• Title/Summary/Keyword: Train vibration

Search Result 779, Processing Time 0.031 seconds

Identification of vibration source and vibration improvement design of forklift truck with trans-axle type power train (Trans-axle형태의 구동계를 갖는 지게차의 진동원 파악 및 저감설계)

  • 박인환;김성재;김낙인
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.855-860
    • /
    • 2001
  • In this study, the improvement work to reduce the steering wheel vibration of a forklift truck is performed. The forklift truck newly developed possesses a trans-axle type power train to achieve a compact and low-price design. The forklift truck is directly subjected to a high-level engine vibration through hard mounted trans-axle housing. The engine vibration shakes the whole system of the forklift truck, and then a high level local vibration of steering wheel could not be avoided. As the results, the vibration source and path mechanisms are experimentally identified and then an improvement design is proposed to minimize the steering wheel vibration.

  • PDF

Groundborne Vibration from Moving Train Loads in Tunnels Considering the Effect of Joints (터널내 열차주행시 절리영향을 고려한 지반진동)

  • 이종세;최기석
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.03a
    • /
    • pp.174-181
    • /
    • 2003
  • The groundborne vibration from moving train loads in tunnels could cause damages on structures and make people uneasy. With an aim at developing basis for effective screening measures, this paper attempts to study the characteristics of propagation and attenuation of groundborne vibration from moving train loads in tunnels considering the effect of joints. The wave propagation problem is modeled by a commercial code FLAC and the results are compared to those from using a finite-element-based code DIANA. It is shown that the groundborne vibration is affected significantly by the location and direction of joints.

  • PDF

Relation and Variation Trend between the Behavior of the Pantograph vs. the Vehicle Running Speed in Korean High Speed Train (한국형 고속전철용 판토그라프의 거동 특성과 열차속도와의 상관관계와 경향)

  • 목진용;박춘수;조용현;최강윤;김기환
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.11a
    • /
    • pp.170-176
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed and had been evaluating by through "G7- R&D for home grown high speed train technology". In this study, a relation in mechanical aspect between the train running speed and the current collecting performance of the pantograph is conducted.'for this study, a measuring system for current collecting performance and mechanical characteristics is developed and installed on the prototype Korean High Speed Train, and measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing unit. It monitors whether the hazard behavior in the pantograph is occurs or not, and measures acceleration and vertical contact force between the pan head and catenary. Through this study, evaluation of a mechanical vibration characteristics and trend of the pantograph and a interface performance of pantograph - catenary up to 200㎞/h train speed are facilitated.

  • PDF

Vibration sources and its countermeasures of high speed electric trains for subway (지하철용 고속전동차의 진동원 및 개선대책)

  • Park, Ki-Soo;Choi, Yeon-Sun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.244-250
    • /
    • 2007
  • The electric train in the first line subway runs faster in the block from Suwon to Cheonan than the general block. The faster run results in the deterioration of ride quality due to the increase of noise and vibration. To reduce the noise and vibration of the electric train, a running test of the electric train was performed in the block from Suwon to Cheonan. The experimental results show that the sources of the noise and vibration basically comes from the irregularity of the railroad track and the connection part between car body and bogie. The possible countermeasure of the high speed electric train can be the reinforcement of the center pivot to have more flexibility and the frequent maintenance of electric train.

  • PDF

Vibration Mode Analysis of Power Train on a Rear Wheel Drive Car (후륜구동차량의 동력전달장치의 고유진동형 분석)

  • Stuehler, Waldemar;You, Chung-Jun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.1894-1899
    • /
    • 2000
  • The Roadway caused through Power Train engine vibration and bad ride comfort. It is very important to analyze the vibratory characteristics. The mathematical models on the Power Train, which is composed of engine-/transmission block, universal joint shaft, differential, rear axle arm and wheels, are developed and is verified by the experiments. This Paper describes the coupling influence occurred through a complete drive system for the power train. Dies study is carried out computationally with a calculation program and experimentally with the aid of the mode analysis.

  • PDF

The Study on the Optimal Suspension of a Tilting Bogie for Vibration Reduction (한국형 틸팅대차의 진동저감을 위한 최적현가장치 연구)

  • 김정석;구동회;김남포
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.372-377
    • /
    • 2004
  • Tilting bogie system allow the train to pass curve at higher speed without affecting passenger comfort. As the tilting trains offer the optimum means of providing faster and more comfortable rail service with minimum of environmental disturbance and capital investment, mere than 14 countries have now adopted or are about to adopt tilting train technology. The Korean National Railroad is also planing to apply faster tilting train to the areas where the High speed rail service are not provided. This paper describes the parametric study to achieve the optimal suspension parameters of the Bogie for 180 km/h Korean Tilting Train(TTX) from the view point of the vertical and lateral vibration reduction.

  • PDF

Static equilibrium and linear vibration analysis of a high speed electric train system (고속전철 시스템의 정적평형 및 선형진동 해석)

  • 김종인;유홍희;황요하
    • Journal of the Korean Society for Railway
    • /
    • v.2 no.4
    • /
    • pp.1-8
    • /
    • 1999
  • A formulation to perform static equilibrium and linear vibration analysis is presented in this paper. The formulation employs minimum number of equations of motion which are derived by using a partial velocity matrix. The static equilibrium analysis is performed first, then the linear vibration analysis is performed at the static equilibrium position. By using the formulation presented in this paper, static equilibrium and linear vibration analysis of a high speed electric train system are performed. A single bogie system, a power car vehicle, and a train system which consists of five vehicles are analyzed, respectively. Natural frequencies and a few lowest mode shapes of the two are identified in this paper.

  • PDF

The Estimation of Structural-Borne Noise and Vibration of the Bridge under the Passage of the Light Rail Transit (경량전철 교량 상부구조의 열차주행에 대한 진동 및 소음 분석)

  • Yeo, In-Ho;Chung, Won-Seok;Kim, Sung-Choon;Kim, Sung-Il
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.22-28
    • /
    • 2007
  • During the passage of the train, the railway bridge undergoes vibration and noise. The noise of railway bridge can be occurred from various sources. The wheel-rail contact, noise from machinery parts, structural-borne noise, pantagraph noise and aerodynamic noise of the train work in combination. Running train is one of the most important factors for railway bridge vibration. The repeated forces with equidistant axles cause the magnification of dynamic responses which relates with maintenance of the track structure and structure-borne noises. The noise problem is one of the most important issues in services of light rail transit system which usually passes through towns. In the present study, The vibration and noise of the LRT bridge will be investigated with utilizing dynamics responses from moving train as input data for noise analysis.

Vibration reduction of the high-speed EMU for improvement of ride comfort (승차감 향상을 위한 동력분산형 고속전철의 진동저감)

  • Baek, Seung-Guk;Lee, Rae-Min;Shin, Bum-Sik;Lee, Sang-Won;Koo, Ja-Choon;Choi, Yeon-Sun
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1435-1440
    • /
    • 2008
  • High-speed train under development is a type of EMU(electric multiple units). Since power sources like motors and gears are distributed in the high-speed EMU, the high-speed EMU generates vibration and sound more than the articulated high-speed train. Vibration of vehicle, vibration between rails and wheels, hunting of bogie and snake motion reduce ride comfort. In this paper, to decrease the vibration of the articulated high-speed train, improvements were presented using an analytical model and a simulation model. The simulation model of the high-speed EMU was designed on the basis of the korean high-speed train and the design parameters for ride comfort were showed and the dynamic characteristics of the vehicle was understood. To consider the characteristics of the vehicle suspension, the analytical model was designed and the simulation model was verified with it.

  • PDF

A Measurement and Analysis on the Noise of 'Mugungwha' Train (무궁화 열차의 소음 측정 및 분석)

  • 신민철;왕세명;조준호;김대성
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.394-399
    • /
    • 2004
  • Train is one of the most famous and convenient transporting ways. However, the noise problem caused by the train hinders people from living in a silent environment. Furthermore, this problem is related with the environmental rights of people nearby the railroad. The estimation of train noise is the pre-research of train noise reduction. This research is about measurement and analysis of train noise which can be a base-study about the estimation of train n(lise. The noise of ‘Mugungwha’ train, the most frequently used train in Korea, is the main object in this measurement and analysis. The characteristics of the train noise were evident in the criteria of height, distance and velocity. Furthermore, the noise differences between locomotive and passenger coach were observable.

  • PDF