• 제목/요약/키워드: Tunnel Blasting

검색결과 375건 처리시간 0.023초

Shear strength behaviors of grouts under the blasting induced vibrations

  • Sagong, Myung;Choi, Il Yoon;Lee, Jun S.;Cho, Chung-sik
    • Geomechanics and Engineering
    • /
    • 제21권2호
    • /
    • pp.207-213
    • /
    • 2020
  • Umbrella Arch Method (UAM) often employed in the tunnel construction under poor rock mass conditions in Korea. Insertion of steel pipes at the periphery of the tunnel and infiltration of grouts along the pipes into the rock masses increases tunnel stability. There are two major effects of grouts expected at the tunnel face: 1) increase of face stability by enhancing the frictional resistance of discontinuities and 2) decrease of permeability along the rock masses. Increase of resistance and decrease of permeability requires a certain curing time for the grout. In Korea, we require 24 hours for curing of grout, which means no progress of excavation for 24 hours after infiltration of grouts. This step delays the tunnel construction sequences. To eliminate such inefficiency, we propose MTG (Method for Tunnel construction using Grouting technology), which uses extended length of steel pipes (14 m) compared to conventional pipe roof method (12 m). The merit of MTG is the reduction of curing time. Because of the approximately 2 m extension of the length of steel pipe, blasting can be done after infiltration of grouting. For this paper, we conducted experiments on the shear strength behaviors of grout infilled rock joint with elapsing of curing time and blasting induced vibration. The results show that blasting induced vibration under MTG does not influence the mechanical features of grout material, which indicates no influence on the mechanical behaviors of grout, contributing to the stability of tunnels during excavation. This result indicates that MTG is a cost effective and fast construction method for tunneling in Korea.

터널 심발발파공법 SAV-Cut(Stage Advance V-Cut)의 특징 및 현장적용 사례 연구 (A Case Study of the New Center-Cut Method in Tunnel : SAV-Cut(Stage Advance V-Cut))

  • 김동현;이상필;이훈연;이태노;전석원
    • 화약ㆍ발파
    • /
    • 제25권1호
    • /
    • pp.31-43
    • /
    • 2007
  • 현재 대부분의 국내 터널은 천공발파 기법을 이용하여 굴착되고 있다. 심발발파는 터널굴착면의 1 자유면 상태에서 가장 먼저 발파가 이루어지므로 터널발파에서 가장 중요한 단계이며 전체의 굴진효율과 진동 및 소음을 결정하는 역할을 한다. 여기서는 기존의 V-Cut 공법의 시공 편의성을 최대한 활용하면서 굴진효율을 개선시킨 새로운 심발발파 방법인 SAV-Cut (Stage Advance V-Cut) 공법을 소개한다. SAV-Cut 공법은 건설교통부에서 지정하는 건설 신기술(제518호)으로서 중앙공을 천공 및 선기폭하여 암반을 약화시킨 다음 경사공을 단계별로 기폭하는 것을 주요 특징으로 하고 있다. SAV-Cut 발파공법의 메커니즘을 수치해석과 여러 현장에 실제 적용을 통하여 검증하였고, 발파효율의 증대와 진동저감 효과를 확인하였다.

문화재로 지정된 무라이닝 암반터널 하부통과 설계사례 (A Case Design of a Tunnel Passing Under an Adjacent Unlined Tunnel Designated As a Cultural property)

  • 김선홍;정동호;석진호;박명렬
    • 터널과지하공간
    • /
    • 제17권2호
    • /
    • pp.152-164
    • /
    • 2007
  • 근래 철도를 이용한 물동량과 여객의 증가로 인하여 선로용량을 증대시키고 운영철도의 고속화를 추진하면서 기존 철도노반을 개량하는 건설공사가 많이 진행되고 있다. 이와 관련하여 기존노반과 인접하여 터널공사가 진행되는 경우가 종종 있으며 경우에 따라서는 터널폭 이내로 기존시설물과 근접되어 터널이 계획되는 경우도 있다. 공용중인 터널에 근접하여 터널을 계획하는 경우에는 기존터널에 미치는 영향을 검토하고 필요시 대책을 강구하여야 한다. 설계시 주요 검토사항으로는 시공시의 발파진동으로 인한 기존터널에 미치는 영향, 근접굴착으로 인한 기존터널의 안정성 확보 여부, 운행시 열차진동에 대한 영향분석으로 구분할 수 있다. 본고에서는 기존터널의 특성을 고려하여 국내외 기준 및 문헌을 통한 허용발파진동 선정 및 굴착계획 수립, 수치해석에 의한 안정성 분석, 경험식에 의한 열차진동의 영향 분석을 수행하였다.

지하 관 시설물과 인접한 소규모 단면 터널의 발파굴착 사례 (Blast Excavation of Small Diameter Tunnel near Underground pipe lines)

  • 원연호;김강규
    • 화약ㆍ발파
    • /
    • 제28권1호
    • /
    • pp.40-54
    • /
    • 2010
  • 메사쉴드공법은 주로 풍화토 또는 풍화암 구간의 소규모 굴착단면에 적용되며 대부분 인력굴착으로 이루어지나 막장면에 암반이 노출되면 유압력을 이용한 할암공법이나 발파공법의 적용이 불가피하다. 본 연구에서는 메사쉴드공법이 적용된 소규모 굴착단면 터널에서 터널상부에 상수도관 및 가스관 등이 근접되고, 강도가 높은 암반 노출로 인해 할암공법 대신에 125g의 최소장약량으로 심발공에서 초기진동을 제어하는 발파공법을 소규모 굴착단면 터널에 적용한 사례이다.

터널 발파에서 방음재질을 고려한 방음문 개발에 관한 연구 (Development of Noise-proof Facility Considered with Soundproofing Materials in a Tunnel Blasting)

  • 정재형;원연호
    • 한국지반환경공학회 논문집
    • /
    • 제12권3호
    • /
    • pp.27-35
    • /
    • 2011
  • 본 연구는 터널발파에서 소음저감을 목적으로 설치되는 방음시설 개발을 위하여 현장에서 주로 사용되는 방음재와 물, 모래 등을 이용하여 각 재질에 따른 소음저감효과를 판단하였다. 최대 소음레벨과 주파수의 범위를 측정하여 방음재질별 소음감쇠도와 주주파수 대역의 음압레벨을 고찰하였다. 그리고, 방음재료 분석의 결과를 반영하여 물과 스펀지 등으로 채운 개량형 워터튜브 방음문과 기존 스펀지 부직포 등으로 채운 방음문을 축소 제작하여 화약을 사용하여 실대형 현장실험을 통한 검증을 하였다. 그 결과 물을 차음재료로 사용한 경우에 기존 방음문에 비해 약 10dB(A) 정도의 소음 저감효과를 나타내었다.

선균열과 상부 심빼기를 이용한 환경 친화적 터널발파공법 (A Tunnel Blasting Method Favorable to the Environment, which Utilizes Pre-splitting & an Upper Center Cut.)

  • 김일중;김영석;기경철
    • 화약ㆍ발파
    • /
    • 제20권2호
    • /
    • pp.7-19
    • /
    • 2002
  • The cut is placed high up in the section, the 1st sloping holes below the cut, and divided all the holes located below the 1st sloping holes into a certain area with longitudinal section, to lower pollution made from tunnel blasting. With the sequential blasting machine, after I first blasted holes around the cut holes by a pre-splitting method, blasted the cut area and the 1st sloping holes. The 1st and 2nd sloping holes divided areas are initiated gradually to free face upwards made by the cut. Especially, I pre-splinted contour holes previous blast the before sloping holes from the contours. The ground vibration from the earth surface just over the advance face decreased about 42.0% compare with the down blasting method under the condition of equal charge weight per delay. I controlled the crack and over break of the mother rock by pre-splitting contour holes before blast the first sloping holes from the contours. The peak values of noise and air blast by blasting decreased about 10dB more than the down blasting method. the noise and air blast diminished gradually as a round. The throw distance of the fly rock was decreased about 55%.

터널굴착에서 다단식 발파기에 의한 전단면 발파의 적용성 연구 (Application of Full-Face Round by Sequential Blasting Machine in Tunnel Excavation)

  • 조영동;이상은;임한욱
    • 화약ㆍ발파
    • /
    • 제13권1호
    • /
    • pp.20-31
    • /
    • 1995
  • Many methods and techniques to reduce ground vibrations are well known. Some of them are to adopt electric milisecond detonators with a sequential blasting machine or an initiating system with an adequate number of delay intervals. The types of electric detonators munufactured in Korea include instantaneous, decisecond and milisecond delays byt numbers of delay intervals are only limite from No.1 to No.20 respectively. It is not sufficient to control accurately milisecond time with these detonators in tunnel excavation. Sequential fire time refers to adding an external time delay to a detonators norminal firing time to obtain sequential initiation and it is determined by sequential timer setting. To reduce the vibration level, sequential blasting machine with decisecond detonatore was adopted. A total of 134 blasting was recorded at various sites. Blast-to-structure distances ranged from 20.3 to 42.0 meter, where charge weight varied from 0.25 to 0.75 kg per delay. The results can be summarized as follow : 1. The effects of sequential blasting machine on the vibration level are discussed. The vibration level by S.B.M. are decreased approximately 14.38~18.05 to compare to level of conventional blasting and cycle time per round can be saved. 2. The empirical equations of particle velocity were obtained in S,B.M. and conventional blastin. $V=K(D/W^{1/3})-n$. where the values for n and k are estimated to be 1.665 to 1.710 and 93.59 to 137 respectively. 3. The growth of cracks due to vibrations are found but the level fall to within allowable value.

  • PDF

터널굴착시 천공 및 발파조건이 여굴의 크기에 미치는 영향 (Effect of the Drilling & Blasting Conditions on the Range of Overbreak in Tunel Excavation)

  • 김경훈;임한욱
    • 산업기술연구
    • /
    • 제24권B호
    • /
    • pp.3-17
    • /
    • 2004
  • Overbreak, underbreak and range of disturbed rock zone (DRZ) are the most important factors in evaluating the results of tunnel blasting. These factors, which depend on the discontinuities in rock mass, the blasting patterns and drilling conditions, have been studied. The range of DRZ can be estimated by relationships between vibration velocity and associated tensile stress. A new computerized rocket jumbo drill has been adopted to reduce overbreak based on the analysis of drilling accuracy. In-situ blasting tests were also performed by varying initiating systems. Overbreak can be reduce from 34.5cm to 20cm. The range of DRZ is 0.2m with stoping holes and 0.4m with wall holes respectively. In addition, some methods to reduce DRZ have been presented in this study.

  • PDF