Many changes in the railway environment has directly affected to the railway company. To cope immediately with the influence of environment and to promote productivity, the railway company has to introduce an efficient train operation system and related core technologies. The railway system is composed or large-scale infrastructures ann high-cost trains. Simulation method is one or core technologies and also is efficient tool for planning and analyzing this kind of complex system. The purpose of this research is to develop multi-train traffic simulator considering high-speed train for GyongBu-Line. To achieve this objective, the elements of railway system was analyzed, and as a result, a data structure modeling for the railway system such as rail-Tine infrastructure, rain, timetable and operational route is presented. The developed simulator is composed of three major part : input-module, main-module, and output module. The concept and brief explanation of each module will be treated.
Park, Su-Myung;Song, Moon-Shuk;Son, Young-Jin;Lee, Hi-Sung
Proceedings of the KSR Conference
/
2011.10a
/
pp.1412-1417
/
2011
Safety is soaring up as a core value in accordance with the recent improvement of operating speed & incidents. rolling stock is a kind of system which works together with several components. one component has an effect on the sub-system, which can cause to the train safety operation, therefore reliability management of the major components of rolling stock is a kind of solution to the safety operation of train, but realistically maintenance in korea performed based on period rather than TBO of major components, but Japan does new maintenance system based on the major components, which optimizes maintenance tasks. actually Japan can apply to new maintenance system because they are ready in planning step but in this study, making a reliability data of major components and review the adaptability of new maintenance system to the rolling stock operating in Ansan line.
Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.
To get competitiveness in international markets, it is essential to provide low acquisition, maintenance and operation cost with high reliability, availability and maintainability. It can be achieved by lowering development cost, making proper maintenance planning and scheduling strategies, allocating man power and logistic cost properly. In this paper, we introduces the research on making a model for estimating the life cycle cost of newly developing magnetic levitation train system in Korea. To develop a proper life cycle cost model, we broadly analyzed specs and standards and compared the life cycle cost model developed in other country. Finally, we suggests strategies to develop an unique model for the magnetic levitation train system developing in Korea.
Proceedings of the Korean Geotechical Society Conference
/
2000.03b
/
pp.117-124
/
2000
This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.
This paper aims to suggest the feasibility of rapid operation scheme generated in preceding study, 'A study on development of operation planning for rapid service in urban railway(An introduction)' through application it to present subway lines in Seoul Metropolitan area. In case of line 3, without the Passing Track 'Turning train outstrip mode' is the best policy. In case of line 4, with the Passing Trank 'Passing track mode' may be the best way to realize the this scheme. Also, there is feasibility in the line 1, line 5, line 6, line 7 but there is no possibility it is applied to line 2 and line 8. In conclusion, this paper is intend to suggest the possibility of rapid operation in urban railway by presenting real operation scheme, time tables and amount of power usage and the number of composing trains and variety of demand,
Proceedings of the Korean Society of Computer Information Conference
/
2011.06a
/
pp.23-24
/
2011
본 논문에서는 승객 수송수요 반영 단계에서는 역별 승하차인원, 시간대별 재차인원 등 수송수요에 반영할 기준을 설정하여 수송력과 승차인원의 기준을 판단하고, 열차운행계획 수립 단계에서는 운행구간, 선로용량, 선로조건 등 제약조건과 적정수송력에 맞는 운행계획을 수립하고, 마지막 단계에서 경제성, 능률성, 합리성 등을 감안한 운용효율 향상을 위한 열차 DIA를 작성하고자 한다. 또한 통계적 분석절차에 따라 재차인원과 운행횟수를 각각의 독립변수와 종속변수로 산정하여 두 변수간의 상관관계를 확인한 후 회귀분석을 통해 얻은 회귀식을 실제열차운행 횟수와 비교하여 최적의 열차운행횟수를 산정하였으며 회귀식의 유효성 검증을 통해 열차운행 환경변화에 신속하게 대응할 수 있는 유연한 시스템을 구축한 후 서울도시철도공사 실용 Dia에 적용하여 유효성을 검토하였다.
Railway stations are important facilities for transport of passengers and freights. The location of station have an effect on the efficiency of railway transport and operation. In this study, an inspection of the primary factors for station spacing in urban railway has been performed and a review for the propriety of the present states and further improvement has been carried. It may be helpful for proper decisions on the route planning in urban railway. Primary factors for station spacing are 1)train capacity, 2)competitiveness with other transportation, 3)accessibility and 4)construction cost, which is out of consideration in the inspection. From the result of this study, the proper station spacing is about 600m for the accessibility, more over 1.03km for the train capacity and more over 1.4km for the competitiveness with other transportation.
This paper presents a novel simulation of dynamic voltages in AT-fed railway power supply. Proposed algorithm is efficient and simple by using the circuit decoupling and iteration method. To verify the proposed method, we used real condition operating data and performed a several case studies. Under train is constant power, we separated each AT section to calculate a loop current, train voltage on any position. Finally, this result utilizes a planning and operation of electrical railway systems.
Computerized simulation is becoming an indispensable procedure in the stage of planning, design, and operation of railway systems. This paper presents result of simulation technique for describing electrical performance of the power supply system which comprises the substation, catenary, feeder, and rails where multiple trains are running using result of train performance simulation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.