• Title/Summary/Keyword: Tree Maintenance

Search Result 246, Processing Time 0.028 seconds

A Study on the Cost Criteria for Street Tree Pruning through Field Survey (현장실태 조사를 통한 가로수전정 원가기준 마련 연구)

  • Oh, jar-hoon;Ahn, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.210-211
    • /
    • 2022
  • Pruning is the most important work for the growth and aesthetics of street trees. It is also the most actively conducted maintenance work. However, the specifications, application methods, and cost criteria for pruning have not been systematically established. This has recently caused a lot of confusion in the practice of street tree pruning, such as indiscriminate pruning and lack of construction costs. Therefore, this study clarified the contents of work according to the form of pruning. It added 'aesthetic pruning,' which takes into account design. In addition, It revised equipment not in conformity with the law and excluded personnel necessary for on-site traffic control so that they could be reflected separately. As a result, this study is expected to contribute a lot to securing appropriate construction costs for maintaining street trees.

  • PDF

The Condition and Safety Assessment using Fuzzy Fault Tree Analysis for Bridge System (퍼지결함수분석을 이용한 교량시스템의 상태 및 안전성 평가)

  • 이중빈;나기현;손용우;박주원
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.79-86
    • /
    • 1999
  • This paper aims to propose a method that helps maintenance engineers to evaluate the damage states of bridge systems by using a Fuzzy Fault Tree Analysis(FFTA). It may be stated that Fuzzy Fault Tree Analysis may be may useful for the systematic md rational condition and safety assessment for real bridge systems problems because the approach is able to effectively deal with all the related bridge system damages in terms of the linguistic variables that incorporate systematically experts experiences and subjective judgement.

  • PDF

Fuzzy Reliability Analysis Models for Maintenance of Bridge Structure Systems (교량구조시스템의 유지관리를 위한 퍼지 신뢰성해석 모델)

  • 김종길;손용우;이증빈;이채규;안영기
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2003.10a
    • /
    • pp.103-114
    • /
    • 2003
  • This paper aims to propose a method that helps maintenance engineers to evaluate the damage states of bridge structure systems by using a Fuzzy Fault Tree Analysis. It may be stated that Fuzzy Fault Tree Analysis may be very useful for the systematic and rational fuzzy reliability assessment for real bridge structure systems problems because the approach is able to effectively deal with all the related bridge structural element damages in terms of the linguistic variables that incorporate systematically experts experiences and subjective judgement. This paper considers these uncertainties by providing a fuzzy reliability-based framework and shows that the identification of the optimum maintenance scenario is a straightforward process. This is achieved by using a computer program for LIFETIME. This program can consider the effects of various types of actions on the fuzzy reliability index profile of a deteriorating structures. Only the effect of maintenance interventions is considered in this study. However. any environmental or mechanical action affecting the fuzzy reliability index profile can be considered in LIFETIME. Numerical examples of deteriorating bridges are presented to illustrate the capability of the proposed approach. Further development and implementation of this approach are recommended for future research.

  • PDF

A Study on Reliability Centered Maintenance (통합신뢰성 경영에서 보전에 중점을 둔 신뢰성에 관한 연구)

  • Kim, Hwan-Joong
    • Journal of Applied Reliability
    • /
    • v.3 no.1
    • /
    • pp.73-82
    • /
    • 2003
  • Reliability Centered Maintenance(RCM) was initially developed for the commercial aviation industry in the late 1960s and now is equally applicable to a variety of equipment other than aircraft. RCM is a method for establishing a preventive maintenance program which will efficiently and effectively allow the achivement of the the required safety and availability levels of equipment and structures. RCM provides for the use of a decision logic tree to identify applicable and effective preventive maintenance requirements for equipment and structures according to the safety, maintenance requirements for equipment and structures according to the safety, operational and economic consequences of identifiable failures, and the degradation mechanism, reponsible for the those failures. The end result of working through the decision logic is a judgement as to the necessity of performing a maintenance task. In this paper, we provide guiding principles based on IEC 60300-3-11 for RCM analysis methods and operational method of structure and equipment.

  • PDF

A Study on RCM Approach to Catenary System of Electric Railway (전기철도 가공전차선로의 신뢰성 기반 유지보수(RCM)에 관한 연구)

  • Youn, Eung-Kyu;Choi, Kyu-Hyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.8
    • /
    • pp.1457-1465
    • /
    • 2016
  • A RCM approach to maintenance of the catenary system of electric railway is proposed. The proposed RCM approach provides a maintenance-oriented FMECA procedure to derive critical failure modes by analyzing failure effects and a RCM decision logic tree to suggest optimal maintenance works for the derived failure modes. By applying the proposed RCM procedures to the catenary system of high speed railway, it is suggested that strand breaks of dropper and voltage equalizing wire, and trolly wire wear-out are the critical failure modes for whom maintenance works based on condition monitoring should be applied instead of conventional time-based preventive maintenance. It is also proposed by reliability analysis that replacement time of dropper can be reduced from 18 years to 10 years. These results show that the proposed RCM approach can optimize the maintenance procedures of catenary system.

Development of an Integrated Management System for Maintenance Parameters and Rotary Machine of Hydro-power Plant (수력발전소 정비변수 및 회전체 통합관리 시스템 개발)

  • Shin, Sung-Hwan;Park, Jin-Ho;Yoon, Doo-Byung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.263-269
    • /
    • 2012
  • Condition-based maintenance (CBM) has been used as a useful concept for optimizing maintenance plan and decreasing maintenance cost in several kinds of plant sites. This study introduced an example that developed an integrated management system for maintenance parameters and hydraulic turbine of hydro-power plant in order to improve its maintenance system as applying CBM techinique. The integrated management system consists of three parts. One is a hardware part including PDA inspection system and several kind of precision measuring instruments. Another is a vibration monitoring system on hydraulic turbine. The other is a software part that takes charge of making hierarchy tree of maintenance parameters and their inspection route, managing accumulated database, assessing health condition of components, and supporting interface with other enterprise management system. The system has been installed at Chuncheon Hydro-power plant for test and demonstration. It is expected that the system can contribute database construction for diagnostics and prognostics on facility health condition and systematic accumulation of know-how on operation and maintenance of plant.

  • PDF

Development of an Integrated Management System for Maintenance Parameters and Rotary Machine of Hydro-power Plant (수력발전소 정비변수 및 회전체 통합관리시스템 개발)

  • Shin, Sung-Hwan;Park, Jin-Ho;Yoon, Doo-Byung;Son, Ki-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.6
    • /
    • pp.574-581
    • /
    • 2012
  • Condition-based maintenance(CBM) has been used as a useful concept for optimizing maintenance plan and decreasing maintenance cost in several kinds of plant sites. This study introduced an example that developed an integrated management system for maintenance parameters and hydraulic turbine of hydro-power plant in order to improve its maintenance strategy as applying CBM techinique. The integrated management system consists of three parts. One is a hardware part including PDA inspection system and several kind of precision measuring instruments. Another is a vibration monitoring system on hydraulic turbine. The other is a software part that takes charge of making hierarchy tree of maintenance parameters and their inspection route, managing accumulated database, assessing health condition of components, and supporting interface with other enterprise management system. The system has been installed at Chuncheon hydro-power plant for test and demonstration. It is expected that the system can contribute database construction for diagnostics and prognostics on facility health condition and systematic accumulation of know-how on operation and maintenance of plant.

Risk Evaluation of Tree Root Intrusion into Sewer Network (하수관망의 나무뿌리 침입 리스크 평가)

  • Han, Sangjong;Shin, Hyunjun;Hwang, Hwankook
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.6
    • /
    • pp.693-702
    • /
    • 2015
  • The objective of this study is to investigate and evaluate that a roadside tree root intrudes sewer network systems. Two approaches were performed to assess the characteristics of tree root intrusion. First, the characteristics of tree roots that had invaded sewers were directly observed by means of closed-circuit television inspection robot. Second, the intrusion proportions of tree root into rain gutters in the sampling area were investigated. As tree species of low intrusion proportions, the results indicated that Ginkgo biloba Linn. and Acer buergerianum Miq. were 1.7% and 4.3%. On the other hand, tree species of high intrusion proportions were Metasequoia glyptostroboides Hu et Cheng, Ulmus davidiana var. japonica Nakai and Zelkova serrata Makino as 22.2%, 20.4%, and 17.6% respectively. In particular, sewers and gutters around Zelkova species should be the focus of maintenance work because of the high proportion of these trees on roadsides.

Decision Making Model for Widening Bridges Using Decision Tree Technique (의사결정수 기법을 이용한 교량확폭에 관한 의사결정모델 개발)

  • Cho, Hyo Nam;Park, Jin-Hyung;Sun, Jong-Wan;Youn, Man-Keun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.4
    • /
    • pp.187-194
    • /
    • 2008
  • Recently, the constructions of widening bridges or new bridges are often undergoing as a part of road widening because traffic volumes are rapidly increasing caused by fast-growing population and urbanization. But in general, there is no rational decision process and specification to justify the validity of the bridge widening. Moreover, there are also numerous events including various uncertainties involved in widening bridges. In this paper, therefore, a decision making model is proposed for widening bridges using decision tree based on quantitative LCC analysis considering a variety of uncertainties for the rational and practical approach to a quantitative decision making for alternatives.

Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis (변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정)

  • Lee, Sung-Hun;Lee, Yun-Seong;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.