Study on deformation law of surrounding rock of super long and deep buried sandstone tunnel

  • Ding, Lujun;Liu, Yuhong
    • Geomechanics and Engineering
    • /
    • v.16 no.1
    • /
    • pp.97-104
    • /
    • 2018
  • The finite difference software Flac3D is used to study the influence of tunnel burial depth, tunnel diameter and lateral pressure coefficient of original rock stress on the stress and deformation of tunnel surrounding rock under sandstone condition. The results show that the maximum shear stress, the radius of the plastic zone and the maximum displacement in the surrounding rock increase with the increase of the diameter of the tunnel. When the lateral pressure coefficient is 1, it is most favorable for surrounding rock and lining structure, with the increase or decrease of lateral pressure coefficient, the maximum principal stress, surrounding displacement and plastic zone range of surrounding rock and lining show a sharp increase trend, the plastic zone on the lining increases with the increase of buried depth.

Evaluation of pore water pressure on the lining during tunnel operation (운영 중 터널에 작용하는 간극수압 평가기법)

  • Shin, Jong-Ho;Shin, Yong-Suk;Choi, Kyu-Cheol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.361-369
    • /
    • 2008
  • Control of ground water is one of the most important factors for long-term operation of tunnel because most of tunnel is located in the ground. In case of leakage tunnel, there is no pore water pressure on the lining when the drainage system is properly working. After long-term operation, however, the pore water pressure can be developed on the lining due to the deterioration of the drainage system. The increased pore water pressure on the lining is termed here as 'residual pore water pressure'. Residual pore water pressure can be measured by piezometer, but it is generally not allowed because of damages of drainage system. Therefore, an indirect and nondestructive method is required for evaluating the residual pore water pressure. Moreover, understanding of pore water pressure is needed during healthy operation of the lining. In this study, a new method for evaluation of pore water pressure on the lining during operation is proposed using theoretical and numerical analysis. It is shown that the method is particularly useful for stability investigation of pore water pressure on the lining during operation using theoretical analysis with normalized pore water pressure curve.

  • PDF

Development of optimized TBM segmental lining design system (TBM 세그먼트 라이닝 최적 설계 시스템 개발)

  • Woo, Seungjoo;Chung, Eunmok;Yoo, Chungsik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.13-30
    • /
    • 2016
  • This paper concerns the development of an optimized TBM segmental lining design system for a subsea tunnel. The subsea tunnel is normally laid down under the sea water and submarine ground which consists of soil or rock. The design system is the series of process which can predict segmental lining member forces by ANN (artificial neural network system), analyze suitable section for the designated ground, construction and tunnel conditions. Finally, this lining design system aims to be connected with a BIM system for designing the subsea tunnel automatically. The lining member forces are predicted based on the ANN which was calculated by a FEM (finite element analysis) and it helps designers determine its segmental lining dimension easily without any further FE calculations.

Characterization of deterioration of concrete lining in tunnel structures (터널 콘크리트 라이닝 구조물의 성능저하 특성)

  • Kim, Dong-Gyou;Jung, Ho-Seop;Bae, Gyu-Jin;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.387-394
    • /
    • 2009
  • The objective of this study is to evaluate the durability and deterioration of concrete lining in the seven conventional tunnels. These tunnels were constructed about 40~70 years ago, and closed about 10~40 years ago. The field investigation and various laboratory testings were performed for this study. It was observed from the visual, examinations that the concrete linings of 7 tunnels were severely deteriorated, such as, cracks, leakages, desquamation, and exploitations. The compressive strengths obtained from rebound hardness method and uniaxial compressive strength test on core specimens largely differed depending on the locations in the tunnel. The maximum compressive strength of concrete lining was greater about 2 times than the minimum compressive strength of concrete lining in the same tunnel. The results of micro-structural analysis showed that the substances deteriorating the concrete lining, such as ettringite and thaumasite, were detected in the concrete lining of tunnel.

Stress Analysis of Tunnel Concrete Lining for Maintenance Monitoring (유지관리 계측에 의한 터널 콘크리트 라이닝의 응력 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.3
    • /
    • pp.341-348
    • /
    • 2002
  • The purpose of maintenance monitoring is to offer the objective and continuous data in order to be lasting security affirmation and best fitted maintenance of tunnel structure. Though recently the examples of maintenance monitoring which Is applied to tunnel are rapidly increasing, long-term measured monitoring actual results and rationally analysis method researches are wholly lacking. In this study, it is analyzed that the relationship of stress and reinforcement stress of concrete lining, i.e., last support materials of tunnel through regression analysis based on the monitoring result of the subway tunnel, which was accomplished the monitoring for long period, passing the weathering. Also, through the analysis of the stress and the safety of concrete lining, it is estimated that the frequency of maintenance monitoring and the in-situ application of the criteria value of management.

A Study on the Groundwater Effects in the Design of Tunilel Lining (배수형 터널내 과다유입수가 터널의 안정에 미치는 영향)

  • Cheon, Byeong-Sik;Choe, Song-Am;Nam, Sun-Seong
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.125-140
    • /
    • 1995
  • Generally, the groundwater pressure is not considered in the design of concrete lining of bottom drainage tunnel. This design method implies that the phreatic surface is drawdown to the bottom of tullnel. When tile groundwater is continually supplied without changing of groundwater table, there is a possibility at which the groundwater pressure acting on the tunnel lining after the completion of tunnel. Therefore, the safety of tunnel lining must be checked in this case. In this paper, the stability of bottom drainage tunnel which is affected by groundwater discharge is analzed by using of the Finite Element Method at the 2 sections of subway where the groundwater level has a tittle change during the construction. As the result of analysis, the grouting for the water tightness and the permanent monitoring system of tunnel are required for maintaining of long-term stability of bottom drainage tunnel for the case of groundwater plassure acting on the tunnel lining is greater than that of design stage.

  • PDF

A Study on Fuzzy Logic Method for the Assessment of Tunnel Concrete Lining (터널 콘크리트 라이닝의 상태평가를 위한 퍼지추론기법 연구)

  • 이성원;조만섭;이광호;이석원;배규진;안영기
    • Tunnel and Underground Space
    • /
    • v.9 no.4
    • /
    • pp.337-349
    • /
    • 1999
  • There are many difficulties to the engineers in the assessment of tunnel safety. Consequently, objective assessment of concrete lining is hard even by the experts of tunnel assessment. Of several difficulties in the assessment of tunnel safety, in this study, tunnel concrete lining was focussed iud evaluated quantitatively and objectively using the Fuzzy theory which it generally considered to be appropriate for the assessment, control and judgment. T-FLAS based on fuzzy theory was developed in this study for the quantitative and objective assessment of the concrete lining in tunnels. Based on the application of T-FLAS on the evaluated field data, it was shown that the assessment system using fuzzy theory(T-FLAS) can be the effective and objective method for the assessment of concrete lining.

  • PDF

A Study on Controlling of Cracks Occurred at Crown of Tunnel Concrete Lining using Model Test (모형 실험에 의한 터널 콘크리트 라이닝의 천단부 균열 제어에 관한 연구)

  • Jeon, Joong-Kyu;Jeon, Chan-Ki;Kim, Nag-Young;Kim, Su-Man;Lee, Jong-Eun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.227-235
    • /
    • 2006
  • The problematic issue of cracking, water shedding in tunnel is recently coming out in the view of the structural stability. Hence, the assessment is required for the existing tunnels to achieve the structural soundness of tunnels, and their safety and maintenance. In this study, fracture behaviour and displacement of a tunnel concrete lining using steel fiber reinforcement concrete was investigated. The specimens were fabricated in single lining for a model of real road tunnel. As parameters, load condition, thickness of lining, whether or not rear cavity in crown, and a ratio of steel fiber in concrete were taken. From these factors, the load for crack and fracture, displacement, and the pattern of crack were looked into for the structural stability of a tunnel concrete lining.

Numerical Study on Failure Mechanism of Tunnel Shotcrete Lining (터널 숏크리트 라이닝 파괴 메커니즘에 대한 수치해석적 고찰)

  • Shin, Hyusoung;Shin, Dongin;Bae, Gyujin;Kim, Donggyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.167-177
    • /
    • 2009
  • This study investigates a failure mechanism of a tunnel shotcrete lining with respect to a concentrated load due to blocky rock mass. First of all, it is carried out to survey relevant researches to shotcrete failures by literature reviews and to numerically re-investigate the failure modes of shotcrete lining given by previous researches. Through this study, the failure modes are relocated with the conditions which induce each failure mode newly proposed by this study. In addition to this, the arching shape of tunnel lining, which has not been considered in the previous research despite of inherent geometrical characteristics in tunnels, is taken into consideration in numerical investigation on lining failure in this study. As a result, it is shown that more simplified failure modes can be found on the tunnel boundary condition and the corresponding failure condition to each mode can be different from ones of the previous study due to a tunnel arching effect.

  • PDF

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF