• Title/Summary/Keyword: Tunnel Blasting

Search Result 375, Processing Time 0.022 seconds

1. NATM design changed into open type excavation on the 8 meter overburden of subway construction. (지하철 선로부 토피 8m의 경우 NATM공법설계를 개착공법으로 대체한 실례)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.10 no.2
    • /
    • pp.3-7
    • /
    • 1992
  • Concerning to Taeku city subway construction project(1-4 site), the original design was adapted NATM Tunnel method to the 8 meter thickness of overburden. Surveyor checked sity and design material and finally decided to change into Open Cut method because overburden is not only below 1 1/2 times thickness of comparate Tunnel width but there is no traffic conjunction in job site.

  • PDF

New Austrian Tunneling Method (일본의 NATM시공)

  • Toyoki Kadoya
    • Explosives and Blasting
    • /
    • v.9 no.4
    • /
    • pp.22-31
    • /
    • 1991
  • NATM technic had been applied to Nakaya tunnel of Sin kan express R.R lines in 1975. on the worst expandable geological conditions, application of NATM method was carried out good result. Measurement data which include convergencymeter, inclinometer, extensometor load-cell, strain gage data of shotcrete stress and steel arch. was explained with slides. Induced NATM technic has been improved since 1975 as follows, specially adhesive method of shotcrete instead of spray method such as tunnel swift lining Sliding press lining, clean lining by pumping and sweeping tote lining ets.

  • PDF

A Case Study of Tunnel Electronic Blasting to Control Vibration in the Proximity of the Safety Facilities (근접 보안물건의 진동제어를 위한 터널 전자발파 시공사례)

  • Seo, Yun-Sik;Woo, Sang-Don;Kwon, Yeong-Bok;Kim, Jong-Su;Choi, Hyeong-Bin;Kim, Seon-Hong;Kim, Gab-Soo;Kim, Jae-Hoon;Kim, Hee-Do;Lee, Jun-Won
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.37-51
    • /
    • 2012
  • In this case of "Seongnam~Yeoju double-lanes railroad construction", there were safety facilities which were concerned about damages from vibration and noise. In the project design stage, the rock-splitter method was designed to prevent them. The electronic blasting was considered to improve construction speed and economic value as an alternative tunnelling method, complying with the site's vibration criteria(cowhouse : 0.09cm/sec, residence : 0.2cm/sec). In the environment evaluation report of the eDev, tunnel electronic blasting systems, the blasting pollutions can be managed by the electronic blasting method. The results were successfully conducted with high speed construction without any damages to adjacent facilities.

Cost-effectiveness of Tunnel Blasting Pattern by Applying Large Blasting Holes (대구경의 발파공을 적용한 터널 발파 패턴의 비용 효과)

  • Choi, Won-Gyu
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.7
    • /
    • pp.147-152
    • /
    • 2020
  • The research is carried out to analyze the cost-effectiveness of blasting patterns with regard to the diameters and design of blasting holes. Blasting patterns for single diameter array, and mixed diameter array were comparatively analyzed with regard to drilling and charging time, and materials required. The number of blasting holes required for single array pattern and mixed array pattern were 138 and 93 holes, respectively. From the drilling time analysis, reduction in time and its efficiency of mixed pattern were 139 minutes and 25%, respectively, in comparison with single pattern. Charging time reduction and its efficiency of mixed blasting pattern were evaluated as 22.5 minutes per worker and 33%, respectively, compare to single blasting pattern. The explosive quantities of G1 and G2 required for single array patterns were 270 and 30, while those were 222 and 20 for mixed array patterns for tunnelling 4m. And single pattern required 45 more detonators than the mixed pattern. The evaluation of material required can also be positive parameter for cost reduction of tunnel construction.

Tunnel Stability Assessment Considering Rock Damage from Blasting Near to Excavation Line (굴착선 주변공 발파의 암반손상을 고려한 터널 안정성 검토)

  • 이인모;윤현진;이형주;이상돈;박봉기
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.4
    • /
    • pp.167-178
    • /
    • 2003
  • Damage and overbreak of the remaining rock induced by blasting can not be avoided during tunnel construction which may result in either short-term or long-term tunnel instability. Therefore, in this paper, a methodology to take into account the effect of blast-induced damage in tunnel stability assessment is proposed. Dynamic numerical analysis was executed to evaluate damage and overbreak of the remaining rock for the most common blasting pattern in road tunnel. Rock damage was quantified by utilizing the damage variable factor which is adopted proposed in continuum damage mechanics. The damaged rock stiffness and the damaged failure criteria are used to consider the effect of rock damage in tunnel stability analysis. The damaged geological strength index of the damaged rock was newly proposed from the relationship between deformation modulus and geological strength index. Also the Hoek-Brown failure criteria of the damaged rock was obtained using the damaged geological strength index. Analysing the tunnel stability with the consideration of the blast-induced damage of remaining rock, it was found that the extend of plastic zone and deformation increased compared to the undamaged rock. Therefore the short-term or long-term tunnel stability will be threatened when the rock damage from blasting is ignored in the tunnel stability analysis.

The Comparison of the Ground Vibration Velocity by Dynamite and Finecker Blasting (다이너마이트와 미진동파쇄기 발파에 의한 지반진동속도 비교)

  • Kim, Il-Jung
    • Tunnel and Underground Space
    • /
    • v.6 no.1
    • /
    • pp.39-47
    • /
    • 1996
  • The results of the regression analysis and comparative study between 120 vibration events by dynamite blasting and 68 vibration events by finecker blasting which were monitored in the test blasting are as follows: The ground vibration velocity of dynamite blasting of 0.12 kg charge weight per delay at 7.4 m above the explosive is higher than that of finecker blasting of 0.96 kg charge weight per delay. In the case of 0.12 kg charge weight per delay, the ground vibration velocity of finecker blasting is equal to 5.5% of that of dynamite blasting at the 10 m distance from explosive. The decrement of ground vibration velocity of dynamite blasting of above 0.12 kg charge weight per delay is larger than that of finecker blasting of below 0.96 kg charge weight per delay. The rate of ground vibration velocity of the finecker blasting to that of dynamite blasting decreases with the distance from explosives, but increases with the decrease of charge weight per delay. The increment of ground vibration velocity of finecker blasting is less than that of dynamite blasting with the increase of charge weight per delay at the same distance from explosives. Under the condition of the constant critical ground vibration velocity or use the same charge weight per delay, the blasting working by finecker rather than by dynamite is able to be performed at the nearer place to structures.

  • PDF

Experience of the Application of a Rock Cracking Method Using Steam Pressure to Tunnel Excavation (증기압을 이용한 파암공법의 현장 적용성 연구)

  • Kim, Duk-young;Kim, Sun-Woong
    • Explosives and Blasting
    • /
    • v.35 no.2
    • /
    • pp.1-8
    • /
    • 2017
  • In this study, the characteristics of a new rock cracking method using steam pressure are briefly presented. The rock cracking method was originally developed as a means to decrease the ground vibrations from underground rock excavations. The validation tests were also conducted by applying the method to an actual rock tunnel under construction. The ground vibrations were measured in the vicinity of the test site. The measured vibration results were compared with the values predicted by an attenuation equation, which had been proposed by a company in Japan. Also, a simple cost assessment for the method was conducted to demonstrate its cost effectiveness in underground tunnel excavations.

Study on Reducing Overbreak in Tunnel Excavation (터널에서의 여굴 저감 방안에 관한 연구)

  • Bae Sang-Hun;Kim Dae-Sang;Kim Mu-Il
    • Explosives and Blasting
    • /
    • v.23 no.1
    • /
    • pp.41-46
    • /
    • 2005
  • Overbreak is an inevitable during tunnel excavation. It significantly affects tunnel construction cost and safety The overbreak occurs due to incorrect expectations to the geologic structures, excessive charge or strength of explosives, etc. This paper introduces multi-hole drilling method to minimize the overbreak in tunnel excavation. Although the drilling cost of the method is more expensive than those of the existing other drilling method, it is expected at that cost will be reduced.

Application of TSP Suvey to Predict the Ground Conditions Ahead of Tunnel Face (터널막장 전방 파악을 위한 TSP(Tunnel Seismic Prediction) 탐사 사례 연구)

  • Cho, Sung-Won;Lee, Hyo;Yoo, Jae-Won;Kim, Do-Hun Dave;Nam, Seung-Hyeok
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.40-49
    • /
    • 2013
  • To predict ground conditions ahead of the tunnel face, seismic refraction survey has been widely used. But due to the development in seismic equipment and techniques, tomography using borehole and others are actively applied in recent years. This study has a purpose to prevent stability problems during excavation and construction of tunnels by predicting unfavorable ground conditions such as fault, fractured zone and rock quality variation zone ahead of the tunnel face using TSP survey equipment. In this study, the validity of predicting ground conditions ahead of tunnel face by TSP survey has been evaluated through the case study in the road construction site.

Tunnel Overbreak Management System Using Overbreak Resistance Factor (여굴저항도를 이용한 터널 발파 여굴 관리 시스템)

  • Jang, Hyongdoo
    • Tunnel and Underground Space
    • /
    • v.30 no.1
    • /
    • pp.63-75
    • /
    • 2020
  • When tunnel is excavated via drilling and blasting, the excessive overbreak is the primary cause of personal or equipment safety hazards and increasing the cost of the tunnel operation owing to additional ground supports such as shotcrete. The practical management of overbreak is extremely difficult due to the complex causative mechanism of it. The study examines the relationship between rock mass characteristics (unsupported face condition, uniaxial compressive strength, face weathering and alteration, discontinuities- frequency, condition and angle between discontinuities and tunnel contour) and the depth of overbreak through using feed-forward artificial neuron networks. Then, Overbreak Resistance Factor (ORF) has been developed based on the weights of rock mass parameters to the overbreak phenomenon. Also, a new concept of tunnel overbreak management system using ORF has been suggested.