• Title/Summary/Keyword: Tunnel survey

Search Result 300, Processing Time 0.024 seconds

Analysis of the Relationship between Human Risk Factors and Evacuation Behavior for Tunnel Safety (터널안전에 대한 인적위험 요소와 대피행동 간의 관계분석)

  • Baek, Chung-Hyun;Park, Sea-Man;Choi, Byong-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.7
    • /
    • pp.535-546
    • /
    • 2019
  • The purpose of this research was to analyze the relationship between human risk factors and evacuation behavior stages for tunnel safety. Therefore, we conducted a survey using a structured questionnaire on the relationship between safety facilities and safety behavior in order to derive an optimized interaction between the two. The research subjects were 141 tunnel users who understand the tunnel environment. The survey period was from June 24, 2018, to September 28, 2018. As data analysis methods, we employed a frequency analysis, a multiple regression analysis, and an independent-sample t-test. In the analysis of the correlation between the human risk factors and the major variables of evacuation behavior, the evacuation phases 1, 2, and 3 were all correlated with acceleration and delay, and the human risk factors were partially correlated. In the multiple regression analysis, the will to comply with laws (${\beta}=0.188$, p=0.034) and information recognition within the tunnel (${\beta}=0.220$, p=0.009) were factors that influence the relationship between human risk factors and evacuation behavior, indicating 12% explanatory power of the impact of human risk factors for the acceleration of evacuation behavior 3. The important variables between human risk factors and evacuation behavior were compliance with laws and information recognition in tunnels. Hence, it is necessary to study the elements that interact with the environment in the tunnel.

2 Dimensional TSP Modeling Using Finite Element Method (유한 요소법을 이용한 2차원 TSP 모델링)

  • Lee, Hong;Suh, Jung-Hee;Shin, Chang-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.6 no.1
    • /
    • pp.13-22
    • /
    • 2003
  • TSP (Tunnel Seismic Profiling) survey is a technique for imaging and characterizing geological structures ahead of a tunnel face. The seismic modeling algorithm and the synthetic data could be helpful for TSP surveys. However, there is few algorithm to describe the propagation of the elastic waves around the tunnel. In this study, existing 2-dimensional seismic modeling algorithm using finite element method was modified to make a suitable algorithm for TSP modeling. Using this algorithm, TSP modeling was practiced in some models. And the synthetic data was analyzed to examine the propagation characteristics of the elastic waves. First of all, the modeling for the homogeneous tunnel model was practiced to examine the propagation characteristics of the direct waves in the vicinity of the tunnel. And the algorithm was applied to some models having reflector which is perpendicular or parallel to the excavation direction. From these, the propagation characteristics of the reflected waves were examined. Furthermore, two source-receiver arrays were used in respective models to investigate the properties of the two arrays. These modeling algorithm and synthetic data could be helpful in interpreting TSP survey data, developing inversion algorithm and designing new source-receiver arrays.

Development and application of 3D migration techniques for tunnel seismic exploration (터널내 탄성파 탐사의 3차원 구조보정기법 개발 및 현장적용)

  • Choi, Sang-Soon;Han, Byeong-Hyeon;Kim, Jae-Kwon;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.3
    • /
    • pp.247-258
    • /
    • 2004
  • Two 3-dimensional data processing techniques to predict the fractured zone ahead of a tunnel face by the tunnel seismic survey were proposed so that the geometric formation of the fractured zone could be estimated. The first 3-dimensional data processing technique was developed based on the principle of ellipsoid, The input data needed for the 3D migration can be obtained from the 2-dimensional tunnel seismic prediction (TSP) test where the TSP test should be performed in each sidewall of a tunnel. The second 3-dimensional migration technique that was developed based on the concept of wave travel plane was proposed. This technique can be applied when the TSP is operated with sources in one sidewall of a tunnel while the receivers are installed in both sidewalls. New migration technique was applied to an in-situ tunnelling site. The 3-dimensional migration was performed using measured TSP data and its results were compared with the geological investigation results that were monitored during tunnel construction. This comparison revealed that the proposed migration technique could reconstruct the discontinuity planes reasonably well.

  • PDF

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Dynamic response and waterproof property of tunnel segmental lining subjected to earthquake action

  • Yan, Qixiang;Bao, Rui;Chen, Hang;Li, Binjia;Chen, Wenyu;Dai, Yongwen;Zhou, Hongyuan
    • Earthquakes and Structures
    • /
    • v.17 no.4
    • /
    • pp.411-424
    • /
    • 2019
  • In this study, a numerical model of a shield tunnel with an assembled segmental lining was built. The seismic response of the segmental lining of the section of the shield tunnel in Line 1 of the Chengdu Metro is analyzed as it passes through the interface of sand-cobble and mudstone layers. To do so, the node-stress seismic-motion input method was used to input the seismic motion measured during the 2008 Wenchuan earthquake, and the joint openings and dislocations associated with the earthquake action were obtained. With reference to the Ethylene-Propylene-Diene Monomer (EPDM) sealing gaskets used in the shield tunnels in the Chengdu Metro, numerical simulation was applied to analyze the contact pressure along the seepage paths and the waterproof property under different joint openings and dislocations. A laboratory test on the elastic sealing gasket was also conducted to study its waterproof property. The test results accord well with the numerical results and the occurrence of water seepage in the section of the shield tunnel in Line 1 of the Chengdu Metro during the 2008 Wenchuan earthquake was verified. These research results demonstrate the deformation of segmental joint under earthquake, also demonstrate the relationship between segmental joint deformation and waterproof property.

Tunnel Convergence and Crown settlement using 3D Laser Scanning (고밀도 레이저 측량을 이용한 터널의 천단 및 내공 변위 관측)

  • Lee Ja-One;Jang Sang-Kyu;Lim Young-Bin;Moon Doo-Youl;Yun Bu-Yeol
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.507-512
    • /
    • 2006
  • There are many risks in constructing tunnel-structure. To prevent these risks from occurring and secure safety, the precise and rapid survey of inside displacement of the tunnel is required. But nowadays the measurement of the crown settlement, convergency, and surface settlement depends on general kinds of method which use total station or level. In the way to provide data about maintaining structure according to recent improvement and progress of measuring technology, 3D laser scanning is used. It solves the problem of reliability in measuring displacement of existing structure, provides material that enables to estimate shape change of structure visually, and makes it possible to deliberate speedy countermeasure. By this three dimensioning it is possible to make efficient use of structure maintenance and field measurement

  • PDF

Revisions on the payline for overbreak in Tunnel

  • Park, T.;Ahn, B.;Baek, S.;Tae, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.714-715
    • /
    • 2015
  • Drill and blast method has been most widely used in tunnel excavation, after NATM (New Austrian Tunneling Method) was introduced in 1983. The NATM method utilized mass of shotcrete to secure the bearing capacity of tunnels. Overbreak defined how much larger the actual excavation was than the planned. When it became larger, more shotcrete was required to fill in it Here, payline fixed allowable overbreak, referring to payable amounts of shotcrete. Since owner was not responsible for shotcrete exceeding payline, it was important to properly establish the standards for payline. Although the standards were provided in 'Poom-sam'(standardized quantity per unit), they did not properly reflect the actual conditions for excavation. Thus, this study reviewed existing domestic and foreign standards for overbreak, and estimated overbreak for each type of support using survey data, and finally provided the improvements on the current standards.

  • PDF

Analyzing the Change of Surface Water and Groundwater Systems Caused by Tunnel Construction in Northern Ulsan City (울산시 북구 지역 터널 굴착에 의한 지표수계 및 지하수계 변화 분석)

  • Jeon, Hang-Tak;Hamm, Se-Yeong;Lee, Chung-Mo;Lim, Woo-Ri;Yun, Sul-Min;Park, Heung-Jai
    • The Journal of Engineering Geology
    • /
    • v.28 no.1
    • /
    • pp.81-99
    • /
    • 2018
  • Excessive groundwater discharge by tunneling and tunnel operation can lead to groundwater exhaustion and ground subsidence. Therefore, it is very important to evaluate environmental impact and to establish mitigation measures of the impact related to tunnel excavation based on hydrogeological and modeling approaches. This study examined the depletion of surface reservoirs and valley water due to tunnel excavation through field survey, water quality analysis, tracer test, and groundwater modeling. As a result of field water quality test, the concentration of chemical constituents in groundwater discharge into the tunnel is slightly higher than that of valley water. By the result of laboratory water analysis, both valley water and the groundwater belong to $Ca^{2+}+HCO_3{^-}$ type. Tracer test that was conducted between the valley at the injection point and the tunnel, indicates valley water infiltration into the ground and flowing out to the tunnel, with maximum electrical conductance changes of $70{\mu}S/cm$ in the first test and of $40{\mu}S/cm$ in the second test. By groundwater modeling, the groundwater discharge rate into the tunnel during tunnel construction is estimated as $4,942m^3/day$ and groundwater level recovers in 3 years from the tunnel completion. As a result of particle tracking modeling, the nearest particle reaches the tunnel after 6 hours and the farthest particle reaches the tunnel after 9 hours, similarly to the case of the field trace test.

Relationship between the Locations of Tunnel Entrance and Areas Affected by Deforestation in the Forest in Korea (산림관통 터널 입출구부 위치와 훼손 면적의 관계)

  • Kim, Dong-Pil;Hong, Suk-Hwan;Choi, Song-Hyun;Lee, Sang-Cheol;Ahn, Mi-Yeon
    • Korean Journal of Environment and Ecology
    • /
    • v.31 no.1
    • /
    • pp.104-111
    • /
    • 2017
  • The construction of road tunnels and bridges have delivered driving efficiency and stability based on developed engineering technology. Tunnels have the advantage of reducing the deforested area compared with other road construction methods. Since a tunnel is an underground passageway dug through the surrounding soil/earth/rock and enclosed except for the entrance and exit, commonly at each end, it does not cause a large amount of deforestation. This study surveyed the deforested areas at each end of the tunnel by the design of the tunnel entrance and exit and forest topography to minimize the amount of deforestation caused by road construction. A survey was done on a total of 150 tunnels (300 entrances and exits) on several main roads in Korea. The deforested area of each tunnel was collected by a breakdown of the entrance area and the upper area of the tunnel. According to the results of Kruskal-Wallis analysis, it was found that there was statistically a significant relation between the location of tunnels and the amount of deforestation by the topographical access type of the tunnels. The tunnel with 'facing orthogonal to incline' type access caused the smallest deforestation while the the tunnel with 'facing to valley' and 'parallel with incline' type accesses caused large deforestation during tunnel construction. Tunnel positioning in the light of topography can reduce the deforested area by up to 1.5ha at each tunnel.

Factor Analysis on Psychological Cause of Speed Reduction in Expressway Tunnel Section Utilizing Importance-Performance Analysis (IPA) (고속도로 터널부 속도 감소에 관한 심리적 요인분석)

  • Lee, Ki Young;Kim, Tae Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.127-134
    • /
    • 2010
  • Tunnel sections on the highway are different from rest of sections on the highway in terms of velocity, the number of passing cars, and vehicle density which, in particular, affect drivers' behavior before and after drivers pass through the tunnel. However, literature review reveals that former studies are too focused on quantitative indicator to consider qualitative aspects. Therefore, this paper conducts survey questionnaire and IPA (Importance Performance Analysis) to find out qualitative improvements on velocity drop on the tunnel sections. The results show as follows: First, drivers require improvements of tunnel form (length and curved form inside tunnel) which is derived from long distance tunnel. Second, experts primarily ask for amendment of geometric characteristics. With comparison of requirements of both drivers and experts, there are many differences in length of tunnel and form of curved tunnel. This also presents that drivers don't satisfy with both length of tunnel and form of curved tunnel that are provided as a part of highway design factors.