• Title/Summary/Keyword: Tunnel in use

Search Result 629, Processing Time 0.022 seconds

DESIGN OF THE CEMENT DEEP MIXING FOUNDATION FOR THE BUSAN-GEOJE IMMERSED TUNNEL

  • Kim, Yong-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09c
    • /
    • pp.96-103
    • /
    • 2010
  • The GK immersed tunnel as a part of the Busan-Geoje Fixed Link Project, introduced the immersed tunnel method into Korea for the first time. This challeging project to be completed in 2010 will open a new era to link oceans of the world with optimized design and safety for future use. The immersed tunnel method would possibly suitable for use in construction of a sub sea tunnel from Korea to Japan and from Korea to China that could potentially be built in the distant future. We hope the techniques learned from the Busan-Geoje Fixed Link Project can be applied to further projects in the near future.

  • PDF

A Study on site selection criteria and discharge capability evaluation for the multi-purpose use of a double-deck tunnel in a great depth (대심도 복층터널의 다목적 활용을 위한 입지선정 및 통수성능 평가)

  • Moon, Hoon-Ki;Kil, Ki- Oh;Song, In-Cheol;Lee, Hye-Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.3
    • /
    • pp.283-290
    • /
    • 2016
  • Recent, the construction of the multi-purpose double-deck tunnel is required to solve the flood protection and congested area at urban city. The multi-purpose double-deck tunnel is desperately needed for the introduction of efficient utilization of underground space in addition to the main feature of road capabilities. A basic review was performed for site selection to consider the control capability and features of road tunnel at the same time, and the processable flow in accordance with tunnels cross section of double deck tunnel. Site Selection Criteria for multi-purpose use of the double-deck tunnel has been proposed through the site selection criteria by use of the tunnels review. Also the estimation processable flow was performed to review the versatility of double-deck tunnel due to design of tunnel cross-section. Site Selection of double-deck tunnel from this study can be seen the need for a complex consideration through a variety of analyzes.

Algorithm-based Railway Tunnel BIM Design Considering Railway Alignment (철도 선형을 고려한 알고리즘 기반의 철도 터널 BIM 설계 방안)

  • Choi, Hyung-Lae;Jang, Kyung-Soo;Kim, Hyouk;Lee, Myeng-Ho;Park, Min-Sang
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.1-10
    • /
    • 2019
  • In process of creating BIM model for tunnel, many user use still CAD, so the workflow for BIM design is not perfect. Therefore, in this paper, we proposes a method to automatically create BIM model without converting 2D drawings in tunnel design. It can allow engineers to design BIM-based tunnel with maximum use of linear information and modify the BIM model whenever there is changed linear information. To do this, we use Dynamo, which can reduce the time required for creating and modifying BIM models during design changes, saving time wasted for BIM conversion design.

A Study of Classification of Road Tunnel for Fire Safety (안전성 향상을 위한 도로터널 등급에 관한 연구)

  • Yoo, Ji-Oh;Rie, Dong-Ho;Shin, Hyun-Jun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.3 s.71
    • /
    • pp.112-119
    • /
    • 2005
  • In road tunnel, in order to prevents an accident and minimize the damage of an accident in the case of fire, safety facilities and equipments are integral parts. The type and amount of safety facilities are based on tunnel type and length, traffic flow rate, etc. Therefore many countries use a tunnel classification system that categories tunnel into groups, and specifies the necessary emergency equipment for each group. In this study, for the purpose of classifying tunnel based on tunnel ist investigated the domestic and foreign standards and regulations for safety of road tunnel. As a results, we suggest the method of classification of tunnel by traffic performance, tunnel grade, the volume of traffic, fraction of HGV, rules or regulations for transports of dangerous good through tunnel.

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

Carpal Tunnel Syndrome among workers in a condom industry (한 콘돔공장근로자들의 수근관증후군에 관한 연구)

  • Kang, Joong-Koo;Paek, Do-Myung;Lee, Young-Jung;Ma, Hyeo-Il;Son, Mi-A;Lee, Hong-Ki;Choi, Jung-Keun
    • Journal of Preventive Medicine and Public Health
    • /
    • v.29 no.3 s.54
    • /
    • pp.507-519
    • /
    • 1996
  • The objectives of this study are to investigate the prevalence of occupation related carpal tunnel syndrome(CTS) among workers in a condom industry : to analyse the sensitivity and specificity of clinical signs or symptoms such as hand diagram, Tinel's sign and Phalen's sign in carpal tunnel syndrome : and to test vibration threshold test using audiometry as a technically easy and noninvasive method in the diagnosis of carpal tunnel syndrome in stead of nerve conduction velocity (NCV). The study group was divided into exposed group(39 cases) and non-exposed group(48 cases) based on whether or not excessive use of wrist movements exsist. 1. There are stastically significant differences in symptoms and signs of carpal tunnel syndrome such as hand diagram, Tinel's sign and Phalen's sign between exposed and non-exposed group(p<0.05). 2. Six cases(9 hands) were comfirmed as carpal tunnel syndrome by NCV. Five cases(7 hands) belonged to exposed group, 1 case(2 hands) to nonexposed group. As there are significant differences in prevalence of carpal tunnel syndrome between two groups(p<0.05), excessive use of wrist in occupation is a risk factor of carpal tunnel syndrome. 3. When we use NCV as a gold standard in the diagnosis of carpal tunnel syndrome, sensitivity and specificity of hand diagram, Tinel's sign and Phalen's sign is as followed; hand diagram , sensitivity 88.9%, specificity 84.2% Tinel's sign ; sensitivity 55.6%, specificity 72.8% Phalen's sign ; sensitivity 14.3%, specificity 88.4%. Among above clinical signs and symptoms, hand diagram is the best clinical screening test. 4. The differences of vibration threshold between median and ulnar nerve at the same time are useful in the diagnosis of carpal tunnel syndrome but the time change of vibration threshold of median nerve over time are not sensitive enough. It is concluded that vibration threshold between median and ulnar nerve at the same time can be used as a supplementary or alternative criterion to indicate that the nerve dysfunction is located in the carpal tunnel.

  • PDF

The Study On The Pre-displacement Before Face Of The Shallow Tunnel In The Weathered Soil (풍화토구간을 통과하는 천층터널의 막장선행변위에 대한 연구)

  • Kang, Suk-Ki;Yoon, Ju-Sang
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.947-954
    • /
    • 2008
  • Nowadays many urban subways are frequently constructed under the building and the river by the use of tunneling method. Especially, the majority of the tunnel are constructed even with shallow depth under the ground in the weathered soil. Since the tunnel are generally designed on the basis of the geographic soil investigation, the stability of the tunnel should be checked with the realistic data instrumented during construction. The displacement of the tunnel occurs in front of the end face during the excavation of the tunnel, which is called as pre-displacement. The total displacement can be figured from the exact pre-displacement, which is very difficult to measure without using any device installed in front of the tunnel end face. In this study, the pre-displacement measured from horizontal inclinometer was analyzed to know the co-relation with the total displacement and also, the trend and the characteristics of the tunnel deformation during construction was suggested through the regression analysis of the measured data.

  • PDF

A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site (터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로)

  • Baek, Yong;Koo, Ho-Bon;Yoo, Ki-Jeong
    • The Journal of Engineering Geology
    • /
    • v.12 no.4
    • /
    • pp.367-378
    • /
    • 2002
  • Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.

Estimation of Flow Uniformity in Water Tunnel by Using CFD Analysis (전산유동 해석을 이용한 수동의 유동 균질성 평가)

  • Lim, Y.T.;Chang, J.W.;Kim, M.S.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.12 no.3
    • /
    • pp.13-24
    • /
    • 2004
  • It is easier to view flow visualization by using a water tunnel rather than a smoke wind tunnel because of low speed at same Reynolds number. Using a water tunnel also produces more definite flow visualization by the use of various color dyes. The flow uniformity in test section is very significant for accuracy of the test because most flow experiments elicit results through the installation of a model in uniform flow. The purpose of small-size desktop-type water tunnel is not to produce quantitative measurements, but rather to give a visualization of the fluid flow phenomenon. However, uniformity in the test section affects the accuracy of the results. Accordingly, this research estimates uniformity in a water tunnel test section by using the commercially available CFD code FLUENT. Results of the CFD analysis show that the flow uniformity of the test section is good.

  • PDF

Development of a 3D Laser Scanner Based Tunnel Scanner (3D 레이저 스캐너 기반의 터널스캐너 개발)

  • SaGong, Myung;Moon, Chul-Yi;Lee, Jun-S.;Hwang, Seon-Keun;Kim, Byung-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.377-388
    • /
    • 2006
  • Most structures experience deterioration after construction. A routine inspection and maintenance must be accomplished for the efficient use of the structures. The routine inspection will play a major role on the determination of maintenance period and method. This study aims development of an automated tunnel inspection system based upon a 3 dimensional laser scanner. As for the initial stage of the project, a prototype tunnel scanner has been developed. The development of a tunnel scanner prototype follows comparison between image scanning and laser scanning system and investigation on the applicability and adaptivity of the scanners to the railway tunnel scanner. The applicability of the laser scanner on the railway tunnel has been confirmed from the pilot test by using commercialized general purpose close range laser scanner and applicability of a laser scanner as a railway tunnel scanner has been checked. From the result, a prototype of railway tunnel scanner has been built and the calibration of the system was carried out. Finally the developed tunnel laser scanner has been applied to different shapes and sizes of tunnels in use.