• Title/Summary/Keyword: Train operation stability

Search Result 76, Processing Time 0.027 seconds

Mechanical characteristics + differential settlement of CFG pile and cement-soil compacted pile about composite foundation under train load

  • Cheng, Xuansheng;Liu, Gongning;Gong, Lijun;Zhou, Xinhai;Shi, Baozhen
    • Geomechanics and Engineering
    • /
    • v.20 no.2
    • /
    • pp.155-164
    • /
    • 2020
  • In recent years, the stability, safety and comfort of trains has received increased attention. The mechanical characteristics and differential settlement of the foundation are the main problems studied in high-speed railway research. The mechanical characteristics and differential settlement of the foundation are greatly affected by the ground treatment. Additionally, the effects of train load and earthquakes have a great impact. The dynamic action of the train will increase the vibration acceleration of the foundation and increase the cumulative deformation, and the earthquake action will affect the stability of the substructure. Earthquakes have an important practical significance for the dynamic analysis of the railway operation stage; therefore, considering the impact of earthquakes on the railway substructure stability has engineering significance. In this paper, finite element model of the CFG (Cement Fly-ash Gravel) pile + cement-soil compacted pile about composite foundation is established, and manual numerical incentive method is selected as the simulation principle. The mechanical characteristics and differential settlement of CFG pile + cement-soil compacted pile about composite foundation under train load are studied. The results show: under the train load, the neutral point of the side friction about CFG pile is located at nearly 7/8 of the pile length; the vertical dynamic stress-time history curves of the cement-soil compacted pile, CFG pile and soil between piles are all regular serrated shape, the vertical dynamic stress of CFG pile changes greatly, but the vertical dynamic stress of cement-soil compacted pile and soil between piles does not change much; the vertical displacement of CFG pile, cement-soil compacted pile and soil between piles change very little.

Tilting Train-induced Roadbed Response on the Conventional Line (틸팅열차 주행시 기존선 흙 노반의 응답특성)

  • Koh, Tae-Hoon;Kwak, Yeon-Suk;Hwang, Seon-Keun;SaGong, Myung
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.5
    • /
    • pp.433-441
    • /
    • 2011
  • It is a fact that the straightening of track alignment is one of the undoubted ways to improve the train speed on conventional lines, while that requires huge investment resources. Therefore, the operation of a tilting train as well as the minimum improvement of track is suggested as an effective and economical alternative way for the speed-up of conventional lines. Since a driving mechanism of tilting train is different from those of existing trains, in order to make sure its operation safety and stability on conventional line, the performance of track and roadbed must be preferentially evaluated on the conventional line. Furthermore, it is necessary to estimate the tilting-train-induced roadbed response in detail since the roadbed settlement can lead to the track deformation and even derailment. In this research, the patterns of wheel load and lateral force were monitored and analyzed through the field tests, and the derailment coefficient and degree of wheel off-loading were calculated in order to evaluate the tilting train running safety depending on the running speeds (120km~180km) on the conventional line. Moreover, roadbed pressure, settlement and acceleration were also observed as tilting-train-induced roadbed responses in order to estimate the roadbed stability depending on the running speeds. Consequently, the measured derailment coefficient and degree of wheel off-loading were satisfied with their own required limits, and all of the roadbed responses were less than those of existing high-speed train (KTX) over an entire running speed range considered in this study. As a result of this study, the tilting train which will be operated in combination with existing trains is expected to give no adverse impact on the conventional line even with its improved running speed.

Analysis of time-saving effects on increasing the speed through the trial run test in Gyeongbu line (틸팅시제열차 경부선 증속시험운행을 통한 시간단축효과분석)

  • Han, Seong-Ho;Lee, Su-Gil
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1935-1942
    • /
    • 2011
  • We have tested the developed Korean tilting train in main exisiting commercial line for speed-up on cuve section to achive reduction effects of running time. We have conducted a trial run test to speed-up 30km/h on curves in Gyeongbu line successfully. Normal current train have been operated 110km/h in 600m radius. Yet, tilting train was tested 135km/h(maximum operation line speed) in same sections. We confirmed that the dynamic runing stability of train was safety by regarding wheel load and lateral force.

  • PDF

A Study on the Contact Force between Catenary and Pantograph in Duplicate KTX-II Operation

  • Kang, Seung-Wook;Kim, Sang-Ahm;Kim, In-Chol
    • International Journal of Railway
    • /
    • v.6 no.1
    • /
    • pp.1-6
    • /
    • 2013
  • Electric railway system driving the electric cars using power from catenary has been secured by performance of stable tracking between pantograph and catenary. The performance of the power collecting of pantograph is the one of the most important skills for high-speed train speed. The first Korea high-speed train(KTX) is 20 cars in one train set. In the meantime, collecting capability of single pantograph collector at one train set was confirmed through evaluation of the performance and the stability test. However, more research is needed to build for a stable collecting capability of coupled Korea's KTX-II High-speed system which is developed in Korea. In this study, actual vehicle test of coupled KTXSanchon was made to analyzing the data presented by the dynamic nature of catenary and pantograph, and the interface characteristics.

Rail Transport Operation Control for Railway Embankment under rainfall (강우시 성토사면의 열차운전규제기준)

  • Kim, Hyun-Ki;Shin, Min-Ho;Choi, Chan-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.225-232
    • /
    • 2009
  • Infiltration of rainfall causes railway slopes to be unstable and may result in failure. Basic relationship between the rainfall and stability of railway embankment is defined to analyze its stability by rainfall. An experimental study for defining of infiltration rate of rainfall into slope is conducted in the lab. The results of Rainfall infiltration show that rainfall infiltration is not equal to infiltration as like reservoir because rate of rainfall infiltration is controlled by slope angle. Based on these results, boundary condition of rainfall is altered and various numerical analysis are performed. The variation of shear strength, the degree of saturation and pore-water pressure for railway slope during rainfall can be predicted and the safety factor of railway slope can be expressed as the function of rainfall amount, namely rainfall index. And suggested rainfall index is compared with the rail transport operation control which is used in KORAIL. It is judged that this rainfall index can be a good tool for the rail-transport operation control.

  • PDF

Experimental Study to Measure the Characteristics of KTX Train Wind Pressure by using Field Test (KTX 열차풍압 특성을 측정하기 위한 선로변 현장 실험 연구)

  • Nam, Seong-Won;Kwon, Hyeok-Bin;Nam, Yoon-Su
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.6
    • /
    • pp.575-580
    • /
    • 2008
  • When constructing a high-speed railroad, the reduction of the distance between track centers and the width of track bed will save the construction cost. However the shortening the distance between track centers may cause the stability problems due to higher wind pressure. Therefore the extensive technical review and aerodynamical study should be performed to determine the adequate distance between track centers. In this study, the impact that the increase in wind pressure due to the change of aerodynamic phenomena with the change of the distance between track centers may have on two trains passing by each other was predicted, and the stability of train operation was analyzed in order to review the distance between track centers suitable to Honam HSR trains. And we estimated the aerodynamical effects by the results of the field test.

Application of Flexible Sintered Brake Pad for TTX (한국형 틸팅열차용 Flexible 소결 브레이크 패드 적용 연구)

  • Ku, Seong-Mo;Lee, Dong-Kyun;Ko, Tae-Hwan;Na, Jong-Tae;Kim, Sang-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.597-603
    • /
    • 2010
  • Metallic sintered brake pads are often applied to Mid/High Speed Train due to its high strength and thermal characteristics. Because of its imbalance contact between discs and pads can greatly influence the life span, one sided wear, discs attack/crack and threat the safety of the train during operation. In this research, we analyzed pressure/temperature distribution between brake pads and disks. Analyzed data had been verified and modified to conduct further tests of Flexible brake pads with small/full-scale dynamo test. Flexible brake pads were installed to TTX train to conduct further tests to identify the differences between Rigid brake pads and Flexible brake pads. In result, Flexible brake pads showed outstanding disk thermal stability, one sided wear, noise and life of pad than rigid brake pad.

  • PDF

Technology development on automatic changeover system in neutral section with energized condition of electric railway catenary system (절연구간 무접점 자동 전원절체 통과시스템 기술개발)

  • Hong, Hyun-Pyo;Han, Moon-Seob;Seo, Myung-Seok;Shin, Myong-Cheol;Yoon, Yong-Han;Kim, Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.498-506
    • /
    • 2010
  • The neutral section was installed in order to prevent conflict with different phase angle source in electric railway catenary system. The speed of electric train reduced due to coasting operation by notch off when it passed the neutral section. And, the catenary wire was damaged and the accident might be happened because of the arc generation when the electric train passed the neutral section with notch on condition. This project has a goal to develop the automatic changeover system using by noncontactless semiconductor device in neutral section of catenary system so that the train pass as notch-on condition. In this first year, we obtain as following results such as domestic and international systems applications and completion requirements, development and analysis of stability for automatic changeover system, design of static switching device on automatic changeover system in neutral section and drawing up interface design and specifications according to equipment.

  • PDF

Measurement and analysis of support stiffness of the track which rubber ballast-mat installed (방진자갈매트구간 궤도지지계수 측정 및 분석)

  • Yang, Shin-Chu;Lee, Jee-Ha;Kim, Eun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1071-1076
    • /
    • 2007
  • In high-speed line, at some part of the track which rubber ballast-mat installed, track irregularity grew rapidly and affected riding comfort and train running stability. It is urgently requested to establish counter-measures which can be applied to track under operation. To do this, it is very important to analysis the origin of that phenomenon before. Track support stiffness is an essential factor for evaluating track condition. Sudden changes of support stiffness along track occur instability of train and bad riding comfort. Preventing sudden changes of track support stiffness is a key technique in high-speed track maintenance. Besides the sudden changes, the magnitude itself also significantly affects track and train. Low stiffness of ballast-mat makes ballast acceleration area wider. And it may accelerate track irregularity growth. So, the stiffness should be limited. To calculate track stiffness, measuring load and displacement on track is needed. In this study, the behavior of the track which rubber ballast-mat installed was measured and analyzed to understand the origin of rapid growth of it.

  • PDF

Noise Reduction of Traction Motor for High Speed Train (고속전철용 견인전동기 소음개선)

  • Kim, Jung-Chul;Kim, Dea-Kwang;Kim, Bong-Chul;Park, Yeong-Ho;Choi, Jong-Mook
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.95-100
    • /
    • 2007
  • The traction motor for High Speed Train is being required reliability and stability for high-speed operation. And also required low noise level, high performance, compact size owing to the space and weight limitation for attaching to train, etc. As a result of requiring the low noise level and high power capacity, it is adopted forced-air-ventilation insead of self-ventilation that is generally used on electric multiple unit. Traction motor is cooled by cooling air through the air-ventilation hole. When the traction motor is operated with forced-air-ventilation, there is some abnormal noise in the specific RPM. This paper is dealing with the method to reduce the resonance phenomena by adopting the rotor blade.

  • PDF