• 제목/요약/키워드: Transmission line method

검색결과 1,067건 처리시간 0.034초

A Method for Fault detecting on Power Transmission Network by use of M-sequence Correlation

  • Nishiyama, Eiji;Kuwanami, Kenshi;Owaki, Kosuke
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.2570-2575
    • /
    • 2003
  • Monitoring a power transmission line is significant for power electric companies. In this paper, we propose a new method for detecting an fault point of power transmission line by use of M-sequence correlation technique. In this method, detecting signal is used as one or plural M-sequences ( same characteristic polynomial, including normal and reverse mark, synchronized ). In receiving point, we make same sequence with the input one and take crosscorrelation function between M-sequence and the received signal. We can see transfer fanctions of plural paths between inputs and a output taps separated from different of delay times on the crosscorrelation function, and from these transfer fanctions, so we compare them when fault occurred with in usual.

  • PDF

MEAC Method for Analysis of Power System Stability Improving Effect Considering Run-up SPS Function of HVDC (MEAC를 적용한 HVDC Run-up SPS의 안정도향상 효과분석)

  • Lee, Jae-Gul;Song, Ji-Young;Jang, Gil-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제66권10호
    • /
    • pp.1454-1459
    • /
    • 2017
  • In spite of continuous increase of electric power demand and new generation plants, it is very difficult to install new transmission line. Therefore, it comes to be difficult to operate the power system stable, so it is required to find another way to get new transmission capacity. Because HVDC transmission system installation is the one of the best option for us, we have undertake the HVDC project in mainland. Buckdangjin-Goduck HVDC project(500kV, 3GW) is currently under construction and Eastern Power HVDC project(500kV, 8GW) is under the study for technical specification. Both of them have the Run-up SPS function for taking action of 765kV Transmission line fault. The Run-up SPS function increases the active power output of the HVDC rapidly when the transmission line between the power plant and network is tripped, thereby preventing the generator from overspeed and improving the power system stability. In this paper, we propose MEAC(Modified Equal Area Criteria) method based on traditional EAC method to quantitatively evaluate the effect of the HVDC run-up SPS function on the power system stability improvement.

The Study of a Hairpin Line Resonator Filter Design by Using a J Inverter (J 인버터를 이용한 Hairpin Line 필터설계 연구)

  • 오데레사
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • 제6권4호
    • /
    • pp.589-594
    • /
    • 2002
  • The filter of hairpin type can be designed small but has a demerit which a design method is complex. This paper suggests the method that a hairpin line filter is designed with applying a transmission line method and J inverter circuit, accurately calculated the J value and the b parameter. It is considered about the line have no the mutual coupling element with next line to each other. is calculated a length of electric coupling line about coupling element in each inverter stage from the J value and the b parameter. In order to show the validity of the proposed design method, band pass filter of small hairpin line is designed at center frequency 2.6 GHz, with Serenade 8.0 software tool and the simulation characteristics are compared with design results.

A Transformation of Image Density making a Method of Plate in Printing a Gravure (제판방식에 의해 구분된 Gravure 인쇄의 농도 변화)

  • Jun, Joon-Bae;Shin Joong-Soon;Kang, Young-Reep
    • Journal of the Korean Graphic Arts Communication Society
    • /
    • 제20권2호
    • /
    • pp.69-83
    • /
    • 2002
  • This research attempts on plate making for gravure. Direct Hard Dot Method, Helio Kliso Graph, and Laser TB Dot; these three method are the most popular in Korea. For examining ink transmission, three plates were made in the above three different way for the same manuscript and were printed under the same condition. After printing speed was also varied into 150line/inch, 175line/inch, and 200line/inch, ink transmission was examined too. After printing the same manuscript with the above three method then the researcher examined level of ink transmission. Printing lines shows that Laser TB Dot Method and Direct Hard Dot Method were favorable level, while there was big differences of state of Helio Kliso Graph plate.

  • PDF

Calculate Transmission Reliability Margin using Probabilistic Load Flow (확률론적 조류계산을 이용한 송전 신뢰도 여유 계산)

  • Shin, Dong-Joon;Kim, Jin-O;Kim, Kyu-Ho
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.569-571
    • /
    • 2003
  • As a definition of NERC, Available Transfer Capability(ATC) is a measure of the transfer capability remaining in the physical transmission network for the future commercial activity. To calculate ATC, accurate and defensible TTC, CBM and TRM should be calculated in advance. In this paper, we propose a method to quantify TRM using probabilistic load flow based on the method of moment. Generation output, bus voltages, loads, and line outages are considered as complex random variables (CRV) to take into account for uncertainties related to the transmission network conditions. Probability Density Function (PDF) of line flow at the most limiting line is used to quantify TRM with the desired probabilistic margin. Suggested method is compared with the results from conventional CPF method and verified using 24 bus MRTS, and the suggested method based on PLF shows efficiency and flexibility for the quantification of TRM compared with the conventional method.

  • PDF

Prediction and Analysis of Electrical Environmental Characteristics under ±500kV HVDC Double Bipole Transmission Line (±500kV HVDC 2회선 송전선로의 전기환경특성 예측 및 평가)

  • Woo, Jeong Min;Ju, Mun-No;Shin, Koo Yong;Kwon, Gu Min;Choi, Woo Jung;Lee, Jae Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제67권4호
    • /
    • pp.554-560
    • /
    • 2018
  • Since Korea has a small land area, it is expected to construct the conductor return type with neutral wire in the case of ${\pm}500kV$ HVDC double bipole transmission line. Therefore, in order to apply ${\pm}500kV$ HVDC double bipole transmission line with neutral wire in Korea, it is necessary to develop technology for insulation and environmental designs. In this study, radio interference, audible noise, electric field and ion current density according to the polarity arrangement were compared and assessed in the ${\pm}500kV$ HVDC double bipole transmission line with the conductor return method. And the optimum configuration of HVDC double bipole transmission line was determined from the viewpoint of electrical environment.

A Digital Data Transmission Unit using Asynchronous Protocol for Power Transmission line

  • Nishiyama, Eiji;Kuwanami, Kenshi;Kitajima, Hiroyuki;Kawano, Mitsunori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2002년도 ICCAS
    • /
    • pp.79.6-79
    • /
    • 2002
  • We propose here sequential 2 methods for obtain information of current or potential data for power transmission line. One is a digital data transmission unit, this is, an output of a current sensor of power transmission line is digitalized by use of an easy asynchronous protocol. The unit has high speed transform rate, easy making header caused of consisting of only logic circuit. The other is, the output of the unit is transformed via LAN interface and displayed on a personal computer. We have confirmed remote measuring using the method for 100A and 240 A of the current information of power transmission line. Therefore we will be able to see a current waveform by use of internet at a cheep c...

  • PDF

Seismic responses of transmission tower-line system under coupled horizontal and tilt ground motion

  • Wei, Wenhui;Hu, Ying;Wang, Hao;Pi, YongLin
    • Earthquakes and Structures
    • /
    • 제17권6호
    • /
    • pp.635-647
    • /
    • 2019
  • Tests and theoretical studies for seismic responses of a transmission tower-line system under coupled horizontal and tilt (CHT) ground motion were conducted. The method of obtaining the tilt component from seismic motion was based on comparisons from the Fourier spectrum of uncorrected seismic waves. The collected data were then applied in testing and theoretical analysis. Taking an actual transmission tower-line system as the prototype, shaking table tests of the scale model of a single transmission tower and towers-line systems under horizontal, tilt, and CHT ground motions were carried out. Dynamic equations under CHT ground motion were also derived. The additional P-∆ effect caused by tilt motion was considered as an equivalent horizontal lateral force, and it was added into the equations as the excitation. Test results were compared with the theoretical analysis and indicated some useful conclusions. First, the shaking table test results are consistent with the theoretical analysis from improved dynamic equations and proved its correctness. Second, the tilt component of ground motion has great influence on the seismic response of the transmission tower-line system, and the additional P-∆effect caused by the foundation tilt, not only increases the seismic response of the transmission tower-line system, but also leads to a remarkable asymmetric displacement effect. Third, for the tower-line system, transmission lines under ground motion weaken the horizontal displacement and acceleration responses of transmission towers. This weakening effect of transmission lines to the main structure, however, will be decreased with consideration of tilt component.

Development of the Self-Build based Emergency Towers for Overhead Transmission Line (송전선로 비상복구용 자주조립식 철주 개발)

  • Byun Gang;Min Byeong Wook;Wi Hwa Bog;Park Jae Ung;Baek Soo Gon
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.494-496
    • /
    • 2004
  • Due to a typhoon named MAEMI on Sep12, 2004, 7 transmission towers collapsed and 3 were damaged in the Gyeongnam and Busan areas. These caused long-term black-outs in Goeje-do. When a transmission tower collapses or is damaged, Construction will take more than 2 months and this will be accompanied by long-term black-outs. Therefore a temporary iron pole is used in such emergencies. Current temporary rehabilitation angle steel iron Pole consistes of around 800 members, 2,800 bolts and it takes about 5 days to construct a temporary transmission line. Consiquently wide black-outs occur during the construction of the temporary transmission line. To reduce black-out time, the construction period must be reduced as much as possible. This paper presents new methods to reduce temporary transmission line construction time to within 48 hours by applying a self-reliance assembling method instead of the current man power assembling method and by modulizing each angle steel with duralumin.

  • PDF

A Digital Distance Relaying Algorithm in Combined Transmission Line Connected whth Overhead Line and Underground Cable (가공송전선로와 지중송전선로가 연계된 혼합송전선로에서 디지털 거리계전 알고리즘)

  • Ha, Che-Wung;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.440-442
    • /
    • 2000
  • This paper describes the digital distance algorithm in case of combined transmission line connected with overhead line and underground cable. Actually as fault is occurred in cable, it results in the complicated phenomena due to the several kind of grounding method in the sheath of cable. Accordingly the impedance. Therefore the correct impedance calculation algorithm is requested in combined transmission line to avoid the wrong trip of relay. This paper presents the development result of impedance calculation algorithm In such transmission line.

  • PDF