borehole radar reflection survey using dipole antenna can firstly be applied to pick up anomalous regions within the borehole, and crosshole scanning or reflection survey using directional antenna can then be applied only to the anomalous regions to detect the tunnel.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.