'Meyer' zoysiagrass(Zoysia japonica Steud.) is a popular turfgrass species used for transition zone golf course fairways and tees in mfd U.S.A golf courses because it is generally winter hardy while providing an excellent playing surface with minimal chemical and irrigation inputs. However, its functionality declines easily in many of the shaded areas of these courses. Reduced irradiance causes excessive shoot elongation, reduced tillering, and weak plants that are poorly suited to tolerate or recover from traffic and devoting. Trinexapac-ethyl (TE) effectively reduces gibberellic acid (GA) biosynthesis and subsequent shoot cell elongation. This study was initiated to evaluate TE effect on shoot elongation and stand persistence under two levels of shade in 'Meyer' zoysiagrass. A mature stand of 'Meyer' was treated with all combinations of three levels of shade(0%, 79%, and 92%) and three levels of monthly TE [0, 48 $g{\cdot}ha^{-1}$ a.i(0.5x) and 96 $g{\cdot}ha^{-1}$ a.i(1x)]. In full sun, the TE at 48 $g{\cdot}ha^{-1}$ a.i reduced clipping yield by 18% over a four-week period and, whereas the TE at 96 $g{\cdot}ha^{-1}$ a.i by 30% to 38%. Monthly application of TE at the 96 $g{\cdot}ha^{-1}$ a.i increased 'Meyer' tiller density in full sun and under 79% shade. Both rates of TE consistently reduced shoot growth under shade relative to the shaded control. Only the monthly applications of the TE at 96 $g{\cdot}ha^{-1}$ a.i consistently delayed loss of quality under 79% shade. Our results indicate TE can be an effective management practice to increase 'Meyer' zoysiagrass persistence in shaded environments.
Altunisik, Ahmet Can;Bayraktar, Alemdar;Ozdemir, Hasan
Smart Structures and Systems
/
v.10
no.2
/
pp.131-154
/
2012
In this paper, it is aimed to determine the seismic behaviour of highway bridges by nondestructive testing using ambient vibration measurements. Eynel Highway Bridge which has arch type structural system with a total length of 216 m and located in the Ayvaclk county of Samsun, Turkey is selected as an application. The bridge connects the villages which are separated with Suat U$\breve{g}$urlu Dam Lake. A three dimensional finite element model is first established for a highway bridge using project drawings and an analytical modal analysis is then performed to generate natural frequencies and mode shapes in the three orthogonal directions. The ambient vibration measurements are carried out on the bridge deck under natural excitation such as traffic, human walking and wind loads using Operational Modal Analysis. Sensitive seismic accelerometers are used to collect signals obtained from the experimental tests. To obtain experimental dynamic characteristics, two output-only system identification techniques are employed namely, Enhanced Frequency Domain Decomposition technique in the frequency domain and Stochastic Subspace Identification technique in time domain. Analytical and experimental dynamic characteristic are compared with each other and finite element model of the bridge is updated by changing of boundary conditions to reduce the differences between the results. It is demonstrated that the ambient vibration measurements are enough to identify the most significant modes of highway bridges. After finite element model updating, maximum differences between the natural frequencies are reduced averagely from 23% to 3%. The updated finite element model reflects the dynamic characteristics of the bridge better, and it can be used to predict the dynamic response under complex external forces. It is also helpful for further damage identification and health condition monitoring. Analytical model of the bridge before and after model updating is analyzed using 1992 Erzincan earthquake record to determine the seismic behaviour. It can be seen from the analysis results that displacements increase by the height of bridge columns and along to middle point of the deck and main arches. Bending moments have an increasing trend along to first and last 50 m and have a decreasing trend long to the middle of the main arches.
To cope with the limits of conventional O-D trip matrix collecting methods, several approaches have been developed. One of them is bilevel Programming method Proposed by Yang(1995), which uses Sensitivity Analysis Based(SAB) algorithm to solve Generalized Least Square(GLS) problem. However, the SAB a1gorithm has revealed two critical short-comings. The first is that when there exists a significant difference between target O-D matrix and true O-D matrix, SAB algorithm may not produce correct solution. This stems from the heavy dependance on the historical O-D information, in special when gravel Patterns are dramatically changed. The second is the assumption of iterative linear approximation to original Problem. Because of the approximation, SAB algorithm has difficulty in converging to Perfect Stackelberg game condition. So as to avoid the Problems. we need a more robust and stable solution method. The main purpose of this Paper is to show the problem of the dependency of Previous models and to Propose an alternative solution method to handle it. The Problem of O-D matrix estimation is intrinsically nonlinear and nonconvex. thus it has multiple solutions. Therefore it is necessary to require a method for searching globa1 solution. In this paper, we develop a solution algorithm combined with genetic algorithm(GA) , which is widely used as probabilistic global searching method To compare the efficiency of the algorithm, SAB algorithm suggested by Yang et al. (1992,1995) is used. From the results of numerical example, the Proposed algorithm is superior to SAB algorithm irrespective of travel patterns.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.10
no.5
/
pp.23-35
/
2011
The pedestrian green time is usually long at wide width intersections. This sometimes causes the increase of delay on the whole intersection because of long cycle length and thus small g/C ratio on some direction. In this paper, to improve these problems, staggered pedestrian crossing was evaluated on the vehicular and pedestrian aspects. The results were gained by using both TRANSYT-7F and VISSIM model. The vehicle control delay of the staggered pedestrian crossing was estimated to be decreasing than that of the general pedestrian crossing by 14.9% to 85.6%. The pedestrian average delay of two pedestrian crossing systems was examined by analytical method and VISSIM. According to the analytical method there was no significant difference between each pedestrian crossing system. The pedestrian delay of staggered pedestrian crossing was from 13.4% to 22.3% than the general pedestrian crossing by VISSIM. In conclusion, the staggered pedestrian crossing was more effective than general pedestrian crossing for both the vehicle and the pedestrian. However this conclusion was resulted from micro simulation where traffic volume condition, v/c, was from 0.8 to 1.1.
In general, the patients who transferred to the hospital by 119 rescue service at night go to the emergency room(ER) of general hospital rather than that of their nearby the 1st(clinic) and 2nd(local hospital) hospital. And the hospital is mainly selected not by 119 EMST but by patients or his/her conservators. Therefore we had studied retrospectively with emergency situation diary and medical chart for 697 patients of being transferred to one emergency medical center for 6 months since January 2004, and results are as follows. 1. The 280 patients(42.5%) of being transferred hospital at night by 119 rescue service were not emergency case and their average staying time in hospital was about $7.15{\pm}10.06$ minutes. 2. Transfer time was distributed in each time intervals of 1819, 2021, 2223, and 2401 and patients ratio in each intervals were 15.1%, 17.8%, 16.4%, and 15.2%. 3. In response of ambulance, the average time from the spot to the hospital was $14.53{\pm}9.27min$. and average distance of that was $7.95{\pm}9.21km$. 4. Diseases rather than traffic accidents or traumatic injury were main causes of ambulance calling and its value was 533(76.5%), and accidents were mainly occurred in patients' house and its value was 479(68.7%). 5. In time of transfer by 119 rescue service, hospital was mainly selected by patient/conservator and its value was 648(93.0%). In result. the hospital was selected not by EMST but by patient/conservator. 6. The case that the 1st grade EMT was rode in ambulance was 161(23.1%), and the case that 2nd EMT and emergency team member who educated for emergency were rode in ambulance were 504(72.3%). So the number of the 1st grade EMT was short in fire station of Kwangju metropolitan city than other city. 7. The first aids for patients before reaching hospital were limited to oxygen inhalation, airway control, and BLS for maintaining limbs and spine. So it seems to be a simple patients transfer. Consequently, to establish an efficient emergency medical system, it has been thought that it should be advanced a moderate education and public information about the appropriate use of emergency medical system toward citizen, and also need the hospital selection by the patients categorizing standards for 119 rescue service member, securing the 1st grade EMT, appropriate first-aids education, and securing professional human power in emergency room of the Ist(clinic) and 2nd(local hospital) hospital at night.
When a lateral load is applied to a short pile whose embedded depth is relatively smaller than its diameter, an overturning failure occurs. To investigate the behavior of laterally loaded short piles, several model tests in laboratory scales had been carried out, however the behavior of large moment carrying piles for electric poles, traffic sign and road lamp, etc. have not been revealed yet. This paper deals with the real-scale load tests for 750 mm diameter short piles. To simulate the actual loading condition, very large moment was mobilized by applying lateral loads to the location 8 m away from the pile head. Three load tests changing the pile embedded lengths to 2.0 m, 2.5 m, and 3.0 m were carried out. The test piles overturned abruptly with very small displacement and rotation before the failures. These brittle failures are in contrast with the ductile failures shown in the former model tests with the relatively smaller moment to lateral load ratio. Comparisons of the test results with three existing methods for the estimation of the ultimate lateral capacity show that the method assuming the rotation point at pile tip matches well when the embedded depth is small, however, as the embedded depth increases the other two methods assuming the inversion of soil pressure with respect to rotation points in pile length match better.
Double deck tunnels are considered to have a large demand in a near future for solving traffic congestion problems and overcoming the limitations in constructing new tunnels. This study presents a numerical investigation using finite element (FE) analysis on the behaviors of the tunnels and the stability of pillars in a divergence section where single tunnel is diverged from a main line double deck tunnel. The effects of the separation distance between the diverged and the main tunnels and the ground condition were examined through the FE analysis by varying the separation distance from 0.1D to 2.0D (D: diameter of main tunnel) and the rock class from class I to V, respectively, and the analysis results were compared with those using empirical methods, strength-stress ratio, and the volume of interference. The FE analysis results indicated that the separation distance has a larger effect on tunnel behaviors, compared with the rock strength, and a single tunnel with a large cross section is more favorable than two separated tunnels for tunnel stability when the separation distance is below 0.7D.
Journal of Korean Society for Geospatial Information Science
/
v.20
no.1
/
pp.33-41
/
2012
BIS is an arrival guidance system which is able to supply passengers with bus service condition via Kiosks at a bus stop, internet and mobile service through pinpointing bus location in real time. It is very significant to improve the quality of traffic information by quality control of GIS-based bus network so as to maintain navigational information and to implement reliable BIS. Therefore this study aims to build criteria to quantitatively evaluate data quality of the product in accordance with the process in bus network data and to suggest guideline of quality control. To achieve this, we have categorized geometric and logical errors occurring during constructing bus network database by giving a specific case study on TAGO and set up sectional guideline and procedures to examine database for systematic and coherent quality control management. Proceeding from what has been said above, the outcome of our research leads to quality guarantee for objective and reliable bus network database and is fully expected to bring benefit of providing a more accurate public transportation information and improving reliability of BIS through preventing a variety of errors in system operation in advance.
Kim, Jaehwan;Seo, Dong-Woo;Jung, Kyu-San;Park, Ki-Tae
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.3
/
pp.246-252
/
2020
Safety accidents have been reported due to falling accumulated snow from cables of cable-supported bridges. In addition to the direct damage caused by falling snow, secondary damage, such as traffic accidents, can occur. Various methods have been proposed to prevent these accidents, but there are still problems in safety and practicality. In this study, a cable robot type was selected as one of the active methods for removing accumulated snow on cables. An attempt was made to increase the climbing ability of the robot to improve the efficiency of snow removal. In addition, the available range of cable diameter for the robot can be adjusted flexibly to be applied to cables used in the field. A high-resolution camera was also installed to check the surface condition of the cable in real time to increase the utility, and be used as a cable inspection robot. A three-axis accelerometer and a tension conversion algorithm were added to measure the tension force of cables. To verify the performance, indoor and field experiments were conducted, and future improvements for the inspection robot were proposed.
Kim, Sung-Ho;Suh, Young-Chan;Cho, Yoon-Ho;Park, Kyung-Boo
International Journal of Highway Engineering
/
v.3
no.2
s.8
/
pp.131-140
/
2001
Concrete pavement of Jungbu Expressway composed of CRCP(Continuously Reinforced Concrete Pavement) and JCP(Jointed Concrete Pavement). The CRCP was firstly constructed and applied to new expressway in Korea. It is a good source of the study to analyze the performance of CRCP and JCP because it experiences same amount of traffic and environmental loading. Up to the present, condition survey has conducted several times during 13 years but roughness measurement has not been carefully conducted. Through comparisons among several types of pavement(CRCP, JCP, Asphalt) by roughness, CRCP is superior to JCP. In addition, connected sections in the highway such as bridges and tunnels that have higher IRI values, about 5mm/m, than normal sections should be considered appropriated maintenance such as diamond grinding. The relationship between IRI and distresses carried out by Korea Highway Cooperation in 1999 skewed that the number of crack is related to IRI value in JCP, while other distresses of JCP and CRCP are not shown clearly. The comparison study with IRI values between Jungbu Expressway and GPS-3(JCP) and GPS-5(CRCP) of LTPP data also showed that roughness of Jungbu Expressway is not inferior to that of the state. Some of section showed larger values of IRI are linked with under-9round structures for passages and drainages. The overall performance considering only roughness, the CRCP is also superior to JCP in sections with under-ground tunnels.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.