Kimpo International Airport, located within the Seoul metropolitan district, experienced a sudden surge of passengers and cargo in recent years. In 1990, MOCT sponsored feasibility studios and Youngjong Island location was selected as the most suitable choice among four proposed sites to build a new airport. The construction work was then commenced in November 1992. Phase I project facilities are scheduled to start its operation in March 2001 with an annual capacity of 27 million passengers and 1.7 million tons of cargo for both enplaning and deplaning from International liners. Kimpo International Airport will remain in operation primarily for domestic passengers and cargo only. Phase II project construction work will add two more runways with its related facilities by 2005. Inchon International Airport will then conveniently serve 100 million passengers for enplaning and deplaning, and 7 million tons of inbound and outbound cargo annually in its full capacity. All the airport facilities In phase I and phase II periods are constructed to meet international standards. A fully integrated transportation network and logistics function systems should be accomplished prior to the full operation of the airport. With these sccomplishments, the state-of-the-art airport is poised to meet the needs of a rapidly growing worldwide air transport industry, and will more than adequately fulfill its role as a hub airport for the Northeast Asia region.
PURPOSES: This study set out to investigate the current state of microsurfacing in Texas and compared the results with the current state of the practice nationwide. METHODS: For this study, case studies were extracted from the existing literature and compared with the data obtained both from site visits by the research team and data obtained from a survey by Texas Department of Transportation (TxDOT) personnel. The successes and failures of microsurfacing are detailed and explanations of different issues are outlined. Forensic studies from Texas are included in the descriptions of those microsurfacings that failed when configured as part of the cape seals. RESULTS : Microsurfacing has been shown to be an effective pavement preservation technique when applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues. The failures experienced in Texas can mostly be attributed to cape seals and an inability to recognize structurally faulty pavement. CONCLUSIONS : When applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues, microsurfacing has been shown to perform well in numerous case studies. The majority of microsurfacing failures are the result of poor project selection, usually involving the treatment being applied to structurally unsound pavement.
In this study, Microstructure and hardness of 1st layer with crystallographic orientation were investigated about solidification structure in multipass weld using high Mn-Ni flux cored wire. Microstructure of solidification consisted of austenite matrix and a little ${\varepsilon}-phase$ in grain boundaries. Orientation of grains was usually (001), (101), (111). According to crystallographic orientation, morphology of primary dendrite was different. The depletion of Fe and the segregation of Mn, C, Ni, Si, Cu, Cr, O were found along the grain boundaries. The area of segregation was wide with an order of (001), (101), (111) grains. And hardness of grains with crystallographic orientation increased with an order of (001), (101), (111) grains because of the segregation along dendrite boundary.
본 연구는 교통시설사업의 기본계획에 지리정보시스템(GIS)을 활용한 공간분석(spatial analysis)을 이용하여 교통효율성과 환경영향, 장래 국토계획의 목표, 도시영향 그리고 건설가능성 및 경제성을 통합하여 고려할 수 있는 노선선정의 방법론을 개발하기위하여 시도되었다. 본 논문은 총 4장으로 구성되어 있으며 1 장 서론에서는 연구의 배경, 목적 그리고 연구범위와 방법을 정립하였으며, 2장에서는 교통시설사업의 노선선정 방법론의 개발을 위한 목표설정과 방법론의 수행과정을 설명하였다. 3장에서는 개발된 방법론을 독일의노이스(Neuss)와 그로벤브로히(Grenvenbroich)간의 도로건성을 위한 노선선정 프로젝트에 적용하였으며 본 방법론의 평가와 이용가능성을 결론으로 제시하였다.
Improvement projects has been progressed for railway electrification and double track line in the conventional line as well as high speed line for the high speed and large transportation capability of railway. Especially, many variable operation plans are possible such as interaction between high speed line and conventional line and operation of tilting train due to the electrification of the conventional line. Railway electrification is more energy efficient and environmentally-friendly, but it has some problems such as an enormous initial construction and maintenance costs and electrical accidents. Therefore, the more intensive research will be progressed about railway electrification effectiveness for the continuous electrification project. So, we analyzed railway electrification effectiveness about the energy side using annual operation data of electric car and diesel car. The energy side was divided into energy costs and national energy consumption for analyzing electrification effectiveness about entire line and specific line. We verified advantage of energy costs and national energy consumption in this paper and this result will contribute to the progress of the continuous electrification project and the more efficient operation ways in electrification line
The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.
국토해양부에서는 건설산업의 정보화 수준을 향상시키고 건설 생산체계를 효율화시키기 위해서 건설 CALS(Continuous Acquisition & Life-cycle Support)사업을 추진하고 있다. 건설CALS사업은 1998년부터 시작되었지만 건설CALS의 정보화수준은 어느 정도인지에 대한 측정이 없었다. 본 연구에서는 선행연구에서 도출된 평가지표를 사용하여 건설CALS의 정보화수준을 측정하였다. 연구는 설문항 및 표본 구성, 설문조사, 설문조사 결과 분석의 절차로 진행하였다. 설문조사 결과, 빠른 시스템 장애복구, 시스템의 웹환경 구축, 높은 표준분류체계 활용, 체계적인 정보전략 계획 수립 측면에서 우수한 것으로 판단된다. 본 연구에서 제시하는 결과는 건설CALS의 정보화수준을 정확히 파악하는데 기여할 것이라 생각된다.
This study describes the effect of upstream curved pipe on internal flow characteristics ball valve. Continuity and three-dimensional Reynolds-averaged Navier-Stokes equation have been used as governing equations for the numerical analysis. The upstream curved pipe - ball valve model was assumed that it is used for Alaska pipeline project which was planned to provide reliable transportation of natural gas from ANS to Alaska-Yukon border. Therefore the characteristics of pipe and operating condition of pipeline were from report of Alaska pipeline project. The three curvature and three location of upstream curved pipe were analyzed. The results shows that there are typical flow patterns at ball valve and the upstream curved pipe makes some differences to the internal flow of ball valve.
This study describes the effect of T branch shape on internal flow characteristics inside itself. Continuity and three-dimensional Reynolds-averaged Navier-Stokes equation have been used as governing equations for the numerical analysis. The T branch was modeled assuming that it is used for Alaska pipeline project which was planned to provide reliable transportation of natural gas from ANS to Alaska-Yukon border. Therefore the characteristics of T branch and operating condition of pipeline were from report of Alaska pipeline project. The nine T branch shapes were analyzed and the mass flow rate ratio between mainline and branch was assumed to be 0.95 : 0.05, 0.9 : 0.1, 0.85 : 0.15. The results shows that there are typical flow patterns in T branch and the shape of T branch makes some differences to the internal flow of branch rather than mainline.
Journal of Construction Engineering and Project Management
/
제8권1호
/
pp.1-9
/
2018
US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.