The Effects of Rural Village Project on Business, Economic and Social Factor (농촌지역개발사업이 지역농가의 경제적, 사회문화적, 환경적 요인에 미치는 영향 분석 - 중요도와 실행도의 비교분석을 중심으로 -)

  • Jeong, Sang Sook;Maeng, Seung Jin;Rhee, Shin Ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.1
    • /
    • pp.77-88
    • /
    • 2020
  • This study had comparatively analyzed the influence factors of the farm village business on the local farmhouses centered on the level of importance and the level of performance. For this, a questionnaire survey had been conducted with 350 local residents who had participated in the Rural Field Forum of 14 villages, including Gyeongsangnam-do, Gyeongsangbuk-do, Chungcheongnam-do, Chungcheongbuk-do, Jeollabuk-do, etc. Excluding the insincere survey questionnaires, the final 232 people had been analyzed. As a result of the analysis of this study, the factors that have the influences on the diverse, rural areas had been compressed into the three factors of the lodging and the program, the special, rural area products, and the transportation and the accessibility. In the level of importance-level of performance analysis, it had been analyzed that the special, rural area products must maintain the continuity, that the transportation accessibility must avoid the excessive endeavor, and that the lodging program had a low priority order. Therefore, it can be said that it is necessary to concentrate the capability of the rural village business in the direction of developing the local specialties in the future. Next, after dividing the level of performance and the level of importance into the two groups each, the multiple group path analysis had been carried out. As a result, in the result of the analysis of the path that has an influence on the economic factor, the path coefficient of the level of importance of the transportation accessibility -> profit increase was 0.195+0.064 and the path coefficient of the level of performance of the transportation accessibility -> profit increase was 0.251+0.074. Therefore, both of them had the statistically significant amounts of the influences. This suggests that the transportation accessibility is an important element of the profit increase of the region. As a result, in the future, the research on the urban and rural exchanges using the even more convenient and inexpensive transportation means is needed. Most of them need the voluntary effort of the residents for being able to creatively develop and sell the native, agricultural, specialty products that are petty. Also, the rural areas need the diversities of the lodging programs and the recreational programs, a convenient reservation system, and the development of a unique tourism experience program. In the future, the researches that had been advanced in the even more detailed domain that is related to these factors are highly expected. Also, the analyses that had been carried out with even more areas and subjects as the targets are needed.

Advisable Direction of Sensitivity-Quality Factors on Railroad Sector (철도분야의 감성품질 요소 정립방향)

  • Song, Min-Ho;Park, Jae-Hyun;Kwon, Sun-Bak;Song, Yong-Su
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2250-2255
    • /
    • 2011
  • There has been a growing interest toward railroad conjunction with opening of high-speed rail in 2004 and concurrent implementation of nation's green growth policies. Meanwhile, users' expectation on service of public transportation, especially railroad has been growing than since ever due to heightened quality of life, entering aging society, voice of equity for minorities, and greater interest in environments of communities. In order to come up with the expectations, actual improvements for user's convenience/comfort and its assessment strategies in terms of service quality level are necessary. This study defines the index of this aspect of service level as 'Sensitivity Quality'. This is conceived as one of the important factors to define travel cost as do the travel time and fare, but hardly taken into consideration when assessing a transportation system or policy-making for a transportation project. The elements included for the assessment of the sensitivity quality in this study are feeling of a ride, conformability and convenience what users feel and recognize using a train. This paper suggests that establishing sensitivity quality elements would contribute in foundation of assessing service quality and provide improved public transportation services through their scientific and objective development and management.

  • PDF

A Study on the Evaluation Criterion and Method for the Assignment Results (수요예측결과의 평가기준 및 평가방법에 관한 연구)

  • 정천수
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.25-42
    • /
    • 1994
  • The traffic forecast is one of the most important analysis objects in the urban transportation planning process. The results of traffic forecast are the most widely used informations and give a critical influence on the major decision makings in the transportation planning process. Thus, they should be as much accurate and credible data, and evaluated to determine whether they are enough reliable to directly use in the planning process. However, the evaluation process is usually overlooked or abbreviated with a few exceptions according to the size and character of the project. Even though a planner or engineer tries to evaluate the assignment results, he/she is usually faced with certain difficulties since there are no established criteria and methods for the accuracy evaluation. Accordingly, the main purpose of this research placed on establishing the criteria and methods for the accuracy evaluation of the assignment results. The secondary purpose was to evaluate which assignment technique produces the most accurate assignment results by applying the established evaluation criteria and methods to an actual network. The research found that the proposed evaluation methods well operated in testing the accuracy of assignment results with few limits on application. Also, the incremental assignment was found to provide the best assignment results of existing assignment techniques (Stochastic, Iterative, Incremental, Equilibrium assignment) for the Seoul city network applied.

  • PDF

Technical and Economic Assessment of CO2 Transportation Options for Large-scale Integrated Carbon Capture & Sequestration(CCS) Project in South Korea

  • Lee, Ji Hyun;Kim, Beom-Ju;Kwak, No Sang;Shim, Jae-Goo;Shin, Su Hyun;Hwang, Sun-Na;Lee, Jung-Hyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.49-56
    • /
    • 2017
  • In order to examine the feasibility of Carbon Capture & Sequestration, a major technological strategy for the national goal of greenhouse gas reduction, this paper studies the various methods and corresponding costs for the transportation of $CO_2$ captured at the domestic thermal power plants, as well as performing comparative analysis with overseas CCS demonstration projects. It is predicted that the investment cost would be about 98 million USD when the using land-based pipelines to transport captured $CO_2$ from the thermal power plant located in the south coast. And using marine-based offshore pipelines, it will cost about twice the amount. When the captured $CO_2$ is transported from the power plant in the west coast instead, the cost is expected to increase substantially due to the transportation distance to the storage site being more than double to that of the south coast power plant case.

Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly (가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • v.34 no.6
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

Deeper Underground Greater Metropolitan Express Train Network Effect (긴급제언 - 대심도 광역지하급행철도 네트워크 효과)

  • Lee, Sun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.4
    • /
    • pp.45-50
    • /
    • 2009
  • The modal split structure of the Korea's transportation system has been dominated by road-oriented structure. The shortage of the inftrastructure to accommodate the rapidly increasing travel demand has brought about socio-economic losses such as severe traffic congestion and high logistic costs, and thereby weakened the competitiveness of the country. Highway transportation sector is more vulnerable to energy consumption comparing with railway sector since the highway sector is dependent mostly on fossil fuels for its energy source. In 2006 annual road cogestion costs in Korea reached 24.6 trillion won, with an average annual growth rate of 5.4%. The annual road congestion cost of intercity highways were 9.2 trillion won. As the new cities that recently developed are located far from Seoul area, the boundary of commuting in Seoul metropolitan area is extended. It makes passengers have longer trips with longer travel time, and the congestion problem to be more serious. In this regards, Gyeonggi Provincial Government proposed a deeper underground metropolitan express train system for the greater Metropolitan area. which is named as GTX. Gyeonggi Province suggested 3 key underground lines, based on the outcome of the feasibility study conducted by the Korea Society of Transportation, and submitted to the Ministry of Land Transportation and Maritime Affairs for its review. If the project is approved for construction and completed in 2016, the daily volume of surface traffic bound for Seoul will be reduced substantially and therefore the users will be benefitted for time savings by an annual amount of 2 trilion won every year.

  • PDF

A Study on Activation Methods of Connection System for Changwon & Masan Station in Gyeongjeon Line (경전선 창원.마산역의 연계체계구축 및 활성화 방안 연구)

  • Hong, Cheon-Hi;Oh, Yoon-Sic;Shim, Myeong-Gu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.703-721
    • /
    • 2010
  • Railroad is the environment-friendly green growth transportation system and it needs connection and transfer system. Connection system can be a national core project centered in main railroad stations. If there is no transfer system for customers, it's very difficult to achieve green growth and the activation service for public transportation. This study will introduce the establishment of connection & transfer system and the activation methods between main stations in South Gyeongsang area (Changwon, North-Changwon, and Masan) and other transportation modes. These methods will be the model for connection & transfer system of main stations, and will be applied to adopt methods for customers' convenience of railroad public transportation.

  • PDF

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

Development of Evaluation Model for ITS Project using the Probabilistic Risk Analysis (확률적 위험도분석을 이용한 ITS사업의 경제성평가모형)

  • Lee, Yong-Taeck;Nam, Doo-Hee;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.3 s.81
    • /
    • pp.95-108
    • /
    • 2005
  • The purpose of this study is to develop the ITS evaluation model using the Probabilistic Risk Analysis (PRA) methodology and to demonstrate the goodness-of-fit of the large ITS projects through the comparative analysis between DEA and PRA model. The results of this study are summarized below. First, the evaluation mode] using PRA with Monte-Carlo Simulation(MCS) and Latin-Hypercube Sampling(LHS) is developed and applied to one of ITS projects initiated by local government. The risk factors are categorized with cost, benefit and social-economic factors. Then, PDF(Probability Density Function) parameters of these factors are estimated. The log-normal distribution, beta distribution and triangular distribution are well fitted with the market and delivered price. The triangular and uniform distributions are valid in benefit data from the simulation analysis based on the several deployment scenarios. Second, the decision making rules for the risk analysis of projects for cost and economic feasibility study are suggested. The developed PRA model is applied for the Daejeon metropolitan ITS model deployment project to validate the model. The results of cost analysis shows that Deterministic Project Cost(DPC), Deterministic Total Project Cost(DTPC) is the biased percentile values of CDF produced by PRA model and this project need Contingency Budget(CB) because these values are turned out to be less than Target Value(TV;85% value), Also, this project has high risk of DTPC and DPC because the coefficient of variation(C.V) of DTPC and DPC are 4 and 15 which are less than that of DTPC(19-28) and DPC(22-107) in construction and transportation projects. The results of economic analysis shows that total system and subsystem of this project is in type II, which means the project is economically feasible with high risk. Third, the goodness-of-fit of PRA model is verified by comparing the differences of the results between PRA and DEA model. The difference of evaluation indices is up to 68% in maximum. Because of this, the deployment priority of ITS subsystems are changed in each mode1. In results. ITS evaluation model using PRA considering the project risk with the probability distribution is superior to DEA. It makes proper decision making and the risk factors estimated by PRA model can be controlled by risk management program suggested in this paper. Further research not only to build the database of deployment data but also to develop the methodologies estimating the ITS effects with PRA model is needed to broaden the usage of PRA model for the evaluation of ITS projects.

A Comprehensive Framework for Estimating Pedestrian OD Matrix Using Spatial Information and Integrated Smart Card Data (공간정보와 통합 스마트카드 자료를 활용한 도시철도 역사 보행 기종점 분석 기법 개발)

  • JEONG, Eunbi;YOU, Soyoung Iris;LEE, Jun;KIM, Kyoungtae
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.5
    • /
    • pp.409-422
    • /
    • 2017
  • TOD (Transit-Oriented Development) is one of the urban structure concentrated on the multifunctional space/district with public transportation system, which is introduced for maintaining sustainable future cities. With such trends, the project of building complex transferring centers located at a urban railway station has widely been spreaded and a comprehensive and systematic analytical framework is required to clarify and readily understand the complicated procedure of estimation with the large scale of the project. By doing so, this study is to develop a comprehensive analytical framework for estimating a pedestrian OD matrix using a spatial information and an integrated smart card data, which is so called a data depository and it has been applied to the Samseong station for the model validation. The proposed analytical framework contributes on providing a chance to possibly extend with digitalized and automated data collection technologies and a BigData mining methods.