• Title/Summary/Keyword: Tunnel lining

Search Result 562, Processing Time 0.028 seconds

Estimation for Primary Tunnel Lining Loads

  • Kim, Hak-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1998.05a
    • /
    • pp.153-204
    • /
    • 1998
  • Prediction of lining loads due to tunnelling is one of the major issues to be addressed in the design of a tunnel. The objective of this study is to investigate rational and realistic design loads on tunnel linings. factors influencing the lining load are summarized and discussed. The instruments for measuring the lining loads are reviewed and discussed because field measurements are often necessary to verify the design methods. Tunnel construction in the City of Edmonton has been very active for storm and sanitary purposes. Since the early 1970's, the city has also been developing an underground Light Rail Transit system. The load measurements obtained from these tunnels are compared with the results from the existing design methods. However, none of the existing methods are totally satisfactory, Therefore, there is some room for improvement in the prediction of lining loads. The convergence-confinement method is reviewed and applied to a case history of a tunnel in Edmonton. The convergence curves are obtained from 2-D finite element analyses using three different material models and theoretical equations. The limitation of the convergence-confinement method is discussed by comparing these curves with the field measurements. Three-dimensional finite element analyses are performed to gain a better understanding of stress and displacement behaviour near the tunnel face. An improved design method is proposed based on the review of existing design methods and the performance of numerical analyses. A specific method or combination of two different methods is suggested for the estimation of lining loads for different conditions of tunnelling. A method to determine the stress reduction factor is described. Typical values of dimensionless load factors nD/H for tunnels in Edmonton are obtained from parametric analyses. Finally, the loads calculated using the proposed method are compared with field measurements collected from various tunnels in terms of soil types and construction methods to verify the method. The proposed method gives a reasonable approximation of the lining loads. The proposed method is recommended as an approximate guideline for the design of tunnels, but the results should be confirmed by field measurements due to the uncertainties of the ground and lining properties and the construction procedures, This is the reason that in-situ monitoring should be an integral part of the design procedure.

  • PDF

Dynamic Behaviors of the Curved Steel Tunnel Lining due to Wind Loads by Passing Vehicles (통과차량으로 인한 풍하중에 대한 곡선 강재 터널라이닝의 동적 거동 분석)

  • Mha, Ho-Seong;Cho, Kwang-Il;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.4
    • /
    • pp.309-320
    • /
    • 2012
  • Dynamic behaviors of the tunnel linings of curved tunnels with various curvatures are investigated to examine the effect of wind loads due to passing vehicles. In the case without backfill, the responses of the tunnel lining should be considered to examine the clearance of the lining. A steel tunnel lining is selected to see the influence of the wind load upon the tunnel lining more clearly. The wind pressure upon the lining is simplified into the pressure and suction while the vehicle passing the loading positions. As the radius of curvature decreases, the response decreases, showing that the strength against the deformation is found to increase since the asymmetry of the deformation shape is reduced. It is found that the responses increase as the passing vehicle speed increases.

A Study on Numerical Analysis for GPR Signal Characterization of Tunnel Lining Cavities (터널 라이닝 공동에 대한 GPR 신호 특성 분석을 위한 수치해석 연구)

  • Go, Gyu-Hyun;Lee, Sung Jin
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.10
    • /
    • pp.65-76
    • /
    • 2021
  • There is a possibility of cavities occurring inside and behind the lining of an aged tunnel structure. In most cases, it is not easy to check the cavity because it exists in a place where visual inspection is impossible. Recently, attempts have been made to evaluate the condition of the tunnel lining and the backfill materials using non-destructive tests such as Ground Penetrating Radar, and various related model tests and numerical analysis studies have been conducted. In this study, the GPR signal characteristics for tunnel lining model testing were analyzed using gprMax software, which was compared with model test results. The numerical model applied to the model test reasonably simulated the electromagnetic wave signal according to the change of the material such as tunnel lining and internal cavity. Using the verified GPR model, B-scan data for the development of the GPR signal analysis technique were obtained, which can evaluate the thickness of the tunnel lining, the presence of the cavity, the effect of the waterproof membrane, and the frequency band.

A Study on the Design Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 설계하중에 관한 연구)

  • 천병식;신영완
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.96-108
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Structural analyses are done in various load combinations, and the member forces(moment, axial force and shear force) are compared. The adequate load combination of rock load and water pressure is proposed.

  • PDF

State of the Art of Segment Lining in Shield Tunnel and Statistical Analysis of Its Key Design Parameters (쉴드터널 세그먼트 라이닝의 최신 기술동향과 핵심 설계항목의 통계 분석)

  • Chang, Soo-Ho;Lee, Gyu-Phil;Choi, Soon-Wook;Bae, Gyu-Jin
    • Tunnel and Underground Space
    • /
    • v.21 no.6
    • /
    • pp.427-438
    • /
    • 2011
  • Segment lining is a key permanent lining structure to maintain the shield tunnel stability in shield tunnel operation. Moreover, segment lining generally accounts for the largest proportion in the shield tunnel construction costs. As a result, technical improvements to increase its economic feasibility have been actively carried out. This study aims to propose the development directions of high-performance segments from their recent cutting technologies. In addition, based on over 2,100 world-widely collected segment design data, a series of statistical analyses of segment key design parameters such as thickness, width and the number of divisions as well as segment materials were carried out to approximately estimate them in a design stage.

A study on hydraulic behaviour and leakage control of segment linings using the numerical method (수치해석을 이용한 세그먼트라이닝의 수리거동과 누수제어 연구)

  • Shin, Jong-Ho;Shin, Yong-Suk;Pam, Dong-In;Chae, Sung-Elm;Choi, Kyu-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.131-140
    • /
    • 2009
  • It has been repeatedly reported that a drainage system of a drained tunnel is deteriorated. And consequently the water pressure on the lining increases with time. However, little research on the watertight tunnel was found in the literatures. According to field measurements, leakage of the undrained tunnel has increased with time, which is completely opposite to the behavior of the drained tunnel. It is evident that the hydraulic deterioration of the tunnel lining changes the water pressure on the lining and the amount of leakage, thus the design coneept in terms of groundwater is not maintained tightly throughout the life time of the tunnel. The Segment lining is generally constructed as watertight. However, it is frequently reported that the leakage in the segment tunnel increases with time. It is also reported that the leakage is generally concentrated at the joints of the segments. In this study structural and hydraulic interaetion of the segment lining due to the hydraulic deterioration of the segments and the joints is investigated using the numerical modeling method. An electric utility tunnel below groundwater table is considered for the analyses. The effects of hydraulic deterioration of the segment lining are identified in terms of ground loading, water pressure and lining behavior. A remedial grouting measure for leakage is also numerically simulated, and its appropriateness is evaluated.

A Study on Development of the Controlled Low-Strength and High-Flowable Filling Material and Application of the Backfilling in Cavities behind the Old Tunnel Lining (고유동 충전재의 개발과 노후 터널의 배면공동 뒤채움에 관한 연구)

  • Ma, Sang-Joon;Seo, Kyoung-Won;Bae, Gyu-Jin;Ahn, Sang-Cheol;Lim, Kyung-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.177-184
    • /
    • 2002
  • The most tunnel damage such as cracks or leakage which exist in tunnel lining commonly, is caused by the cavities where exist behind the tunnel lining, through the tunnel safety inspections. These cavities were analysed to affect a stability of a running-tunnel seriously. This study is on the development of the controlled low-strength and flowable filling material which is able to apply to the cavity behind the tunnel lining. The major materials of backfilling developed are a crushed sand and a stone-dust which exists as a cake-state and is a by-product obtained in the producting process of aggregate. It is conformed with the design standard to the physical characteristics of backfilling. The backfilling material developed is designed to reduce the fair amount of cement. According to the designed compound ratio, it is carried out the laboratory tests such as a compressive strength and a chemical analyses and is applied to dilapidated old tunnel for an application assessment.

Basic Study for Evaluation on Application of Energy Lining Segment (Energy Lining Segment 적용성 평가를 위한 기초연구)

  • Han, Sang-Hyun;Park, Sisam
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.4
    • /
    • pp.143-147
    • /
    • 2013
  • Geothermal energy is easy to take advantage of renewable energy stored in the earth and the heat exchanger can be collected through a heat exchange piping system. In this study, have been developed a heat exchange pipe loop system which it could be installed in tunnel segmental linings to collect geothermal energy around the tunnel. The heat exchange pipe loop system incorporated in the tunnel segments circulate fluid to transport with heat from the surrounding ground and the heat can be used for heating and cooling of nearby structures or districts. The segmental lining incorporating heat exchange pipe loop system are called as ELS (Energy Lining Segment). There are a number of examples incorporating a heat exchange pipe loop system in a tunnel lining in Europe. In this study, a field case using Energy Lining Segment in Germany and applications in urban area are thoroughly examined. In addition, a CFD (Computational Fluid Dynamics) analysis was carried out to investigate heat flow in Energy Lining Segment.

Experimental Study on Internal Temperature Change Induced by Heating Element Attached to Tunnel Lining Surface (터널 라이닝 표면에 부착된 발열체로 인한 내부 온도 변화의 실험적 연구)

  • Jin, Hyunwoo;Hwang, Youngcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.11
    • /
    • pp.35-40
    • /
    • 2017
  • The rearside of concrete lining of tunnels constructed in cold region might experience on freezing due to the low temperature. This causes damage of concrete lining resulting in adverse affect on the durability as well as integrity of tunnel structure by causing damage to the concrete lining. In order to prevent the rearside of tunnel lining from freeing, the temperature change inside the concrete lining was measured by attaching a heating element to the tunnel lining surface and generating heat for a certain period of time. A special freezing chamber was developed to conduct the experiments considering in-situ environment. The carbone nanotube (CNT) was used as a heating element in this study. The temperature distribution of the concrete lining was measured by applying the heat to the heating element. The effect of the outside temperature and heating duration were analyzed.

Dynamic Behaviors of a Corrugated Steel Tunnel Lining System due to Wind Loads by Passing Vehicles according to the Boundary Conditions (구조물 경계조건에 따른 파형강판 터널라이닝의 풍하중에 대한 동적 거동분석)

  • Mha, Ho-Seong;Cho, Kwang-Il;Yoo, Sung-Heum
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.1
    • /
    • pp.47-58
    • /
    • 2012
  • Dynamic behaviors of a corrugated steel plate tunnel lining system are examined under wind loads due to passing vehicles. Applied wind loads are simulated by applying the time functions as a vehicle moves through the tunnel. Wind loads are described by the pressure and suction as a vehicle arrives and leaves target positions in the tunnel. The tunnel lining is modeled using the simplified shell elements that retain the characteristics of the corrugated shapes. The displacements of the tunnel lining are evaluated under various conditions regarding wind velocity and the passing vehicles. The responses are found to increase as the vehicle velocity and wind velocity increase. A maximum displacement of 25mm occurs when two vehicles are crossing at the speed of 120km/h. A row of vehicles running consecutively minimally affects the dynamic responses with less than 2.5% of the dynamic responses enlarged and attributed to one running vehicle. It should be noted that the dynamic responses of the tunnel lining should be considered when there is no shotcrete applied.