• Title/Summary/Keyword: Train Performance

Search Result 1,494, Processing Time 0.031 seconds

Improvement of the Railroad Signalling Equipment using GPS and Wireless Telecommunication (GPS 및 무선통신을 이용한 철도신호설비 기능향상)

  • Choi, Kyu-Hyoung;Choi, Dae-Seob
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.460-462
    • /
    • 2004
  • This paper gives a basic data of improving the performance of railroad signalling equipment by adopting GPS and wireless telecommunication technologies. These approach enable the moving block control of train, which can optimize train operation by reducing the distance between trains and maximize the railroad capacity. These method of detecting train position and controling train movement can also improve the train route control at stations.

  • PDF

The train automatic speed control using a fuzzy control (퍼지제어기법에 의한 자동운전 전동차속도제어)

  • Byun, Yeun-Sub;Kim, Yong-Kyu;Shin, Duc-Ko
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2164-2166
    • /
    • 2003
  • An automatic operation of train is executed by an automatic train operation(ATO) system. The main function of ATO system is to control train speed. So it makes the train stop at the programmed position accurately and improve riding comfort. In this paper, A fuzzy control is designed for speed control. The simulation is executed for verifying the speed control performance of the fuzzy system and comparing with that of the conventional PI.

  • PDF

A Study on the Propulsion and Braking Performance of the High Speed Freight Train with Composing the Rolling Stocks Formation (차량편성구성에 따른 고속화물열차의 추진 및 제동성능 분석 연구)

  • Han, Seong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.4
    • /
    • pp.298-302
    • /
    • 2016
  • Currently, logistics are in small quantities and in diverse forms, and the amounts are continuously increasing. Railway logistics however are losing their market share every year mainly due to low operation speed and loading time, which means the trucks are covering the most of the freights. In order to solve these situations, this paper proposed the high speed freight train as working multi-modality with other modes to make effective transshipment. The high speed freight train has maximum operation speed of 300km/h and electric power to run centralized power supply. There are large dual door system, bogie system covering fluctuating load of 15[ton], automatic loading device, ULD(unit load device) bed and ULD locking system in this freight rolling stock. We calculated the performance of powering and braking capacity for this train and proposed how many vehicles are composed of train set. The results in this paper can help to make a decision to define the technical specification of High-speed freight train for the efficiency of rail freight service.

A study on the Critical speed of Korean Tilting Train Hanbit200 (한국형 틸팅열차 한빛200의 임계속도에 관한 연구)

  • Kim, Nam-Po;Kim, Jung-Seok;Park, Tae-Won
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.257-263
    • /
    • 2007
  • The critical speed above which the vehicle become unstable is one of the items that should be verified in the development of a new train. In the case of a high speed tilting train, which requires both higher critical speed and higher curving speed, the critical speed should be more carefully treated because the both requirements are in conflict with each other in the conventional train design. The main purpose of the present work is to estimate the linear and non-linear critical speeds of 200km/h Korean Tilting Train 'Hanbit200' under development. The newly developed self-steering mechanism was attached to the tilting train to ensure that the critical speed falls under the lower yaw stiffness which is needed to secure higher curving performance. The simulation for predicting the critical speed was done by a commercially available vehicle dynamics software. A full scale roller rig test was carried out to validate the numerical results and to verify the effectiveness of the self-steering mechanism.

Train Performance Characteristics of Korean Rubber-Tired AGT System by TPS (TPS를 이용한 한국형 고무차륜경량전철(K-AGT)의 성능특성 분석)

  • Lee Dong-Hyong;Goo Dong-Hoe
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.799-804
    • /
    • 2005
  • In this work, the characteristics of train performance of Korean rubber-tired AGT system(K-AGT) are evaluated by using TPS(Train Performance Simulation) and these results are compared to those of other LRT(Light Rail Transit) systems. The performance characteristics of K-AGT was analyzed by comparing the scheduled speed and the energy consumption in case of station interval change and rail track condition change in, the scheduled construction line. In the scheduled construction line, scheduled speed of K-AGT was no difference with other systems and energy consumption was less than other LRT's. In case station intervals are increased, scheduled speed of K-AGT shows similar increasing rate and in curved and graded track conditions K-AGT has no difference in scheduled speed with other systems. As a simulation result by track condition change, when the track which is smaller than curved line of 250m dominates more than $50\%$ in whole track, K-AGT is similar to other systems to the point of scheduled speed and there is advantage in energy consumption.

  • PDF

2D Modeling and Brake System Simulation of a Train (철도차량 2D 모델링 및 제동시스템 시뮬레이션)

  • Kang, Chul-Goo;Kim, Ho-Yeon;Goo, Byeong-Choon
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.811-816
    • /
    • 2008
  • Train dynamics affects significantly safe and efficient operation of a train, especially during traction or braking period. Train dynamics is intrinsically complex due to many DOF motions in a three-dimensional space, and its behavior during the braking stage is too complex to understand and design an effective braking logic of the train. In this paper, we present a two-dimensional model with three DOF motion in a longitudinal, vertical, and pitch direction for the Hanvit 200 tilting train, which is efficient to analyze a braking performance. Furthermore, we analyze the braking logic and simulate the braking process of the Hanvit 200 tilting train using Simulink.

  • PDF

Automated Assessment System for Train Simulators

  • Schmitz, Marcus;Maag, Christian
    • International Journal of Railway
    • /
    • v.2 no.2
    • /
    • pp.50-59
    • /
    • 2009
  • Numerous train operating companies provide training by means of driving simulators. A detailed analysis in the course of the rail research project 2TRAIN has shown that the simulation technology, the purposes of training and the overall concept of simulator-based training are rather diverse (Schmitz & Maag, 2008). A joint factor however are weak assessment capabilities and the fact that the simulator training is often not embedded into the overall competence management. This fact hinders an optimal use of the simulators. Therefore, 2TRAIN aims at the development of enhanced training and assessment tools. Taking into account that several simulators are already in use, the focus lays on the extension of existing simulation technology instead of developing entirely new systems. This extension comprises (1) a common data simulation interface (CDSI), (2) a rule-based expert system (ExSys), (3) a virtual instructor (VI), and (4) an _assessment database (AssDB). The foundation of this technical development is an assessment concept (PERMA concept) that is based on performance markers. The first part of the paper presents this assessment concept and a process model for the two major steps of driver performance assessment, i.e. (1) the specification of exercise and assessment and (2) the assessment algorithm and execution of the assessment. The second part describes the rationale and the functionalities of the simulator add-on tools. Finally, recommendations for further technical improvement and appropriate usage are given. based on the results of a pilot study.

  • PDF

A Study on Transient Analysis of Linear Induction Motor with Ununiform Airgap for Shallow-depth Underground Train (저심도철도용 선형유도전동기의 공극 불균일 과도특성 분석 연구)

  • Lee, Hyung-Woo;Park, Chan-Bae;Won, Sunghong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.5
    • /
    • pp.723-729
    • /
    • 2013
  • This paper presents an parallel type Linear Induction Motor with ununiform airgap for a shallow-depth underground train with 100‰ grade and 15 m curvature. This parallel type LIM has enough gradability but has inherently ununiform airgap between center and end parts. Consequently, performance when the train passes curved section should be considered with transient analysis. Moreover, general parallel operation, 1C2M which is usually used for train operation, deteriorates LIM performance because of different line velocity between inner and outer LIMs. Transient analysis has many problems such as huge model, lots of meshes, very long calculation time, truncation error and so on. This paper has presented a novel technique using equivalent linear rotating model in order to solve these problems and has analyzed parallel type LIM by using the proposed technique. Finally, LIM performance according to independent operating control has been investigated.

A Study on Overall Measurement System Development of HEMU-400X (HEMU-400X 종합계측시스템 개발에 관한 연구)

  • Ryu, Sang-Hyun;Hong, Jun-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.484-488
    • /
    • 2011
  • Technologically advanced railway countries had a unique ability to design, test and evaluation systems for development of High-speed train system. To evaluate the performance of the train system in Korea for the development of advanced measurement technology and systems are needed. In this study, the Overall Measuring System(OMS) is going to be established to efficiently verify the performance, stability and reliability of the train system and the components, and verify of the maximum speed though an on-line test. OMS consist of vehicle measuring system, pantograph measuring system, video monitoring system and monitoring room was constructed for the overall measuring system and monitoring system. The results of this study were expected to contribute to technical improvement for evaluation of train system.

Aerodynamic performance of a novel wind barrier for train-bridge system

  • He, Xuhui;Shi, Kang;Wu, Teng;Zou, Yunfeng;Wang, Hanfeng;Qin, Hongxi
    • Wind and Structures
    • /
    • v.23 no.3
    • /
    • pp.171-189
    • /
    • 2016
  • An adjustable, louver-type wind barrier was introduced in this study for improving the running safety and ride comfort of train on the bridge under the undesirable wind environment. The aerodynamic characteristics of both train and bridge due to this novel wind barrier was systematically investigated based on the wind tunnel tests. It is suggested that rotation angles of the adjustable blade of the louver-type wind barrier should be controlled within $90^{\circ}$ to achieve an effective solution in terms of the overall aerodynamic performance of the train. Compared to the traditional grid-type wind barrier, the louver-type wind barrier generally presents better aerodynamic performance. Specifically, the larger decrease of the lift force and overturn moment of the train and the smaller increase of the drag force and torsional moment of the bridge resulting from the louver-type wind barrier were highlighted. Finally, the computational fluid dynamics (CFD) technique was applied to explore the underlying mechanism of aerodynamic control using the proposed wind barrier.