• Title/Summary/Keyword: Transparent Management

Search Result 252, Processing Time 0.019 seconds

Egg Development and Morphological Change of Larvae and Juveniles of the Starry Flounder, Platichthys stellatus (강도다리, Platichthys stellatus의 난발생과 자치어의 형태발달)

  • Byun, Soon-Gyu;Lee, Bae-Ik;Lee, Jong-Ha;Ku, Hak-Dong;Park, Sang-Un;Yun, Seong-Min;Hwang, Seon-Young;Kim, Yi-Cheong;Han, Hyung-Gyun
    • Korean Journal of Ichthyology
    • /
    • v.19 no.4
    • /
    • pp.350-359
    • /
    • 2007
  • The egg development and morphological change of larvae and juveniles of the starry flounder, Platichthys stellatus were observed in laboratory. Fertilized eggs of the species, 1.09~1.19 mm (mean $1.13{\pm}0.03mm$, n=50) in diameter, were floating, colorless, transparent in shape and lacked in oil globules. The eggs hatched out 121 hours after fertilization at water temperature $8.2{\sim}11.2^{\circ}C$. The size of the hatched larvae were 2.58~2.89 mm (mean $2.67{\pm}0.09mm$) in total length, their mouth and anus were not open yet and myotome number was 14+27=41. Melanophore and xanthophore appeared on the notochord and digestive organ and the margin of membrane fin, on the yolk sac and eyes were lacking in pigment cells. 5 days after hatching the larvae attained 4.30~4.97 mm (mean$4.74{\pm}0.21mm$) in TL, and their mouth and anus were open. 10 days after hatching the larvae transformed to postlarval stage and they were 4.67~5.75 mm in TL (mean $5.30{\pm}0.31mm$), and absorbing the yolk completely. Feeding activity increased as the mouth became larger. At 23 days, the larvae attained 6.69~8.82 mm in TL (mean $7.85{\pm}0.75mm$), and the right eye was started moving to the left side of the head. At 52 days, the juveniles attained 10.99~17.06 mm in TL (mean $13.50{\pm}1.67mm$). The right eye was moved completely onto the left side. All of the fins had completed set of the fin rays (D. 64~67: A. 45~51: P. 11: V. 6: C. 19).

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF