• Title/Summary/Keyword: Tunnel safety

Search Result 1,125, Processing Time 0.026 seconds

Deterioration Character of tunnel damaged by fire and Fire Proofing Measure (화재에 의한 터널 열화특성 및 내화대책 기술)

  • Seo, Kang-Chun;Yoon, Tae-Gook;Park, Si-Hyun;Cho, Sung-Han;Kim, Eun-Chong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.129-139
    • /
    • 2005
  • In this paper, the behaviors of tunnel damaged by fire, the diagnostic techniques for evaluating tunnel stability are presented. Also two fireproof construction methods are recommended. Three tunnels damaged by fire were analyzed to evaluate the structural stability. From the these analyzed, it is recommended that surface checking, rebound number of concrete by Schmidt Hammer, and carbonation of concrete are essential to evaluate the engineering properties of concrete in tunnel structure damaged by fire. On the basis of case studies of tunnel fire collected by ITA, the change of concrete and steel strengths by fire are explained, and numerical analysis, which was performed on culvert and circle tunnel, shows that distribution of temperature in the tunnel is dependant upon tunnel shape. Two fireproof construction methods using panel and punching metal are introduced to protect the tunnel by fire.

  • PDF

Failure of circular tunnel in saturated soil subjected to internal blast loading

  • Han, Yuzhen;Liu, Huabei
    • Geomechanics and Engineering
    • /
    • v.11 no.3
    • /
    • pp.421-438
    • /
    • 2016
  • Explosions inside transportation tunnels might result in failure of tunnel structures. This study investigated the failure mechanisms of circular cast-iron tunnels in saturated soil subjected to medium internal blast loading. This issue is crucial to tunnel safety as many transportation tunnels run through saturated soils. At the same time blast loading on saturated soils may induce residual excess pore pressure, which may result in soil liquefaction. A series of numerical simulations were carried out using Finite Element program LS-DYNA. The effect of soil liquefaction was simulated by the Federal Highway soil model. It was found that the failure modes of tunnel lining were differed with different levels of blast loading. The damage and failure of the tunnel lining was progressive in nature and they occurred mainly during lining vibration when the main event of blast loading was over. Soil liquefaction may lead to more severe failure of tunnel lining. Soil deformation and soil liquefaction were determined by the coupling effects of lining damage, lining vibration, and blast loading. The damage of tunnel lining was a result of internal blast loading as well as dynamic interaction between tunnel lining and saturated soil, and stress concentration induced by a ventilation shaft connected to the tunnel might result in more severe lining damage.

Numerical Analysis for Shotcrete Lining at SCL Tunnel in NS2 Transmission Cable Tunnel Project in Singapore (싱가포르 케이블터널 프로젝트 NS2현장 SCL 터널에서의 숏크리트 라이닝의 변형거동 특성)

  • Kwang, Han Fook;Kim, Young Geun
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • This technical paper is a study on the unique displacements of Shotcrete Lining at the mined tunnel during excavation period through deep consideration with real time data from monitoring instrumentations correlation with the numerical analysis to identify the rock stresses and the rock spring points at the working face of the Conventional tunnelling by the Drill and Blast, based on the geological face mapping results of the project NS2, Transmission cable tunnel project in Singapore. The created geometry of numerical model was prepared to the real mined tunnel construction site including, vertical shaft, construction adit, tunnel junction area, and 2 enlargement caverns. The convergence measurements by the monitoring instrumentation were performed during the tunnel excavation and shaft sinking construction stages to guarantee the safety of complicated underground structures.

A Study on Development of the Controlled Low-Strength and High-Flowable Filling Material and Application of the Backfilling in Cavities behind the Old Tunnel Lining (고유동 충전재의 개발과 노후 터널의 배면공동 뒤채움에 관한 연구)

  • Ma, Sang-Joon;Seo, Kyoung-Won;Bae, Gyu-Jin;Ahn, Sang-Cheol;Lim, Kyung-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.177-184
    • /
    • 2002
  • The most tunnel damage such as cracks or leakage which exist in tunnel lining commonly, is caused by the cavities where exist behind the tunnel lining, through the tunnel safety inspections. These cavities were analysed to affect a stability of a running-tunnel seriously. This study is on the development of the controlled low-strength and flowable filling material which is able to apply to the cavity behind the tunnel lining. The major materials of backfilling developed are a crushed sand and a stone-dust which exists as a cake-state and is a by-product obtained in the producting process of aggregate. It is conformed with the design standard to the physical characteristics of backfilling. The backfilling material developed is designed to reduce the fair amount of cement. According to the designed compound ratio, it is carried out the laboratory tests such as a compressive strength and a chemical analyses and is applied to dilapidated old tunnel for an application assessment.

Relationship between Adaptation Luminance and Threshold Zone Luminance for Vehicular Traffic Tunnels (터널 순응휘도와 경계부 휘도의 관계 연구)

  • Cho, Won Bum;Jeong, Jun Hwa
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.85-99
    • /
    • 2014
  • PURPOSES : This study has been performed with the objective to determine threshold zone luminance of adaptation luminance by target safety level in a vehicular traffic tunnel with design speed set at 100km/h. METHODS : The study made a miniature capable of portraying changes in luminance distribution within $2{\times}10^{\circ}$ conical field of view of the driver approaching to the tunnel for the test. Test conditions were set based on justifications for CIE 88-1990's threshold zone luminance used as a reference by domestic tunnel light standards (KS C 3703 : 2010). Luminance contrast of object background and object is 23%, object presentation duration is 0.5 seconds, and size of the object background is $7.3{\times}11.5m^2$ RESULTS : Threshold zone luminance was set within adaptation luminance of $100{\sim}3,000cd/m^2$. Adaptation luminance and threshold zone luminance based on 50%, 75% and 90% target safety level all showed a relatively high linear relationship. According to findings in the study, it is not appropriate to specify the relationship between adaptation luminance and threshold zone luminance as luminance ratio. Rather, direct utilization of the linear relationship gained from the study findings appears to be the better solution. CONCLUSIONS : Findings of this study may be used to determine operation of threshold zone luminance based on target safety level. However, a proper verification and validity of test results are required. Furthermore, a study to determine proper threshold zone luminance level considering target safety level reviewed in this study and various decision-making factors such as economic conditions in Korea and energy-related policies should be carried out in addition. Additional tests on adaptation luminance greater than $3,000cd/m^2$ will be performed, through which application scope of the test findings will be broadened.

Influences of Neck and/or Wrist Pain on Hand Grip Strength of Industrial Quality Proofing Workers

  • Wollesen, Bettina;Graf, Julia;Schumacher, Nils;Meyer, Gianluca;Wanstrath, Matthias;Feldhaus, Christian;Luedtke, Kerstin;Mattes, Klaus
    • Safety and Health at Work
    • /
    • v.11 no.4
    • /
    • pp.458-465
    • /
    • 2020
  • Background: The aim of this study was to analyze the interaction between neck and/or wrist pain and hand grip strength (HGS) and to investigate factors (age, sex, neck disorders, and carpal tunnel syndrome) influencing the HGS of industrial quality proofing workers (N = 145). Methods: Standardized questionnaires [Neck Disability Index (NDI), Boston Carpal Tunnel Questionnaire] were used to evaluate existing neck and/or wrist pain. HGS measurements were performed in different wrist positions. Results: Significant differences between participants with and without neck pain were found in different wrist positions, in neutral wrist position right [without neck pain (n = 48) 46.34 (43.39 - 49.30); with neck pain (n = 97) 38.46 (36.20 - 40.72), F(1,144) = 16.82, p < 0.001, ŋp2 = 0.11] and left [without neck pain 44.06 (41.19 - 46.94); with neck pain 37.36 (35.13 - 39.58), F(1,144) = 12.70, p < 0.001, ŋp2 = 0.08]. A significant difference between participants with and without wrist pain was found for neutral wrist position right [without wrist pain (n = 105) 42.53 (40.37 - 44.70); with wrist pain (n = 40) 37.24 (33.56 - 40.91), F(1,144) = 6.41, p = 0.01, ŋp2 = 0.04]. Regression analysis showed significant results especially for steps two (age and weight, NDI) and three (age and weight, NDI, Boston Carpal Tunnel Questionnaire) for neutral position right (R2 = 0.355, R2 = 0.357, respectively). Conclusion: Neck pain has an impact on HGS but should be evaluated in consideration of age and sex.

A Dynamic Analysis and Evaluation of a Building Structure due to Tunnel Blast by using Semi-Empirica Method (준경험적 방법을 이용한 터널발파 작업시 인접구조물의 동적해석 및 진동영향성 평가)

  • Son, Sung-Wan;Ru, Kuk-Hyun;Chun, Jong-Kun;Nam, Young-Sik;Kim, Dong-Gi
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.772-775
    • /
    • 2005
  • Most engineers, related to soil and civil dynamic field, have been interested in the direct dynamic design of building transmitted from soil and rock to structure due to blasting. However it is not easy to estimate the dynamic response of structures due to blasting by using analytical method because of difficulties of soil modeling, prediction of excitation force and so on. In this paper, dynamic analysis have been performed to predict vibration level and evaluate dynamic safety of structure adjacent to tunnel blast and the semi empirical method, which is based on vibration measurement data, has been employed to consider blast vibration characteristics.

  • PDF

A Study Tunnel telemetering with wireless internet make use of CDMA for a basis (CDMA를 이용한 무선인터넷기반의 터널 원격 계측)

  • 신현식;강경태;강창훈;길동욱;윤형득
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.05a
    • /
    • pp.342-346
    • /
    • 2003
  • Present CDMA technology is development continuously to internet technology and new communication infra called internet construction for quality of high quality offer the changing existent existence. wireless data communication area. In the meantime, our country is tunnel of whole country over 500 by special quality that is photograph because Safety diagnosis consists to manage preservation administration is in dangerous state about safety. Domestic telemeter technology is real condition that is depending on expensive foreign goods and engineer to improve that. Therefore tunnel preservationㆍadministration more improved telemeter system develop wish to this research uses CDMA net.

  • PDF

Analysis and development of measurement systems for tunnels and slopes under a high velocity (고속주행을 고려한 터널 및 사면의 계측시스템 분석 및 개선 방안 연구)

  • Chung, Jae-Hoon;Park, Yoon-Je;Lee, Rae-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1376-1381
    • /
    • 2010
  • In this study, we dealt with an analysis and development of measurement systems for tunnel and slope structures under a high velocity. Deterioration of tunnel and slope structures becomes a critical issue in regard to both safety and economic concerns. Deterioration itself is inevitable, but condition assessment technology and nondestructive evaluation techniques could provide solutions to ensure public safety by means of detecting damage before serious and expensive degradation consequences occur. We reviewed the existing monitoring and maintenance systems of slopes and tunnels and more advanced directions, especially for highways under high-speed vehicles.

  • PDF

서울지하철 3,4호선 Tunnel 굴착과 진동대책 조사연구(1)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.2
    • /
    • pp.3-15
    • /
    • 1982
  • The study on prevention measures for vibration and excavation of tunnel for the #3, #4, Seoul Subway. In the Seoul subway tunnel blasting, the drilling pattern and prevention method to seismic vibration are as follows as well as for adaptions of NATM, the supportings of roof and wall holes are arranged with control blasting. 1. The blasting is executed basically using the low velocity explosive such as slurry, Nitrate ammonium explosive, and F-I and F-II explosive for control blasting substituting of existing dynamite. 2. The cut holes are arranged with burn cut pattern and also must be arranged with M/S electrical delay caps substituting of ordinary do]ay caps. 3. Jack leg drills are used in Five Job sites and a jumbo drill in one job site. 4. In performance of safety work and in maintenance of building safety. The drilling length for blasting will not exceed 1.20 meter for round so that the vibration value shall carry below 0.3cm/sec. The harmonizing of better powder, better drilling machine and better technique is only the way of improving tunnelling efficiency and less vibration will help the dereasing of accidence.

  • PDF