• Title/Summary/Keyword: Train operation

Search Result 1,263, Processing Time 0.043 seconds

Automatic Train Operation System Requirements Examination for Driverless Operation and Application Case of Urban Maglev Train (무인운전을 위한 자동열차운전장치 시스템 요구조건 검토 및 도시형 자기부상열차 적용사례)

  • Kang, Kyeong-Yong;Cho, Young-Wan;Park, Hee-Jun;Park, Chae-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1100-1107
    • /
    • 2011
  • The light-rail system which is recently being built in Korea is a train control system based on driverless operation, and the train control system for urban maglev train under construction at the moment in Youngjong-Do, Incheon is pushed ahead based on driverless operation. In this paper, it compares train operation cases with manned operation and unmanned operation to examine system requirements for unmanned driving on train and detects system requirements of automatic train operation device for unmanned operation by analyzing unmanned operation cases which are currently operating or planed project and also introduces automatic train operation of urban maglev train and verifies whether the system for unmanned driving meets the requirements.

  • PDF

Train Regulation by the Advanced Algorithm for Subway (개선된 알고리즘에 의한 지하철 운행간격 제어)

  • Park, Hong-Kyu;Shim, Won-Sup;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

The Establishment of Train Operation Plan in Railway System (철도시스템의 운전계획 수립)

  • 이동근;고영호;권정원
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.929-936
    • /
    • 2002
  • This paper presents a Rotem's methodology for the establishment of train operation plan in Railway system. Train operation plan is the key prior plan to proceed the design of the civil and E&M relevant subsystem. But, due to the limitation of the environmental and project condition, common consensus to the key factors which make up the operation plan have not been accomplished. So, as a result of this comparative review for the general approaching method of train operation plan and application status of the major key factors being performed by Rotem, we will get the opportunities to improve the accuracy of the train operation plan.

  • PDF

Development of Generic Train Operation Model Based on Korean Urban Transit Regulations

  • Lee, Young-Hoon
    • International Journal of Railway
    • /
    • v.4 no.4
    • /
    • pp.81-85
    • /
    • 2011
  • This paper discusses the development of a generic train operation model from a set of Korean Urban Transit Regulations such as Regulation for Train Operation of Urban Transit, Regulation for Safety Requirements of Urban Transit and so on. It is to communicate with various stakeholders on urban transit system, and to elicit copious requirements in performance of the urban transit train operation based on the model.

  • PDF

A Study on the Risk-Management Based of Relief Train Operation (위험통제기반의 구원열차운전에 관한 연구)

  • Jeon, Young Seok;Lee, Hi Sung
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.191-198
    • /
    • 2014
  • In the event of continued train operation being impossible as the result of a breakdown, it will be essential to dispatch a relief train to recover the broken down train. Operation of relief train carries with the risk of collision in the process of connection with broken down train. The present study looks at the suitability of risk management procedures and associated problems in the light of case studies of relief train operation, and of national legal standards and railroad company regulations. It looks at appropriate methods of risk management and the problems that can arise. Based on the study a method is proposed of operating the relief train which is consistent with appropriate risk management. The proposed method will improve the safety of relief train operation, It is hoped that the results of the study will be reflected in relevant laws and operating company regulations, and so contribute to enhancing the overall level of railroad safety.

A Study of Systematization for Train Control Technique (열차제어기술 체계화 방안에 대한 연구)

  • Lee, Jae-Ho;Shin, Duc-Ko;Lee, Kang-Mi
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.2010-2016
    • /
    • 2009
  • Before introducing high speed train, train signal system was operated passively depending on a driver by signal lamp display. Now it is changing to onboard signaling system because of train speed increased(conventional track is 230km/h, high speed track is 380km/h), high speed. low speed freight train operation mixed, operation for high speed train in conventional track and dense operation. ie. ETCS(European Train Control System) Level 1 is introducing. Also, in case of high speed train, the train control system of France was introduced and has operated from 2004, now we have a difficulty for rising speed more than 300km/h because of commercial operation speed limited as 300km/h. Therefore, it need to establish the train control technique according to trackside surroundings and develope standard system like European ERTMS/ETCS, China CTCS(Chinese Train Control System), Japan D-ATC(Digital Automatic Train Control). In this paper, we derive the systematization method for Korea train technique by network-oriented, information-oriented, intelligence-oriented and combination-oriented corresponding train development direction. Proposed method has a merit to prevent cross by mixed operation with existing system and improvement after validity demonstration and system development and supply train system to meet user requirement in exporting.

  • PDF

Detection Method Analysis for Train Correct Position Stop in Manual Operation for PSD System (수동운전 방식에서의 PSD시스템을 위한 정위치정차 판독방법 분석)

  • Lee, Moo-Ho;Yang, Gi-Hee;Park, Jung-Soun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1678-1684
    • /
    • 2007
  • Platform Screen Door(PSD) has been installed in train manual operation section(ATS/ATC) by SeoulMetro since 2005. PSDs are now operating at 17 stations in SeoulMetro lines. As a result, it increases the safety of passenger, makes a comfortable platform and saves the energy of air conditioning. For PSD operation, train shall stop within 600mm of the train stop reference point. In train manual operation section, the detection system of train position is required to notify the train driver of train position and to ensure the condition that train stops the correct position for PSD operation. To detect the train stop position, the optical sensor shall be installed at platform. However, in case of SeoulMetro lines, the detection criterions of the train correct position stop are different because of using various types of trains which have different size and shape of front cars. In this paper, to solve this problem, the precise detection algorithm of the train stop at the correct position is used, and Laser distance measure sensor is introduced to notify the distance form the reference point of the train correct stop to train driver. This system has been applying to Seoul Metro line total.

  • PDF

A Computation of Train Operation Curve Using the Train Characteristics (열차특성을 고려한 열차운전곡선계산)

  • Park, Soon-Gi;Kim, Yang-Mo
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.532-534
    • /
    • 1994
  • In this paper, the program for the train operation from the train characteristics and motion equation is presented. By the decision of the operation condition, the computation system for train operation(CSTO) can be developed successively. As some applications, the computation examples of the rheostatic- and the inverter-train are demonstrated.

  • PDF

A Study on Minimization of Train Delays and Train Operation Interruptions by RF Transmission System. (RF 통신시스템을 이용한 열차 운행중단 및 열차 지연의 최소화에 관한 연구)

  • Lee, We-Jae;Kook, Kwaung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1466-1472
    • /
    • 2008
  • To minimize the train operation interruptions and train exchanges, the RF transmission system is proposed. The current control room of the Seoul Metro has information of the train movement through the Total Traffic Control System, but it does not have information of the train itself, rail status, and other facilities' status. When some trouble occurs during train operation, the train crews should report the control room about the trouble and fix it. If the control room has exact information of the trouble, the expert in the control room can help the crews to fix the trouble swiftly and exactly. Since the crews are busy taking care of the trouble, they often miss to report the control room on time. The proposed RF transmission system relays the information of the train to the control room automatically in real time, and makes it possible to provide the passengers good service by reducing the train operation interruptions and train exchanges.

  • PDF

PSD Door Response Time Improving Method in Train Manual Operation Mode (수동운전방식에서의 PSD 출입문 신호반응 시간 개선 방안 연구)

  • Lee, Moo-Ho;Kim, Chan-Cum;Lee, Suk-Jong;Lee, Soo-Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.559-571
    • /
    • 2008
  • Platform Screen Door(PSD) has been installed and operated at seoul subway line $1\sim4$ in the manual train operation mode(ATS/ATC) by SeoulMetro since 2005. SeoulMetro uses the wireless (RF) communication system and the train door detection system for the link between the train and PSD doors opening/closing motion in the manual train operation mode. For the convenience and safety of passengers, the train doors and the PSD doors opening/closing shall be synchronized as much as possible. In ATO(Automatic Train Operation) mode which provides the interface between train control system and PSD system, ATO signaling system makes the train doors and PSD doors open/close command signals systematically, so PSD doors can be opened/closed almost simultaneously with the train doors. But, in the manual train control(ATS/ATC) mode, PSD system needs to detect the train doors open/close operation and make PSD open/close command signals to actuate PSD doors. These PSD open/close commanding process cause time delay of PSD doors opening/closing motion in response to the train doors opening/closing motion. Sometimes the response delay time can be over 1 second, which is not proper to operate PSD, and need to be reduced This paper presents the reduction method of the PSD response delay time to improve the convenience and safety of passengers.

  • PDF